Airconditioning unit
Microwave
Electric fan
-Instruct the workers to stop the work and let them come back a day
after but construct a construction joint before leaving.
-Instruct your pouring guide to immediately set up a team to
dismantle the pipes of the concrete pump.
-Instruct the workers to scrape the poured green concrete away from
the depressed area as they move backwards to a stable area and
have the others provide additional shoring so that you may
continue with the pouring activity.
-Skip the said area and continue with the pouring since you need to
empty the contents of the Agitator truck ASAP to avoid concrete
wastage, but have the Safety engineers provide adequate shoring
and enclosed the depressed area with railings as a safety precaution.
shoring jack
base jack
telescopic u-head
channel
ordinary plywood
acoustical tile
marine plywood
fiber board
150mm
144mm
120mm
100mm
92mm
100mm
150mm
None of the above
Damper
Diffuser
Fire extinguisher
Sprinkler
To
To
To
To
make it lightweight
make if stronger
make it cheaper
allow heat insulation
3 pcs
2.9 pcs
5.5 pcs
none
tooled/dimpled
acid dipped
stainless
polished brass
Acid-dipping
Sandblasting
Rust converter
None of the above
1/3 span
span
span
None of the above
panel
hollow core
accordion
suspended/tracked sliding
I-beam
Header
Jamb
None of the above
bi-fold
roll up
sliding
flush
louver
casement
awning
sliding
1000 A
220 V, single phase
230 V, three phase
All of the above
Beam
Beam
Beam
Beam
bottom
bottom
bottom
bottom
is
is
is
is
in
in
in
in
tension
compression
shear
lateral
vertical
horizontal
vertical and horizontal
no reinforcements
pvc door
steel doors
roll up door
ficem board
90 fpm
100 fpm
120 fpm
130 fpm
Diaphragm
Floor
Shear wall
All of the above
CHB wall
Vertical mullions
Channel
Pilasters
Bush-hammered finish
Pebble wash-out finish
Granolithic finish
None of the above
Pre-formed accessories
Pre-bended accessories
Pre-shaped accessories
Pre-cut accessories
Vinyl sheet
Vinyl tiles
Rubber epoxy
Porcelain tiles
Virgin
With certain amount of alloy to enhance
properties
With impurities
Solid
Area rug/carpet
Wall-to-wall carpet
Carpet tile
Looped carpet
Semi-ducco
Ducco-varnish
Textured
Flat
Steel
Aluminium
uPVC
all of the above
Aesthetics
Control joints
Either of the above
Neither of the above
28W
21W
14W
7W
Aluminium
PE
Steel
Portland cement
Recording
Purchasing
Testing
Checking
Rubber Flooring
Vinyl Sheet
Asphalt Flooring
Linoleum Flooring
0.61 mm
0.40 mm
1.5 mm
1.24 mm
12-18 on center
14-16 on center
12-14 on center
None of the above
Inhibiting primer
Top coat
Shop coat
Red paint
2.47 kg/cu.m
100 kg/cu.m
9.8 kg/cu.m
1.70 kg/cu.
