Professional Documents
Culture Documents
EVOLIUM
A9100
INTELTEC EMIRATES
FIROSE PADATH - INTELTEC EMIRATES 1
Logical position of BTS in
BSS
INTELTEC EMIRATES
FIROSE PADATH - INTELTEC EMIRATES 4
BTS Circuit
Indoor BTS Breakers
(BCB)
Network Interface
Card
Shelf # 5
External Alarm Circuit
Board (EACB)
Combiners
Shelf # 4
Shelf # 3
TRE
Shelf # 2
SUMA Card
Shelf # 1
Network Interface
External Alarm Circuit Card
Board (EACB) BTS Circuit
Breakers
(BCB)
Abis 1
Transmitter
Connector
Antenna
Connector
Receiver Connector
Equipment Label
Module
Extractor
Receiver Connector
Antenna
Connector
The Twin Wide Band Combiner stage (ANY) combines up to four transmitters into two
outputs, and
distributes the two received signals up to four receivers
Twin Wide Band Combiner module (ANY) is only necessary for sectors with five or
more TRXs
Transmitter
Connector Equipment Label
ON/OFF Switch
USB Test
Connector
Receiver Connector
LEDs
Lock Fastener
The TRE performs the digital functions interface to the SUM and the analog
functions interface to the AN module
Interface Test Provides an interface to the TRE for factory test purposes.
TX Provides the transmit RF Interface to the AN module.
Abis Connector
Equipment Label
BTS Terminal
Connector
Test Connector
USB Connector
Select All
Select Appropriate
Module
Select OK
FIROSE PADATH - INTELTEC EMIRATES 34
SUMA Card = OMU 1 Rack A (BTS Cabinet #
1)
Shelf # 2
Slot # 7
RA 1= Combiner 1
Sector A
VSWR Value=1.1
VSWR Value=1.2
Select Module
Disable
Reset
FIROSE PADATH - INTELTEC EMIRATES Restart 37
Execution
Result State of the Module
Selected (NEQ/OPR/IT)
Module Type
End Modification of HW
Configuration
Select Module
to Remove
Click Yes
Warning Window
appears
Click OK to Restore
SUMA Card
Verify Environment
Abis1 = Chain end
position Verify CRC Check = ON
Result window
appears
Firose Padath
Inteltec
FIROSE PADATH - INTELTEC EMIRATES 87