Why bother?
What is a mathematical model?
Process
Measured Inputs Model
Predicted Outputs
Model Parameters
Example of a Model
Pi = Fi - Ri Ci + Aij Rj Cj
Measure (Sample)
Simulate (Optimize)
Measure (Sample)
For Useful Simulation Studies
Process knowledge
Suitable models and an understanding of the
model limitations
Good quality data to develop parameters
A useable computer/software system
Engineering judgement to assess results
Process Design Studies
Based on data from sources other than the
operating plant
Ore - laboratory testing
Machine - other operations (JKTech Data
Base)
Less accurate than optimization
Gives information about likely circulating loads
Allows sensitivity analysis
JKSimMet Development - I
JK - from Julius Kruttschnitt Mineral Research
Centre
Sim - from Simulation (50 years of JKMRC
Research)
Met - from Metallurgical Processes (perhaps a
little optimistic)
JKSimMet Development - II
JKSimMet is useful for
crushing and screening
mass balancing
JKSimMet Development - III
1970s Fortran IV and punched cards
1981/2 Fixed flowsheet simulator
1983/4 JKSimMet V1 (Hitachi + PDP11)
1985 JKSimMet V2 (PC AT + PGC)
1988/9 JKSimMet V3 (Halo)
1992/3 JKSimMet V4
1999 JKSimMet V5.0 for Windows
2001 JKSimMet V5.1 for W 2000 & NT
2003 JKSimMet V5.1 for XP
2006 JKSimMet V5.2
2012 JKSimMet V5.3
2012 JKSimMet V6.0
JKSimMet Development - IV
JKSimMet V6
Move into the more modern JKSimFloat structure
Provision for multi-component modelling
Possibility of expanded capability across processes
JKSimMet V6 Enhancements
New drawing package
Better control of positioning of flowsheet items
Can still use V5 icons
Auto labeling of streams and equipment
Control of icon and stream properties (colour, thickness etc)
Conversion of all experimental sizings to master sieve series
Simplified simulate, balance, model fit and graph interfaces
Data input and editing through configurable stream overview and info
blocks
More flexible info blocks
Enhanced SD control and data entry
Extensive Help files
Simulation manager
2D Mass Balancing
Simulation Process
Build flowsheet or use existing flowsheet
Assign characteristics
Machine dependent parameters
Engineering/Geometry (from measurements or
drawings)
Model Parameters (from model fitting or data
base)
Ore dependent parameters (from ore testing)
Simulate
Assess the results
Important Concepts
Project
Flowsheet
Equipment
Streams
System, Project file, Flowsheet
Equipment
list
Flowsheet
list
Stream
Equipment labels
label
Project
The block of data which is a pair of identifiable
files (with .jksm6 and .jksysdb extensions)
Can contain several independent flowsheets
Flowsheet
A combination of equipment and streams
connecting the equipment
Can be renamed
Cell Colours
Black text on white background - User entered
generated
Toolbars - I
Main Toolbar
Toolbars - II
Flowsheet Toolbar
Toolbars - III
Engine Room Toolbar
Flowsheet Colours
Blue Outline - on the select list
Simulation - I
Convergence
Unknown
Known
Simulation - II
Convergence Controls
Assumption about circulating stream
Zero
Measured
Last time
Convergence Limit
0.1 to a very small number x Volume flow of
circulating stream
Assess Results
Data in streams and equipment
Data in labels
Graphs
Overview
Standard and configurable
Streams and equipment
Print
Copy and Paste
Build a Flowsheet Walk Through
Open a new file
Choice of Icons V5 or V6
Add equipment
Moving, rotating, flipping, changing size of icons
Naming equipment
Icon properties
Labels
Add streams
Single click or right click to add/remove nodes
Moving streams
Must have product streams
Labels
Entering Data
Lock the flowsheet
Set up sieve series
For simulation, just need the master series
For analysing survey data, may need multiple sieve series
Can copy and paste data into groups of streams using Survey Data entry