Building 06 Elevator
Deficiencies Details of functional Details of cleaning
1. PIT
a. Pit cleaning Required All the dust is
removed
b. Pit Ladder Present Have a small
staircase
c. Pit Emergency Stop & Bell Have a placed on
Working the side
2. SHAFT
a. Full Shaft Cleaning Cleaning the shaft is
done
b. Cleaning & lubrication to Cleaning is done
be done for guide rails
c. Guides shoes Guide shoes
properly
d. Limit switches/ levelling Functional
sensors
Building 06 elevator
Deficiencies Details of functional Details of cleaning
d. Hanger rollers Its works
e. Landing door shoe Its works Cleaning is done
4. CAR
a. Car door alignment Correct door alignment
b. Car lights Have placed lights 80 percent cleaning
c. Full height sensors Its works
d. gong/ buzzer/ You hear the buzzer/
intercom/
Emergency power functional
supply
f. Inside car/ COP All buttons works Cleaning is done
buttons
g. Fan working It is rotating the fan Cleaning is done
h. Car top condition Good condition Cleaning is done
i. Oiler cups Have oil inside the Cleaning is done
Building 06 elevator

Deficiencies Details of functional Details of cleaning


5. CONTROLLER/
PROGRAMMING
a. Wire tracing & duplexing Tech. do not know
b. Controller wire dressing Arranged properly
6. MACHINE/ MACHINE
ROOM
a. Machine room condition Good condition Cleaning is done
b. Machine lights room Only 1 its works 80 percent cleaning
c. Machine room air con Not tested open
d. Gear oil to be changed Tech. do not know
Building 06 elevator
All inside in the control panel room is cleaning is done.

Prepared By: Submitted to: Submitted To:


Bryan Paul C. Hermosura Engr. Tarek Yusuf Engr. Amru Aly
Q.A Coordinator-mechanical Mechanical Engineer Project Manager