The main objective of the design is to
determine the proportion of the ingredients that
will produce concrete of the proper workability
when fresh and the desired durability and
strength after it has hardened.
The principal factors that must be considered
in proportioning concrete are:
1. Requirement as to placing.
2. Interrelationships of cement content,
1. Choice of slump.
2. Choice of maximum size of aggregate.
3. Estimate amount of mixing water and water content.
4. Select water cement ratio. Maximum permissible values
for non-air entrained concrete are indicated in Table III-l.
5. Calculate cement content.
6. Estimate quantity of fine and coarse aggregates.
7. Adjust for moisture content of aggregates.
8. Check calculated mixture proportions by preparing and
testing trial batches. Adjustments are made, if found
necessary.
If any of the above criteria is prescribed by the job
specifications, then there is no choice . The
requirements in the specifications shall govern.
Corrections/ Adj.:
Corrections = - 3.45 %
C- 40 40
D=6 A = (6)2/4
1 ft
C.A. =145.2kgs./152.72kgs./m3
=0.0935 m3; 0.0935 m3/0.0283 m3 =3.30
3.0
18.39 kgs.
18.39 kgs.
Cement = 1 / 0.1111
= 9.0 bags / cu.m.
Laboratory Data :
Reqd.:
Class of Concrete - - - - - - -- A
Comp./Flexural Strength---3,500 psi/650 psi Tested
byMid-Point
Method @ 14
days
C.F. ------- 9.0 bags/m3
Slump -----76.2 mm.
Type & Brand of Cement - - - Portland
Cement (Holcim)
Sp. Gr. Type 1 Cement - - - - - 3.15
= 1/ 9.0
= 0.1111
m3
Absolute Volume of Cement = 40/ 3.15 x 1000
= 0.0127 m3
= 0.0159 m3
= 0.o286 m3
= 0.0825 m3
Corrections/ Adjustments:
% Sand = 31
Corr.
1. W/C = [( 0.40 - 0.57)/ o.05] +_ 1
= - 3.4
2. FM = [ (3.73 2.75) / 0.1 ] +_1/2
= 4.9
3. Slump = 76.2 76.2 / 25.4
= 0/ 25.4
= 0
4. Manufactured Sand - - - - - - --- Natural Sand = 0
Corrections = - 1.5
= 0.0243
= 0.0582
Abs. Volume Sp. Gr. U.W. of H2O
Uncorr. Wts.
Total - - - -
-266.4
Corrected Wts. Batch Wts.
C - 40 40
Total - - - - - - - 266.4
For Concrete Beam Sample :
H = 6
W = 6
L= 3H+3
For CBS:
A = 21 x 6
Numbers of Layers = 2
= 63
One (1) Bagger Mixer