MALABAR CEMENT TOWNSHIP

COMPANY TOWN

SITE:
The site selected for the township is a
heavily wooded promontory jutting into
wayalar lake.
The site plan organises some 400 housing
units grouped in a clusters of twelve along
the pedestrian spine.
Some parts of this spine is bridged to
create larger units and delineate public
spaces.
It also consists of a simple loop road
which is also used to reach the picnic
spots near the lake.

PUBLIC FACILITIES INCLUDE


Small market near the entrance gate
School
Guest house
Dormitory for bachelor workers
Community spaces

SERVICES : ELECTRICITY,
DRAINAGE
SEPTIC TANK : 6 Septic
tanks are provided
beyond the A type
housing where the waste
from 2 lanes are
collected in one septic
tank.
The waste is collected
through underground
pipeline and works with
natural
drain
system
PARKING
: parking
is .
provided only for C type
and D type units .Other
groups construct sheds
or park it in the near by
areas
Waste collection points
provided
Street lights are fixed besides
the road .
ELECTRICITY : Electric
transformer is placed in an
open space next to the
temple, which provides
electricity to the entire

SERVICES : WATERSUPPLY
WALAYAR
DAM

WATER PUMP
ROOM
25 Horse
power x 2
motors

3 LAKH
LITRE WATER
TANK FOR
THE ENTIRE

GRAVITY SLOPE

2 UNDERGROUND SUMP 75000L


EACH

2 OHT 500l
EACH FOR
GROUND AND

SERVICES : FACILITIIES

TEMPLE :

A HINDU
TEMPLE IS THE ONLY
RELIGIOUS STRUCTURE IN
THE TOWNSHIP AS
PALAKKAD IS
PREDOMINANTLY HINDU.
CHURCH AND A MOSQUE
IS ALSO PRESENT IN THE
VICINITY. THERE IS A
SMALL PLAYGROUND IN
FRONT OF IT.

OPEN STAGE :

COMMUNITY HALL :

PARKING : parking is
provided only for C type
and D type units .Other
groups construct sheds or

RECREATIONAL
SPACE
FESTIVALS
PROGRAMMES

SOCIETY(STATIONARY/GRO

DISPENSA

GUEST

MEETINGS
FESTIVALS
SPORTS

Vegetation
Teak
Neem
Veti
Karunkali
Maruthe
Mango
Tamrind
Aaval
Ung

Electricity
Supply : From Malabar cement plant ,KSEB
No power shortage since its linked to the commercial
company plant.
Domestic supply to each houses separately
Street lamp posts after every 10m on the main central spine.
Transformer yard : behind temple.

Water supply
Supply : Walayar dam ,Malabar mill [ during summer]supplied
2 underground tanks :75,000L capacity supplied from walayar
dam by means of gravity.
Water treatment plant [ treated with chlorine]
Overhead main tank : 3,00,000L capacity
500L tank over each house . water supplied 3 times a day
providing a maximum of 1500L per house.
Water supply line : 3inch dia pipe line connecting each house
Total usage of water per day:3lakh liters
Maintance are done by company authorities.

Waste disposal
Collected over a tank at the end of each lane.
Burnt by authorities every alternative day.

Sump tank
Waste pipe running along the road connecting houses
on both sides.
Leads to a septic tank in teak plantation and to soak pit
Total 6 septic tanks maintained after every 3yrs.

KARIMADAM
Organised drainage grid system
Each houses have individual water tanks.
Water supply-(muncipal pipe lines)
Electricity not provided
Sewage lines are connected to municipal lines