Optimized Production
Technology
OPT
9 OPT rules
1.
2.
3.
4.
5.
6.
7.
8.
9.
Routing
Operation
1
20
40
60
30
20
60
10
30
Operation
Job
20
X
Y
10
X
Y
20
X
Y
X
30
X
Z
X
Y
40
X
Y
50
Z
Z
60
70
80
Z
Z
Z
10
Z
20
Z
30
Z
40
Z
50
Z
60
X
70
X
80
X
90
X
100
110
120
130
140
150
160
X
Z
10
Z
20
Z
30
Z
40
Z
50
X
Z
60
X
Z
70
Z
X
80
Z
X
90
Z
110
Z
120
130
140
150
160
Z
X
100
X
Y
Z
10
Y
Z
20
Y
Z
30
Z
Y
40
Z
Y
50
X
Z
60
X
Z
70
Z
X
80
Z
X
90
Z
110
Z
120
130
140
150
160
Z
X
100
Makespan:
without OPT approach: 180 hours
with OPT approach: 160 hours
Machine utilization:
Machine
Without OPT
With OPT
44%
50%
33%
38%
56%
63%
28%
31%
Average
40%
45%
Theory of
Constraint
TOC
Principles of TOC
5 steps of TOC
1.
2.
3.
4.
5.
Measuring system
performance in TOC
Financial
Operational
Throughput
Inventory
Operating expenses (labor, overhead, etc.)
TOC technique
Cause-and-effect analysis (fishbone
diagram)
Evaporating cloud
Buffer management
Drum-buffer-rope
Cause-and-effect analysis
Buffer management
Buffer to maximize the
utilization of the constraint
max
actual
80
45
40
20
40
35
40
Raw
Materials
Peeler
Slicer
Cooker
Salter
Bag
Packer
Consumer
20
20
20
80
35
45 5
40 20 20
Drum-Buffer-Rope
DBR
Definition of DBR
12
WIP
A
Total 12
C
RM
FG
7
X 5.5
5
21
DBR mechanism
One way to insure the continuous
operation of the bottleneck is to use a
CONWIP mechanism from the beginning of
the line, up to and including the bottleneck
(the pull side)
Push the material downstream once it
passes the bottleneck (the push side)
Therefore, the DBR system is a mixed
pull/push control system
Raw
Materials
Peeler
Slicer
Cooker
Salter
Bag
Packer
Consumer
max
actual
80
45
40
20
40
35
40
Raw
Materials
Peeler
Slicer
Cooker
Salter
Bag
Packer
Consumer
20
20
20
80
35
45 5
40 20 20
max
actual
80
45
40
20
40
35
40
Raw
Materials
Peeler
Slicer
Cooker
Salter
Bag
Packer
Consumer
20
20
20
80
35
45 5
40 20 20
max
actual
80
45
40
20
40
35
40
Raw
Materials
Peeler
Slicer
Cooker
Salter
Bag
Packer
Consumer
20
20
20
80
35
45 5
40 20 20
max
actual
45
40
20
40
35
40
Raw
Materials
Peeler
Slicer
Cooker
Salter
Bag
Packer
Consumer
20
20
20
20
20
20
20
max
actual
80
45
40
40
40
35
40
Raw
Materials
Peeler
Slicer
Cooker
X2
Salter
Bag
Packer
Consumer
40
40
40
40
40
35
35