Promotion Project
Presentation on
LETS Article and Explanation
Hydropower Plant
Team EDL training
Explanation of Chapter 3
dropower Electrical Plants
General
- 55 -
Dam
Transmission Line
G
G
Turbine
Low-voltage
Hydropower
Plant
Turbine
Hydropower Station
Substation
Distribution Line
Distribution
Transformer
(ex. 22kV/400V)
HV consumers sites
LV consumers site
MV consumers sites Switching Station
-
--, -- ------
---
----- ----
--
-:59 ---
-:60
---
-:61 - -- --
-:62
----
- --
:63 ---------
-:64 - ----
-:65 ------ -- --
-:66 ------- - -
-:67 ------------------
----, ---------
:69
.
:70
.
:71 * .
:72 .
:73
.
.
:74
:75 .
:76
.
.
:77
:78 SF6.
:79 .
:80 .
:81 .
:82 .
21
.
.
.
.
.
.
.
.
.
.
.
.
.
.
36
38
39
46
10
47
11
49
----
--[kV]
24
[mm]--
-- -
[mm]
220
[mm]--
- - [mm]
40.5
350
450
123
1100
1400
245
1900
2450
525
550
4100
5800
280
- 87
-
---- --- -- -
(1)
- -----
------ -
.
(1) Pressure withstand
Pressured parts of an oil pressure supply system and a
compressed air
supply system shall withstand and be no leakage with
respect to a water
pressure test at which pressure of water is 1.5 times the
design pressure.
However if a water pressure test is difficult to be performed,
the pressured
parts may be tested at 1.25 times the design pressure with
air or mixture
54
13
Reservoir
Water way
Surge tank
k
toc
ns
Pe
71
Inlet Valve
1.Have structure withstanding water
pressure at shut off the inflow
2.Have driving force to shut off
Draft tube
Tailrace
Thank
you for
your
attention