You are on page 1of 17

CED

FY: 2071/72 AND


2072/2073

Er. Murari Bhandari


Chief, Civil Engineering Division (CED)
TIACAO, Gauchar Kathmandu

Responsibility.in brief
2

Both Landside and Airside


R/W, T/W, Apron, Perimeter roads

Access road &Parking area

Landscape and beautification

Grass cutting

Various signage

Marking works

Construction/Modification of various canteens, security posts,


equipment yards and water proofing works

Cleaning and maintaining ITB/DTB/OA Bldg/VVIP Bldg

Runway/Taxiway Annual Maintenances

Up gradation of toilets at various parts

Water supply and sanitary systems

Security fencing

Solid waste management and environment engineering.


.. To sum Majority of Responsibilities

Major field of expertise


required

Airport engineers
Pavement engineers
Construction managers/engineers
Building construction and maintenance engineers
Survey and quantity surveyors
Geotechnical engineers
Structural Engineers
Environmental engineers
Landscaping and beautification experts
Architect and interior designing /decoration experts
Water supply and sanitary engineer
House keeping and sanitation experts
Drawing and draft person
Material engineering and testing (field/lab technicians)
Procurement experts

Projects (FY:2071/72)
4

S.N.
1.
2.

3.

4.

5.

6.

7.

Project Name & Contract No.

Project
Cost
(NRs)

Work
Start

Construction of Annex Domestic Terminal


109,089,414.70 2069-10-02
Building at TIA, 13/CMD/TIACAO/068-69
Annual Maintenance and Preservation of
Runway and Taxiway at TIA, Contract No.
2071-03-30
35,999,133.20
TIACAO/CED/13/070-71

Completion
Date

Remark
s

2072-03-29

2072-0629

Upto
Kartik

Marking Works for Runway, Aprons, Taxiways and


Airside
Roads
at
TIA,
Contract
No.
10,170,000.00
TIACAO/CED/02/071-72

2071-11-14

2072-11-13

Drainage Concreting Work at West Side of Runway


Strip, Contract No. TIACAO/ CED/03/071-72
13,390,031.05

2071-11-14

2072-05-13

Clean and Maintain the International Terminal,


Operation/ Airlines & Other Building Complexes at
2072-04-01
26,208,313.47
TIA, Contract No. TIACAO/CED/04/071-72

2073 Asar
Masanta

Cleaning Works at Domestic Terminal Building and


2072-04-01
Aprons at TIA, Contract No. TIACAO/CED/05/071-72 16,809,060.98

2073 Asar
Masanta

Clean and Maintain the Toilets of International


Terminal
Buildings
at
TIA,
Contract
No.
2072-04-01
18,433,091.55
TIACAO/CED/06/071-72

2073 Asar
Masanta

FY:2071/72
5
Project Cost
(NRs)

Work
Start

Completion
Date

S.N.

Project Name & Contract No.

9.

Maintaining of Garden (Flower & Plants) and Ground at


TIA, Contract No. TIACAO/CED/09/071-72

4,077,675.24 2072-04-01 2073 Asar Masanta

10.

Runway Rubber Removal Works at TIA, Contract No.


TIACAO/CED/14/071-72

11,766,238.00 2072-02-03 2072 Asar Masanta

11.

Renovation of ITB Floor Area by Using Marble


Crystallization and Carpeting at TIA, Contract No. 11,123,817.18 2072-02-05
TIACAO/CED/15/071-72
Construction of Bay in South Side of Bay No.1 of
International Apron, Contract No.: TIACAO/CED/16/071-

72

12.

Cancelled

2072-03.25

2072-06-24

2072-04-01

2072 Magh Masanta

2072-04-01

2072 Poush Masanta

16.

Construction of Staff Canteen Shed at Fire Station at TIA,


Contract No. TIACAO/CED/21/071-72

2072-02-32

2072 Asar Masanta

17.

Construction of Remote Aircraft Parking at TIA, Contract No.


TIACAO/CED/22/ 071-72
Annual Maintenance and Preservation of Runway, Taxiway,
Apron
and Associated
Works
at
TIA,
Contract
No.TIACAO/CED/ 23/ 071-72

14.

15.

18.

