ENVIRONMENT POLICY
ZERO
General Requirements
Personnelarenotifiedanimminentofdefiniteemergencysituationbythe
activationofanalarmsystemorequallyeffectivemethod.
Alarmactivationsystemsaswellashorns/whistleswereprovidedinthe
constructionarea.
Personneltobefamiliarwithemergencyactionprocedure.
Theprojectplancontainstherequiredprovisionsfortheemergency
evacuations.
Thoseemployeesassignedspecificemergencydutiesundertheplanshouldbe
providedthenecessarytrainingandprotectiveequipmenttoensuretheirsafety.
Emergencyevacuationescaperouteandassemblyareasignsarepostedinthe
keyareas.
Emergencytelephonenumberspostedintheworksitewithcontractor
responsiblepersonincludingpublicemergencynumbers.
10
11
PERSONAL BEHAVIOUR
All employees of contractor shall behave
correctly and necessary courtesy towards his
colleagues, employees of other Contracting
parties and subcontractors representatives
of the Owner and third parties. Any person
misbehaving shall be liable for disciplinary
action. All unsafe conditions and acts shall
be brought to the notice of the Owner or his
representative and their recommendations
shall be complied.
13
14
15
Eye protection
Hand protection
Eye protection
Head protection
Foot protection
Vision protection
Hearing protection
Hearing protection
Face protection
16
Personal Protective
Equipment
Safety Goggles & Face Shields
17
Personal Protective
Equipment
Safety Helmets/hard hat
18
Personal Protective
Equipment
Safety shoes
Allworkforcesshallbegivena
pair of safety shoes with steel
toecaps.
19
Personal Protective
Equipment
BREATHING APPARATUS
Personal Protective
Equipment
FALL PROTECTION
Safetynets,Safetybelts,Harness,Lifelines
etc.shallbeusedwhileworkingathigher
elevationswhereitisnotpracticableto
provideworkingplatforms.SafetyBeltsshall
beprovidedtoallworkforcesworkingat
heightsabove1.8-mtrheightsfromground
level.
21
Personal Protective
Equipment
HAND PROTECTION
Suitablehandglovesshallbeused
forprotectionofhandsfromsharp,
heavy, and abrasive, chemical
burns, hot burns etc. while
handlingsuchharmfulsubstances/
materials.
22
Personal Protective
Equipment
EAR PROTECTION
EarMuffs,andEarPlugsshallbeused
fortheprotectionofearsfromhigher
noiselevels,exceed85dbora
continuous(fullbodyhearmask)
23
Housekeeping
24
Housekeeping
Before & after task
Proper order shall be maintained at work site. Waste
collection and waste disposal system shall be established right
from the beginning of the work at site.
Special precautions shall be taken while disposing of harmful
material.
Suitable bins shall be provided at convenient locations for
depositing the waste.
Passageways and walkways should be kept clear from all
obstructions.
Adequate lighting facilities shall be provided in the working
areas.
Proper arrangements shall be made for cleaning and
disinfections of all sanitary facilities.
25
SCAFFOLDINGS
26
SCAFFOLDINGS
Any work to be carried at height requires a
platform; contractor shall erect a proper
scaffolding of impeccable condition, with
proper handrails, mid rails, and toe boards.
Designated Competent person shall inspect
all scaffoldings before allowing anybody to
work upon them. Only tubular scaffolding
will be used on this project.
27
28
WORKING AT HEIGHT
All works beyond 1.8 meter height shall
have proper fall prevention systems viz.
Scaffoldings, platforms etc. apart from the
above all personnel shall be provided with
safety harnesses as line of defense.
29
HOISTING WORK
30
HOISTING WORK
All machines brought to the site for Hoisting
works shall be provided with health
certificate
after
duly
inspected
by
contractors equipment in charge before put
in to use. The capacity of device shall be
ascertained before using the same. Hoisting
equipment such as hoisting straps, chains,
steel ropes, hooks and clamps shall be of
good construction and without any defects.
Only a skilled operator will be allowed to
operate the hoisting equipment.
31
HOISTING WORK
All crane operation or hoisting work shall be
carried out under the supervision of rigger
(foremen).
32
HOISTING WORK
For any critical load the brakes, boom, hook, wire
ropes and pulleys, rope anchoring shall be inspected
thoroughly before the lift to ensure the cranes safe
operation by a maintenance person. All Mobile cranes
shall be parked on hard soil or strong base. They shall
not be placed near the edge of a pit or where
excavation is in progress. The crane operator shall
always operate the crane with the help of a welltrained signalman who renders proper signaling. Tag
lines shall be used while hoisting heavy and bulky
materials. The equipment maintenance department in
charge and safety engineer shall carry out a periodical
checkup of crane wire ropes, slings, and shackles for
any defects. Any faulty tools and tackles are replaced
immediately.
33
Working Alone or in
Isolation
34
Working Alone or in
Isolation
CONFINED SPACE
35
Working Alone or in
Isolation
36
37
38
Squeeze the
handle
Sweep side to
side
39
40
41
42
REFUSE UNSAFE
WORK
43
Right to Refuse
If they have reasonable cause to
believe that to do so would create an
undue hazard to the health or safety
of any person
44
Any questions?
45
Summary
If you eliminate or
lessen hazards
you improve your
safety
46