Professional Documents
Culture Documents
Estimated
Energy Savings
10% to 15%
15% to 25%
> 25%
> 30%
Topics
Framework & Points Allocation
Case Study : Daikin Singapore Building
Pre-requisite Requirement
All relevant pre-requisite requirements for the specific Green Mark Rating are to be complied with
NonAir-con
Applicable to air-conditioned
building areas > 500 m2
General
Applicable to non
air-conditioned
building areas >
10% of total floor
area excluding
carparks
11
12
14
15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
12
1800
1080
2880
= 2880/400
= 7.2 points
34
35
36
37
38
39
40
41
42
43
44
45
46
Singapore
Standard
SS 530 : 2006
47
Singapore
Standard
SS 530 : 2006
48
49
50
INTRODUCING TO YOU
51
Green Features
52
Improved compressor
efficiency
53
old
new
54
55
Replaced by
Fluorescent tubes
Compact Fluorescent
LED lights
59
3. Ventilation in Carparks
- Open space carpark, naturally ventilated
60
4. Waste Management
-
Recycling bins
Waste management documentation
61
62
Water closet
Basin tap
Shower arm
Goose tap
63
64
8. Green Transport
-
65