2002 FDOT/FTBA

Construction Conference
QC 2000 Concrete Specifications
Mike Bergin
State Materials Office
Email:
michael.bergin@dot.state.fl.us

The Presentation will include


Highlights of Changes to Section 346
A draft Resolution Procedure to assist
project personnel

April 3, 2002

2002 Construction Co

QC 2000

Is not NEW any more


But the specs have changed and the
major changes will be addressed today.
Jobs have been let under QC 2000 for
several years, as of July 1, 2002 all
FDOT projects will be let with QC 2000
Specifications approved by FHWA.

April 3, 2002

2002 Construction Co

Whats New in Section 346

New references to Section 6.8, 6.9 and 105


and reference to Chapter 9.2 in the
Materials Manual
Section 6.8 -Quality Control Program
Section 6.9 -Laboratory Qualifications
Section 105 -Quality Control Program
Requirements

April 3, 2002

2002 Construction Co

Whats New in Section 346


(cont.)

Chapter 9.2 of the Materials Manual (MM)


Information pertaining to concrete plants.

April 3, 2002

2002 Construction Co

Whats New in Section 346


(cont.)
Changes in almost every subsection.
This presentation will focus on the major
changes and how these changes affect
Construction and Materials.
Especially the relation between
Construction and Materials, and the
Resolution Process

April 3, 2002

2002 Construction Co

Standard Operating Procedures for


the Quality Control of Concrete
(SOP) is gone
The Level I of the SOP identified how
producers batched concrete to meet the
requirements of the Specification.
This information is now moved to Chapter 9.2
of the Materials Manual (MM), Concrete
Production Facilities Guidelines (CPFG) and
is located on the DOT website.

April 3, 2002

2002 Construction Co

Standard Operating Procedures,


is gone (cont.)

MM Includes the requirements for batch plants


such as:
Plant specific QC plan
QC plan no longer job specific
Design mix requirements (change)
Hot weather,old 346, mix temp is 94 F at
the end of the mixing cycle
Hot weather, new 346, mixes are held at
94 F during entire mixing cycle

April 3, 2002

2002 Construction Co

Standard Operating Procedures,


is gone (cont.)
The Level II from the SOP has been moved
directly into Section 346.
The Contractor describes how he will maintain
the quality of the concrete once it arrives at the
job site.

April 3, 2002

2002 Construction Co

Mass Concrete (3.1)

Requires a Specialty Engineer to formulate,


implement, administer and monitor the
temperature control plan.

April 3, 2002

2002 Construction Co

10

Mass Concrete (3.1)

Department no longer approves the plan but


accepts the Contractors proposed plan.
The responsibility is the Contractors to ensure
that the plan meets the specification.
Contractors QC Manager is responsible to
ensure the plan is followed during and after
placement.
No concrete is placed unless there is an
accepted Mass Concrete plan

April 3, 2002

2002 Construction Co

11

Sampling and Testing (5.1)

ASTM is now the standard for all concrete


tests except for following two FMs
early sampling of fresh concrete FM 5501
testing of chlorides in hardened concrete
FM 5-516

April 3, 2002

2002 Construction Co

12

Control of Quality (6.1)

The Contractor maintains one quality control plan


for his entire project.
The guidelines are identified in Section 6.8.
Section 5.6 of MM identifies QC information
for material producers
He is responsible to identify how the quality of
material will be maintained.
Failure to meet specifications or contract
documents voids that portion of the QC plan.

April 3, 2002

2002 Construction Co

13

Delivery Certification of
Concrete (6.3)

Delivery ticket requirements have been


moved to the Concrete Production Facility
Guidelines, Chapter 9.2 of the MM.
Batch Plant Operator (BPO) signs stating
that the batch was produced in
accordance with the approved design mix

April 3, 2002

2002 Construction Co

14

Delivery Certification of
Concrete (6.3)

The Contractor or his agent signs stating the


W/C ratio was not exceeded at the project
site and that the concrete meets the
requirements of the specs.

April 3, 2002

2002 Construction Co

15

Adding Water at the Placement


Site (7.7)

Contractor must perform a slump test


before any water is added to the load.

April 3, 2002

2002 Construction Co

16

Plastic Concrete Sampling and


Testing (8)

The Contractor is responsible for ensuring


that plastic properties, determination of the
w/c ratio and compressive strength of
cylinders are in compliance with the
Specifications.

April 3, 2002

2002 Construction Co

17

Plastic Concrete Sampling and


Testing (8)

Testing will be performed:


by CTQP qualified technicians.
on each lot of concrete from a random
load within that lot.

April 3, 2002

2002 Construction Co

18

Plastic Concrete Sampling and


Testing (8)

A Lot is 50 yd3 or one days production


which ever is less except for:
Pavt one lane mile or one days
production
I Special 150 yd3 or one days production
III Seal Each placement

April 3, 2002

2002 Construction Co

19

Plastic Concrete Sampling and


Testing (8)

The Department will randomly select 1 of


every 4 lots to compare QC with
Verification tests.
Use a Random number generator

April 3, 2002

2002 Construction Co

20

Plastic Concrete Sampling and


Testing (8)
3 consecutive lots or 5 lots in two days out
of tolerance (in the same mix) the
Contractor will suspend production from
this plant.
Department may perform independent
verification test any time.

