You are on page 1of 33

Over view

Population: 39,162,100 *
Capital City: Khartoum (3.1 million) *
* Languages: Arabic (official), local dialects
Religions: Muslim, Christian, locals beliefs *
*Latitude/Longitude: 15 65'N, 32 48'E
*Land Area:2,376,000 sq km (917,374 sq
miles)
Power Station For The National Grid
Units Total Capacity MW
No. Of
Power Station Date
Units Capacity Installed Available
MW Cap MW Cap MW
HYDRO P.S
1972
ROSSIERS 7 40 280 280
1989

SENNAR 1962 2 7.5 15 14

GIRBA KAPLAN TURBINE 1964 2 5.3 10.6 10.6

GIRBA PUMPS 1964 3 2.4 7.2 7.2

JABAL AULIA 2003 8 3.6 30.4 20.8

TOTAL 343.2 332.6


STEAM P.S

Dr. SHERIEF (1) 1984 2 30 60 53

Dr. SHERIEF (2) 1994 2 60 120 103

TOTAL 180 156


DIESEL P.S
Atbara 1985 6 2.86 17.2 10.4

GIRBA 1984 2 3.5 7 4

KASSALA (1) 1982 4 1 4 2

KASSALA (2) 1990 1 3.5 3.5 2

KASSALA (3) 1993 3 1.6 4.8 3.9

FAO 2004 2 6.3 12.6 10

TOTAL 49.1 32.3


GAS TURBINES P.S
1986 1 20 20 14
Dr. SHERIEF (1)
1986 2 25 50 30
Dr. SHERIEF (2)
1986 1 15 15 8
KUKU (1)
1986 1 12 12 10
KUKU (2)

TOTAL 97 62

COMBINED P.S
2003 6 35 210 172
GARRI (1)
2003 3 40 120 84
GARRI (2)

TOTAL 330 256

TOTAL NATIONAL GRID 1023 838.9


Power Station For The ISOLATED AREAS
Total Capacity MW

Power Station Date No. Of Units Installed Available

Cap MW Cap MW

Port Sudan 1983 51 58.56 37.2

Wadi Halfa 2004 3 1.8 1.5

Dongola 1981 11 17 9.1

Karema 2004 4 10.2 6.6

Elobied 1987 4 12.7 12

Umrawaba 1994 5 3.2 2.9

Nyala 1985 4 9.4 6.6

ElFasher 1983 9 11.24 7.05

Cont
ElGInina 1989 5 3.12 2.24

Aldaeen 2004 2 2 1.4

Kadogly 2004 2 2 1.6

Elnehood 2004 2 2 1.6

Juba 1986 5 5 1.6

Malakal 2002 3 2.6 1.6

Wau 1983 2 1.6 1.4

TOTAL ISOLATED AREAS 142.4 94.39


National Electricity corporation
HYDRO POWER
PLANTS
STATION POWER Hmax Hmin No. of units
(Mw)
Rossiers 40 38 17 7

Sennar 7.5 17 5.8 2

Girba 1 5.3 40 20 2

Girba 2 2.4 30 10 3

J.Aulia 3.6 5.4 2 8

Merowe(70% 125 60 20 10
constructed)
1. Potential sites on existing Irrigation Dam (Sennar dam).

2. Potential sites on existing Canal( Jazeera, Managil and


Rahad canals) .

3. Potential sites on seasonal rivers (Sayteet ,khor abu


Habel ,Elgash,Rahad,Dindir)
Hydroelectric stations have a long life and many
existing stations have been in operation for more
than half a century and are still operating
efficiently.
Hydropower station efficiencies of over 90% are
achieved making it the most efficient of energy
conversion technologies.
Hydropower offers a means of responding within
seconds to changes in load demand.
1. We have a visit to the proposed locations to
know the available head, flow and civil
constructions.
2. During the visit the members agreed to meet
the local leaders of the areas and discussed
this matter with them.
3. We do not restricted to the proposed
locations only but, we choose many suitable
places to give complete study .
It starts from Mainelshareef at the right bank of the
blue Nile ,where it is provided with supplies of
water by the pump station of Mainelshareef .
The canal passed thought the sayphon of Dinder
river and joint Elrahad river at Abu Rakham dam.
In the autumn the canal is feed by the water of the
river dam .
STATION GATES(NUM,DIA) MAX MAX DIS ESTIMATE CONECT TO CITIES OR
HEAD(M) (M^3/S) D POWER GRID VILLIAGES
AROUND

kilo 76 N=3,3*4M,MANUAL 1.5 40.5 0.36 11KV 2 VILLAGES

kilo 36 N=4,4*4M,MANUAL 2 69.4 0.83 11KV 3 VILLAGES

kilo 22 N=6,4*4M,MANUAL 1 86.8 0.52 11KV 4 VILLAGES

kilo 0 at rahad N=6,5*5M,MANUAL 0.5 99.5 0.30 NON MANY VILLAGES


main canal

kilo0 at abu N=9,5*6.5M,MANUA 6 162.0 5.8 NON MANY VILLAGES


Raham dam(3 L
month only)
It starts from Sinnar dam.
It goes in the north direction parallel to
Elmanagil canal until kilo 57.
After kilo 57 they are separated and the
Jazeera canal continuing to the north.
STATION GATES(NUM,DIA) MAX . HEAD MAX DIS ESTIMATED CONECTION CITIES OR
(M) (M^3/S) POWER TO NEC GRID VILLIAGES
(MW) AROUND

kilo 0 from Senar N=14,5*3M,MANUAL 6.5 218.8 8.5 SENNAR SUB SENNAR
dam

kilo 77 N=4(2P),3*3.75M,MANUAL 2.3 150.5 2.1 11KV 5VILLAGES

kilo 57 N=6(2P),3*3.75M,MANUAL 2.5 162.1 2.4 11KV 4 VILLAGES

KILO 108 Beaka N=3,3.5*6M,MANUAL 2.3 92.6 1.3 AVAILABLE MANY


VILLAGES
kilo 0 Sennar dam
It starts from Sinnar dam.
It goes in the north direction parallel to
Eljazeera canal until kilo 57.
After kilo 57 they are separated and the
Managil canal having the west direction.
STATION GATES(NUM,DIA) MAX MAX ESTIMATED CONECTION CITIES OR
,MANUAL HEAD(M) DIS POWER (MW) TO NEC GRID VILLIAGES
(M^3/S) AROUND
kilo0 main canal at N=11,5*3M 6.9 183.4 7.59 SENNAR SUB SENNAR
Sennar dam

kilo 57 Germany magor N=5,4*4M 2.5 136.6 2.04 11KV 4VILLAGES

kilo 57 Sudanese magor N=4,4*4M 2.0 46.3 0.55 11KV 4 VILLAGES

kilo 12 Elshareef Mokhtar N=5,4*4M 1.5 138.9 1.25 11KV 2 have electricity one
have not

kilo 77 Wad Elameen N=2,4*3M 2.5 13.9 0.2 11KV MANY VILLAGES
Mongataa major

kilo 77 Matoug major N=3,4*4M 2.5 28.9 0.43 11KV MANY VILLAGES

kilo 8 at Matoug magor N=2,4*3M 2.5 23.1 0.34 11KV MANY VILLAGES

kilo 17 at Matoug magor N=3,3.5*6M 2.5 17.4 0.26 11KV MANY VILLAGES