Content

Preparing for Commissioning

2G Flexi BTS Manager


Local Commissioning
Save Comissioning Data Report

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 2

1. Preparing For Comissioning


Check phisical instalasi BTS ( Modul, Cabling, Antenna )
sudah komplit.
Laptop install 2G Flexi BTS Site manager
Ethernet cable 10/100 Mbit/sec untuk connection ke BTS
PES & DBCR ( Provide From RNP )
Check Database BTS harus sudah ada di FBSC
Check kelurusan transmsisi dari BTS ke sisi BSC.
Visual check untuk menghindari kesalahan instalasi :
> Grounding Connection
> Power supply Connection
> Cable Connection ( Power Cable & Optical Cable )
> RF Jumper Connection
Check LED Status setelah power ON

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

2. 2G FLEXI BTS MANAGER

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 4

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

3. Local Comissioning

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 9

Update Software Version :


1.Klik BTS SW
2.Update version
3.Setelah selesai BTS otomatis reset

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 10

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 11

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 12

Change Manually then klik Next

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 13

Add RF Module base on Datafill

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 14

Select type & number of RF Module

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 15

Add Sector 1,2,3 & input TRX Config

Sector 1 = 1-3 trx per trx power 20W

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 16

Tick antenna use & value feeder loss & VSWR Value

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 17

Klik Next

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 18

Klik Next

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 19

Klik Next

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 20

Please fill product code & serial number ( System Module


, RF Module , Transmission Module )

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 21

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 22

Select 2E1 use with CRC use

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 23

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 24

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 25

Create ABIS Mapping allocation appropriate ROC Parameter


Microsoft Office
Excel 97-2003 Workshe

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 26

Send SCF & Waiting BTS Restarting

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 27

5. Comissioning Data Report

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 28

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 29

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 30

Security Level:

Thank You

www.huawei.com

www.huawei.com
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

You might also like