Elastomeric
Sahara
3.0 kg Polybond
4.5mm Polybond
Increase in rebars
Increase in concrete volume
No effect
Additional shoring
Truss
Arch
Vault
Roof
QDE
Latex
Lacquer
Automotive Lacquer
Liquefaction
No tie beam
Uplift force of soil
All of the above
Eggshell
Semi gloss
Gloss
Flat
Geodetic Engineer
Landscape Architect
Mechanical and Civil Engineer
Environmental Planner
Putty
Sealant
Cement mortar
Plaster
Sahara
4mm torch-on membrane
Elastomeric paint
3mm torch-on membrane
contractor
Bi-fold
Sliding
Swing
Roll up
UV radiation detectors
IR radiation detectors
Photoelectric detectors
Ionization detectors
Approved
Approved
Approved
Approved
Reverberation
Echo
Flutter
Focusing
Focusing
Flutter
Creep
Strike
0.60m
0.90m
1.20m
1.8m
0.60m 0.90m
0.75m 0.78m
0.45m 0.70m
0.70 0.85m
0.70m
0.60m
0.80m
1.20m
x
x
x
x
1.50m
1.20m
1.30m
1.60m
Dampers
Base isolation devices
Rollers
Pin devices
Bar level
Floor strainer installed on the floor drain
body
Nylon
300 x 300 mm tile
Unlevel flooring
Door quality
Jamb is un-square
Wrong installation methodology
Glazed tile
Vinyl
Quarry tile
Granite
Granite
Marble
Porcelain
Carpet
GI long span
Asphalt tile
Clay tiles
Metal shingles
Laminated plywood
Granite
Solid surface
Vinyl sheet
200
150
300
450
Satin
Matte
Mirror
Hairline
Circuit
Circuit
Circuit
Circuit
Wall Framing
Floor Framing
Slip Form
Ceiling Framing
Wall Framing
Floor Framing
Slip Form
Ceiling Framing
Wall Framing
Floor Framing
Slip Form
Ceiling Framing
Wall Framing
Floor Framing
Slip Form
Tunnel Form
Paupo
Palitada
Kostura
Rebokada
For alignment
Greater strength with less weight
For cost reduction
For mortar
Buckles
Deflects
Crushes
Revolves
Bored Pile
Sheet Pile
Isolated footing
Footings with Tie beams
Business (Office)
Commercial
Recreational
Entertainment
Business (Office)
Commercial
Recreational
Entertainment
Neo-classical
Modern Lines
Mediterranean
Decostructivism
Neo-classical
Modern Lines
Mediterranean
Deconstructivism
1
2
3
0
1
2
4, 1 for each floor
0
Elevator
Ramp from ground floor up to the third
floor
Sprinkler system
PVC windows
Cornice
Overhead cabinet
Moulding
Lumber board
overhead closet
peninsula closet
glass shelves in metal supports
closet
QDE
Latex
Enamel
Lacquer
acrylic
Latex
Enamel
lacquer
Microwave oven
Exhaust fan
Hand drier
Air conditioner
Jigsaw
Router
Hand saw
Chisel
Saw
Router
Spokeshave
bandsaw
CFL
Halogen
Fluorescent
Incandescent
Spire
Machine room with roof deck
Antenna
Beacon
6 meters
9 meters
10 meters
12 meters
bracing
metal furring
Sag rod
studs
Down conductor
Air terminal
grounding system
transmitter
2 sq mm 15 amps
5.0 sq mm 30 amps
3.5 sq mm 20 amps
Any of the above
2 sq mm 15 amps
5.5 sq mm 30 amps
3.5 sq mm 20 amps
Any of the above
the circuit breaker was too far away from where the short
circuit happened
the circuit breaker is defective
the capacity of the wire is too large
all of the above.
1.20
1.50
2.00
2.25
x
x
x
x
1.80
1.90
2.25
2.50
medium gray
medium beige
dark gray to black
light gray
coarse gravel
asphalt
red brick
poured or cast-on-site concrete
2.25
1.65
1.25
0.85
0.55
0.95
1.35
1.55
2.96
2.46
2.66
2.16
1.43
1.08
1.92
1.71
3.75
5.65
4.55
6.45
Red
Black
Yellow
Blue
6m
8m
10m
3m
Luffing crane
Telecopic mobile crane
Backhoe
Jack hammer
Ficemboard
Plywood
Plyboard
Lawanit hardboard
Condenser
Compressor
Evaporator
Expansion valve
Annealed
Tempered
Textured
Laminated
Per
Per
Per
Per
piece/section of aluminum
square foot
lineal foot
lineal meter
1800 psi
750 psi
500 psi
300 psi
1m
1.1m
1.2m
1.3m
12
18
24
28
3
4
5
6
42
36
48
23
Operating controls
Supervisory controls
Governor
None of the above
50-60%
60-80%
70-90%
80-96%
Grout
Injected mortar
Masonry epoxy
All of the above
Block
Wall
Pile
Combined
Large rock
Foam
Polyester
Brick
100m
120m
150m
160m
Quirk
Miter
Dado
Rabbet
MTS
ATS
UPS
AVR
#10
#8
#6
#12
Basciada
Mullion
Muntin
Astragal
ducting
mechanical vent
exhaust fan
all of the above
concrete neutralizer
Rat proofing
Termite proofing
Waterproofing
friction resistance
magnetic latch
hole and peg
hook and eye
5min
10 min
20 min
30 min