1,959,233.58

Asoj
Masanta

2072 Ashwin
Masanta

Renovation Work of Toilet at Ground Floor Departure/Arrival


Area of International Terminal Building, Contract No.:
10,624,476.62
TIACAO/CED/18/071-72
Maintenance, Painting and Supplying additional Concertina
Wire in the Property Security Fencing with PCC Bed both 32743293.13
side, Contract No. TIACAO/CED/19/071-72
Renovation of ITB Toilets to cope the Current Expectation of
Passengers at Departure Arrival Area at TIA, Contract NO.
10,833,448.31
TIACAO/CED/20/071-72

13.

Remarks

Ongoing/
Final Stage

Tender Evaluation Process Going on


No Bid submitted, needs retendering

Projects (FY: 2072/73)


6

S.N.
1.
2.
3.
5.
6.

Project Name & Contract No.

Project
Cost
(NRs)

Construction of access road and yard for heavy


2,000,000.00
equipment shed at fire station
Black-top road from old VOR to New VOR
station and maintenance of VOR/DME hut at 2,500,000.00
Koteshwor
Renovation
of
existing
toilets
in
15,000,000.00
operation/airlines building
Deep boring in the north west field of TIA land
5,500,000.00
with hydrant
Upgrading of water supply and sanitary system
in different places of TIA including operation of
5,000,000.00
water treatment plant with filter media, chemical
(all complete)

7.

Up gradation of road from service road to


2,000,000.00
transport station

8.

Marble shining of ITB floor

9.

Maintenance of International Parking Bay


1,76,98,000.00
No.3 and 6.

50,00,000.00

Work
Start

Completion
Date

Remark
s

Airport Development Fund (ADF,


072/73)

S.N.

Project Name & Contract No.

1.

Rehabilitation of Runway and Taxiway

1,000,000,000.00

2.

Construction of Bay in south side of bay


no.:1 of International Apron
Maintenance of rigid pavement at
international aircraft parking areas (Bay
no: 4,3,6 and rigid pavement joints)
Construction of remote parking at north
side of old fire station.
Vertical expansion of ITB for sterilize
departure with aerobridge provision.
Horizontal expansion of International
Terminal Building.
Construction of pre-fabricated toilet blocks
at arrival and departure hall.
International Consultancy services for
Rehabilitation of R/W and T/W

200,000,000.00

3.
4.
5.
6.
7.
8.

Cost
Allocated
(NRs)

100,000,000.00

150,000,000.00
10,000,000.00
10,000,000.00
7,500,000.00
300,000,000.00

Wor
Complet Remar
k
ion Date ks
Start

ADF, 072/73
8

S.N.

Project Name & Contract No.

Cost
Allocated
(NRs)

Consultancy services for design, cost


20,000,000.00
estimate and preparing bid documents for
expansion of international terminal
building.
10. Consultancy services for the construction 17,697,600.00
supervision works of aircraft parking areas
at TIA
9.

Wor
Complet Remar
k
ion Date ks
Start
Horizontal
and
vertical
expansion
works

Technical Strength of CED


9

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Er. Murari Bhandari, Chief


Er. Hari Prasad Adhikari, Dy. Manager
Er. Binesh Munankarmi, Sr. Officer
Er. Prabesh Adhikari, Sr. Officer
Mr. Gagandev Pd. Kusuwaha, Officer
Mr. Rajaram Chaudhari, Officer
Mrs. Ragani Manandhar, Officer
Mr. Nirmal Paudel, Sr. Assistant
Mr. Kumar Shrestha, Sr. Assistant
Mr. Prabhat Ranjan, Sr. Assistant
Mr. Ajay Gupta, Sr. Assistant
Ms. Shraddha Choche Shrestha, Sr. Assistant

Difficulties and challenges


10

Lack of sufficient manpower.


Lack of training.
Lack of quality materials for construction and
maintenance.
Lack of motivation.
Budgetary constraints.
Influence of trade union.
Day time is not available for airside works
Safety and security assurance during construction.
Transportation difficulties of construction materials
Co-ordination between different agencies,
sections, divisions etc.

Snapshots
11

Fire Access Road

ITB, Cleaning

12

R/W Maintenance at Night

Overlaying Access Road


13

Toilet at Baggage Claim


Area

14

Maintenance of Turning Pad from


Standby team

Problem due to sharp turning of Aircraft at Turning


pad

15

Security fencing

FOD Cleaning at Helipad

16

Annex Domestic Terminal Building