20 June 2016
MAINTENANCE DEPARTMENT
Introduction
MAINTENANCE DEPARTMENT
Introduction
MAINTENANCE DEPARTMENT
Introduction
MAINTENANCE DEPARTMENT
Findings
MAINTENANCE DEPARTMENT
Findings
Operating procedure compliance: as per the operation log
book, there is no violation found.
No maintenance activity performed at the time of incident.
Maintenance history (as recorded in CMMS system):
Monthly monitoring and 3-month offline testing with WO
number 15-1431218 on 29th Dec 2015. Motor in normal
condition.
Preventive maintenance for LV motor PM-1107A with WO
number 16-1049940 on 29th Feb 2016. Motor in normal
condition.
MAINTENANCE DEPARTMENT
Findings
MAINTENANCE DEPARTMENT
Findings
Event recorded in EMCS:
At 8:35:24 on 29th April 2016, PM-1107A was tripped with the
event on EMCS Lockout relay operated 86.
Motor specification:
Rated power: 75kW
Pole number: 2
Manufacturer type: FLSN 280S
Manufacturer: Leroy Somer
Protection: Ex n, IIB, T3
MAINTENANCE DEPARTMENT
Findings
Site check:
Incomer 08B-SW-4-1-1B tripped by Earth fault, undervoltage in
REF542 HMI.
Motor tripped by Undervoltage, earth fault and TOL in INSUM HMI.
A power fuse was blown at phase L1.
MAINTENANCE DEPARTMENT
Findings
Site check:
Contactor damaged (contacts were melted inside)
Check the motor after incident:
Insulation resistance: (500Vdc testing)
U-V : 0; V-W: 0; U-W: 0;
V-E : 0; W-E: 0; U-E: 0;
DC winding resistance:
U1-U2: 0.04; V1-V2: 0.2; W1-W2: 0.4
U-V: 0.6; V-W: 0.6; U-W: 0.7
Motors winding PM-1107A was burnt out.
There is no trace of motors water ingress.
Motor is operating at around 80% capacity (94A), under rated capacity.
Incomer 08B-SW-4-1-1B was tripped due to earth fault.
The pump P-1107A is in normal condition (checked and confirmed by ROT
team)
MAINTENANCE DEPARTMENT
Findings
Site check:
Motors winding PM-1107A was burnt out at NDE.
MAINTENANCE DEPARTMENT
Findings
MAINTENANCE DEPARTMENT
Findings
Earth fault protection coordination 400V system:
With the existing design, the earth fault function for LV motor
is only applied for low earth fault current, high earth fault
current shall be protected by power fuses. And sometimes the
earth fault protection coordination between LV motor and
400V SWB incomer is not perfect. Some actions already done
to improve the earth fault protection coordination between LV
consumers and 400V SWB incomer.
MAINTENANCE DEPARTMENT
Findings
Earth fault protection coordination 400V system:
MAINTENANCE DEPARTMENT
Findings
Earth fault protection coordination 400V system:
Earth fault protection setting
Motor:
Low earth fault current: MCU 25A, 0,4s.
High earth fault current: Power fuse 315A.
400V switchboard incomer:
Relay Ref 542Plus:
CT ratio: 3200:1
Inst: 0,25 x CT sec (800A)
Time delay: 0,7s
Relay MK2200:
CT ratio: 1600:1
Inst: 0,51 x CT sec (816A)
Time delay: 0,95s
MAINTENANCE DEPARTMENT
Findings
Motor earth fault protection
MAINTENANCE DEPARTMENT
Findings
Motor earth fault protection
MAINTENANCE DEPARTMENT
Findings
Motor earth fault protection
MAINTENANCE DEPARTMENT
Findings
400V switchboard incomer earth fault protection
MAINTENANCE DEPARTMENT
Findings
MAINTENANCE DEPARTMENT
Findings
PM-1107A
MAINTENANCE DEPARTMENT
Findings
Earth fault protection coordination 400V system:
In 2014 (second Turnaround): implemented MOC-SUB-14-150 Carry out
Vendor recommendation to increase selectivity of earth fault protection for
400V switchboards in Refinery based on the Contract No. 453-2013/HDBDR-ENERSEV;
In 2015: On 31/3/2015 Electrical team already issued MOC-ELE-15-212
Change the MCC components to increase the selectivity of earth fault
protection for 400V switchboards in Refinery based on recommendations of
Contractor. On 30th December 2015, Electrical team already issued Service
request No. 453/DH-BDSC-E Request supply service to implement MOCELE-15-212 to increase reliability of earth protection for 400V
switchboards, this service will be applied for substation 1.
In 2016: Electrical team already issued Service request 328/DH-BDSC-E
dated 27/5/2016 Request supply service to implement MOC-ELE-15-212 to
increase reliability of earth protection for 400V switchboards, this service
will be applied for substations 4/8A/8B.
MAINTENANCE DEPARTMENT
Findings
MAINTENANCE DEPARTMENT
5-WHY
I. Incomer B of 8B-SW-4-1-1B activated
by earth fault
No
Question
Answer
MAINTENANCE DEPARTMENT
5-WHY
I. Incomer B of 8B-SW-4-1-1B activated
by earth fault
No
Question
Answer
MAINTENANCE DEPARTMENT
5-WHY
II. Motor PM-1107A burnt out
N
o
Question
Answer
Why motor
winding of PM1107A turn to
turn shorted?
MAINTENANCE DEPARTMENT
Immediate causes
Failure to detect/measure
Motor stators winding was shorted turn to turn
MAINTENANCE DEPARTMENT
MAINTENANCE DEPARTMENT
MAINTENANCE DEPARTMENT
MAINTENANCE DEPARTMENT
Lesson learnt
Study to apply the new technology/methodology on
preventive/predictive maintenance for motor to improve the
reliability of motor.
Expedite the PR/modification for the approved MOC to
increase the selectivity of earth fault protection for 400V
switchboards, MOC-ELE-15-212 Change the MCC
components to increase the selectivity of earth fault protection
for 400V switchboards in Refinery;
Update the specification for Dung Quat Refinery Upgrading &
Expansion Project