Company Profile

PT Bukit Asam Persero Tbk is a mining and energy company


which located at Jalan Parigi No 1 Tanjung Enim ,South Sumatera, Indonesia.
This company has vission that is being a world class mining and cenergy comp

Main Switch Station (MSS)


Main Switch Station is one of work unit that
had by PTBA. MSS is the place where all the
electricity supply gather from PLTU Bukit
Asam to cover all the electricity needed by
every department in mining unit Tambang Air
laya (TAL)

Our
Activities
On Monday 1st of august 2016
we have re-registration and safety induction
about safety in mining area
On Tuesday 2nd of august 2016
Introducing about electrical equipment and
tools in Main Switch Station
Discussion about power supply an d
distribution
On Wednesday 3rd of august 2016
At MSS, every Wednesday morning we have
a safety talk. On that day we discuss about
Index Protection (IP)
We go to Tambang Muara Tiga Besar Utara
(MTBU) to refill water of accumulator,
checking the spreader and we go to
Timbangan for changing Silica Gel for
transformer there.

On Thursday 4th of august 2016


Preventif maintenance forTransformer T3-1
dan T3-1/16 at Quary
On Friday 5th of august 2016
Taking Accumulator at Bengkel Utama for
Diesel Source 630 KVA
Moving the Generator Set 630 KVA for Belt
Wagon (BW) to transport BW.
Repair the lightning installation at Banko
Barat
On Monday 8th august 2016
Installing HPI Lamp 400 Watt at Temporary
Stockpile Banko Barat
On Tuesday 9th august 2016
Jointing Cable 12kV and 6 kV at TLS and KTT
Drawing Cable for HPI Lamp
On Wednesday 10th august 2016
Installing HPI Lamp 400 Watt at Temporary
Stockpile
Lightning Installation at White House Banko
Barat
Repairing roler for Craine

On Thursday 11th of august 2016


We have a safety talk about General Safety
Installing HPI Lamp 400 Watt at Temporary
Stockpile
Lightning Installation at White House Banko
Barat
On Friday 12th of august 2016
Moving Sulzer water pump 355KW from MTB
to MTBU
On Monday 15th august 2016
Monitoring Operational System at MSS
Measuring data of sulzer water pump and
transformer 8 MVA
On Tuesday 16th August 2016
Briefing about the job
Explanation about clam meters
On Thursday 18th august 2016
Briefing about the job
Monitoring system at mss
Observing parameters at electrical
equipments and tools at mss

On Friday 19th august 2016


Briefing about the job
Transporting NTSCGEWOEU 3x95+3x20/3 12/20(24)KV cable to
MTBU CC 21
Monitoring operational system at MSS
On Sunday 20th august 2016
Terminasition cable 20 KV at Sub Station 05 in MTBU
Installing Power Transformator 20 KV/400 V at Sub Station 05 in MTBU
Drawing Power Supply from Gardu Hubung Coal Conveyor 21 to
Incoming Trafo, paralel Power Incoming trafo with Trafo in CC 21
area
Installing Power 400 V at Switchgearin Sub Station 05 MTBU for Coal
Conveyor 21
On Tuesday 21st august 2016
Briefing about the job
Monitoring Operasional system at MSS
Observing parameters at electrical equipments and tools at mss