You are on page 1of 12

Project Description

PORTION.1
1.Construction of new Jubail Residential 380/230/115kV BSP
and intend to replace the existing Berri PP 230kV Switch
Yard.
2.Relocation of the existing two nos.120MVar Reactors from
Al FADHILI S/S to JUBAIL 380kV S/S along with its associated
control and protection equipment.
3.Temporary feeding arrangement to existing Berri 115kV
Substations from (502MVA) Power Transformer T-4 installed
at New Jubail Residential S/S.
4.Necessary protection modification/addition work at remote
end AL-FADHILI - JUAYAMAH,JUBAIL - SUDAIR and FADHILI
GHAZALAN P/P 380kV Substations due to the new 380kV
lines/feeding arrangements and BERRI 115kV Substations due
to temporary feeding from 502MVA Power Transformer T.4.
5.Necessary Installation/ protection modification/addition
work at 13No.s remote end Substations and 07 No's 230kV
Lines.

PORTION.2
1.Necessary Installation/ protection modification/addition
work at 06No.s 230kV and 08 No's 115kV remote end

Major Scope of Work


New Jubail Residential BSP
1. Installation of new 380kV, 3150A GIS C.Bs arranged in
one and half 1-1/2 Breaker configuration in order to
feed 08No.s 380kV Transmission line bays and 08No.s
Power Transformers Bays.
2. Installation of new 230kV, 3150A GIS C.Bs arranged in
one and half 1-1/2 Breaker configuration in order to
feed 12No.s 230kV Transmission line bays and 04No.s
Power Transformers I/C Bays.
3. Installation of new 115kV, 3150A (09No.s),2000A
(21No.s) GIS C.Bs arranged in single Breaker Double
Bus Bar configuration in order to feed 21No.s 115kV
Transmission line bays and 04No.s Power
Transformers I/C Bays.
4. Installation of 04No.s
(752.5MVA,380/230/13.8kV),04No.s (502.5
MVA,380/115/13.8kV) Power Transformers along with
proposed Grounding and Station Service
Transformers.
5. Laying /Termination of 230kV s/c 2x2500 sq.-mm per