April 3, 2002

2002 Construction Co

21

Acceptance Sampling and


Testing (9.1)

Contractor will cast a set of 3 cylinders from each


lot, from a random load within the lot
For each lot that the Department verifies with the
Contractor, cast an additional hold cylinder.
The hold cylinder will be used for resolution
if the QC tests do not compare with the
Verification tests.

April 3, 2002

2002 Construction Co

22

Acceptance Sampling and


Testing (9.1)

The laboratory performing the compressive


strength tests shall meet the requirements of
Section 6-9
The concrete is verified when the Contractors
quality control (QC) cylinders compare within 750
psi with the Verification cylinders.
If QC does not compare within the 750 psi of
Verification then the Engineer will initiate the
Resolution Procedure.

April 3, 2002

2002 Construction Co

23

Reduced Frequency for


Acceptance Tests (9.2.1)

If the Contractor can show consistency in


his QC tests, the sample frequency can be
reduced and lot size will be increased to
100 yds3.

April 3, 2002

2002 Construction Co

24

Acceptance of Hardened
Concrete (9.4)

When 1 of the 3 QC cylinders are lost, damaged or


destroyed,
Average the remaining 2 cylinders and payment
for the lot is reduced by 10%
When more than 1 of the QC cylinders is lost,
damaged, or destroyed
The contractor, at the discretion of the engineer,
will core the structure to determine if the
minimum strength is met and no payment is made
for that lot.

April 3, 2002

2002 Construction Co

25

Resolution Procedure (9.5)


Is initiated when QC and Verification do not
compare.
The Department may initiate an
Independent Assurance (IA) review of:
plastic properties
calculation of w/c ratio
handling of cylinders

April 3, 2002

2002 Construction Co

26

Resolution Procedure (9.5)


curing procedures
initial
final
compressive strength testing
cores may be required

April 3, 2002

2002 Construction Co

27

Resolution Procedure (9.5)

Hold cylinders are tested within 7 days of


the 28-day strength tests.

April 3, 2002

2002 Construction Co

28

Resolution Procedure (9.5)

Concrete is accepted based on the strength test


results deemed by the Department to be the most
accurate
If Verification is the most accurate, then
Verification represents the 4 lots, -Contractor
pays for the Resolution testing
If QC is the most accurate, QC represents the 4
lots, -Department pays for the Resolution
testing.

April 3, 2002

2002 Construction Co

29

Resolution Procedure (9.5)

When the Department cannot determine that


either QC or Verification data is in error, the
concrete representing the four lots will be
evaluated based on the results of the
resolution investigation.

April 3, 2002

2002 Construction Co

30

Rest of Section 346 relatively


unchanged

Same requirements for


Investigation of low strength concrete for
structural adequacy (10)
Pay adjustments for low strength
concrete (11)

April 3, 2002

2002 Construction Co

31

State Materials Office Develops a


Resolution Procedure:

The intent is to inform both Construction


and Materials personnel of a consistent
process in the event that Resolution is
needed on their projects.

April 3, 2002

2002 Construction Co

32

XXXXXXXXXXX

XXXXXXXXXX

These are the hold cylinders from the same load of concrete
April 3, 2002

2002 Construction Co

33

XXXXXXXXXXXXXXXXXXXXXX

April 3, 2002

2002 Construction Co

34

The DRAFT Resolution


Procedure will be available on
the SMO website.

April 3, 2002

2002 Construction Co

35

In General the DRAFT


Resolution Procedure identifies
what
is ofneeded:
At start
project, the Project Engineer
should designate one person to;
make data entrees and track cylinder
testing.
make the comparisons between QC and
Verification test results.
April 3, 2002

2002 Construction Co

36

After the Concrete is Placed:

When placement is completed, the plastic


property data should be entered into the 6
screen of the CQR system within one
working day of the concrete placement by
the Project Engineers designee.

April 3, 2002

2002 Construction Co

37

After the 28 day Strength Tests


are completed

QC and Verification Labs should notify the


Project Engineer, or his designee of test
results on the first working day after testing
and;
within 3 working days of obtaining the
data it should be entered into the 7 screen
of the CQR system

April 3, 2002

2002 Construction Co

38

CQR Codes
Verification Samples
V =Verification compares with QC
N =Verification did not compare with
QC
Project Engineer reviews the data and
verifies the comparison or non-comparison

April 3, 2002

2002 Construction Co

39

When QC and Verification do not


Compare

Notify your District Concrete Engineer


immediately
He may initiate an IA review of QC and
Verification procedures
He will notify the State Materials Office

April 3, 2002

2002 Construction Co

40

Transport the hold cylinders to


the designated Resolution
laboratory:
Each sample is accompanied with a new C22 card, with all information included.
The QC and Verification Laboratories will
enter a new 6 screen into CQR

April 3, 2002

2002 Construction Co

41

The Resolution Laboratory will


enter the 7 screen data and
indicate the status of the
resolution samples under new
codes.
April 3, 2002

2002 Construction Co

42

NEW CQR Codes for Resolution


Samples
RQ =Resolution confirms QC results or
both QC and Verification results
RV =Resolution results confirm Verification
results
RR =Resolution results do not confirm QC
or Verification results.

April 3, 2002

2002 Construction Co

43

If you have any questions


concerning these new CQR codes
please contact:

Glen Mans in Certifications at the SMO


(352) 337-3146
SC 642-3146
glen.mans@dot.state.fl.us

April 3, 2002

2002 Construction Co

44

Thank You for your time and


attention - Any Questions?

April 3, 2002

2002 Construction Co

45