You are on page 1of 5

Report in Elevator

Building 06
Radium Rakah Al Khobar K.S.A

DECEMBER 08,2016

Building 06 Elevator
Deficiencies

Details of functional

Details of cleaning

1. PIT
a. Pit cleaning Required

All the dust is


removed

b. Pit Ladder Present

Have a small
staircase

c. Pit Emergency Stop & Bell


Working

Have a placed on
the side

2. SHAFT
a. Full Shaft Cleaning

Cleaning the shaft is


done

b. Cleaning & lubrication to


be done for guide rails

Cleaning is done

c. Guides shoes

Guide shoes
properly

d. Limit switches/ levelling


sensors

Functional

Building 06 elevator
Deficiencies

Details of functional

d. Hanger rollers

Its works

e. Landing door shoe

Its works

Details of cleaning
Cleaning is done

4. CAR
a. Car door alignment

Correct door alignment

b. Car lights

Have placed lights

c. Full height sensors

Its works

d. gong/ buzzer/
intercom/

You hear the buzzer/

Emergency power
supply

functional

f. Inside car/ COP


buttons

All buttons works

Cleaning is done

g. Fan working

It is rotating the fan

Cleaning is done

h. Car top condition

Good condition

Cleaning is done

i. Oiler cups

Have oil inside the

Cleaning is done

80 percent cleaning

Building 06 elevator
Deficiencies

Details of functional Details of cleaning

5. CONTROLLER/
PROGRAMMING
a. Wire tracing & duplexing

Tech. do not know

b. Controller wire dressing

Arranged properly

6. MACHINE/ MACHINE
ROOM
a. Machine room condition

Good condition

Cleaning is done

b. Machine lights room

Only 1 its works

80 percent cleaning

c. Machine room air con

Not tested open

d. Gear oil to be changed

Tech. do not know

Building 06 elevator
All inside in the control panel room is cleaning is done.

Submitted to:
Prepared By:
Engr. Tarek Yusuf
Bryan Paul C. Hermosura
Q.A Coordinator-mechanical Mechanical Engineer

Submitted To:
Engr. Amru Aly
Project Manager