RELAY CORORDINATION BLOCK DIAGRAM OF 380kV LINE INTERCONNECTION/SCOPE


JUBAIL RESIDENTIAL 380/230/115kV BSP S/S PROJECT

JUAYMAH 380KV
BSP

SET.1 ALSTOM P546


SET.2 SEL-411L

MEEDCO PROPOSED RELAYS AT JBR


ALL 380KV LINES
SET.1 ALSTOM P-546
SET.2 SEL-411L

NEW JUBAIL RESIDENTIAL


380/230/115 kV BSP
SET.1 ALSTOM P443
SET.2 SIEMENS
7SA52

SET.1 ALSTOM P443


SET.2 SIEMENS
7SA52

JUBAIL 380/230KV BSP

SUDAIR 380KV SS

GHAZLAN II 380KV SS
SET.1 ALSTOM P443
SET.2 SIEMENS
7SA52
SET.1 ALSTOM P443
SET.2 SIEMENS
7SA52

EXISTING LINE
NEW LINE
DELETED LINE

AL FADHILI 380/230KV SS
SET.1 ALSTOM P546

SIMPLIFIED BLOCK DIAGRAM OF380kV LINE INTERCONNECTION/SCOPE JUBAIL


RESIDENTIAL 380/230/115kV BSP S/S PROJECT

JUAYMAH 380KV
BSP
NEW JUBAIL RESIDENTIAL
380/230/115 kV BSP

JUBAIL 380/230KV BSP


SUDAIR 380KV SS

GHAZLAN II 380KV SS

AL FADHILI 380/230KV SS

EXISTING LINE
NEW LINE
DELETED LINE

SIMPLIFIED BLOCK DIAGRAM OF PROPOSED RECONFIGURATION OF 230kV LINE


INTERCONNECTION NETWORK JUBAIL RESIDENTIAL 380/230/115kV BSP S/S PROJECT
P.
1
FADHILI
380/230
KV SS

P.
1

P.
1

4b

JUBAIL 2
SUB1

JUBAIL
380/230
KV SS

KHURSANIYAH

P.
2

SAUDI
KAYAN
230kV

P.
1

P.
1

JUBAIL
NORTH
230kV

JUPC
230kV

JUBAIL
SOUTH
WEST 230kV

P.
2

P.
1

NIGC

JUBAIL
SOUTH
EAST 230kV

4c

P.
2
4a

BERRI
230KV

4d

JUBAIL
SWCC2B
P.
2

P.
2 NEW JUBAIL RESIDENTIAL
BERRI NGL

IBN
ZAHR
230kV

P.
1

JUBAIL
SWCC2A

JUBAIL
SWCC1A

230/230/115kV BSP
6

P.
2

P.
2

GHAZLAN
PP

SIMPLIFIED BLOCK DIAGRAM OF PROTECTION MODIFICATION115kV LINE


INTERCONNECTION JUBAIL RESIDENTIAL 380/230/115kV BSP S/S PROJECT

KHURSANIYAH
380/230
KV SS

JUBAIL-1
115KV SS

JUBAIL-6
115KV SS

JUBAIL-5
115KV SS

JUBAIL
NAVY
115KV SS

JUBAIL-4
115KV SS

JUAMAH
115KV SS

BERRI 115 KV SS
GOSP
1&2
115KV SS
NEW JUBAIL RESIDENTIAL
380/230KV BSP
EXISTING LINE
NEW LINE
DELETED LINE

Major Equipment

New Jubail Residential BSP


SR
.N
o

Equipment Detail

Make

Country

380kV GIS SWGR

HICO

KOREA

230kV GIS SWGR

ABB

SWITZERLAN
D

115kV GIS SWGR

HICO

KOREA

POWER TRANSFORMERS

HICO

KOREA

GROUNDING TRANSFORMERS

HICO

KOREA

SS TRANSFORMERS

ABB

KSA

13.8kV SWGR

ABB

KSA

BATTERY+ CHARGERS

BENNIN
G

FRANCE

LV AC& DC DISTRIBUTION

UNDER EVAUATION

10

230kV POWER CABLES

TAIHAN

KOREA

11

115kV POWER CABLES

ELSEWE
DY

EGYPT

ABB

KSA

Project Milestone
S.
No

Scheduled Dates

Description

CONTRACT # 4400004227

Portion.1 Portion.II
1

Technical Completion Certificate


(TCC)

28.02.2017 31.08.2017

Preliminary Acceptance Certificate


(PAC)

30.04.2017 31.10.2017

Final Acceptance Certificate


(FAC)

31.12.2017 31.12.2017

ACHIEVEMENT
ENGINEERING & DESIGN
All Major Design and Engineering works has
been completed and Approved except pump
house and fire fighting system.

ACHIEVEMENT
PROCUREMENT SCHEDULE FOR MAJOR
MATERIALS

All equipment's supplied except the following: HVAC PACU UNITS


HVAC AC SUPPLY PANEL
FIRE HYDRANT SYSTEM
PRECAST BOUNDARY WALL COLUMNS AND BEAMS

ACHIEVEMENT
CONSTRUCTION AND INSTALLATION

DETAIL OF WORK IN PROGRESS BUT SLOW


Provision of Termination Kits for 230kV cables
Installation of 380kV Gantries.
Installation of 230kV Out door DS/ES
Laying of FOC Cables for SAS system.
Laying of Cables GIS Online PDM system.
Continuity and Megger Insulation test of Laid LV
Cables.
Laying of balance LV cables for SST,230kV DS/ES.
Installation work of Small Power and Lighting.
Installation of 230kV Cables Link Boxes.