Stabilized Earth
blocks
Stabilisation
Soil stabilisation
Physical stabilisation
By sieving the soil
Mechanical stabilisation
By compaction
Chemical stabilisation
By adding a chemical agent
Strength characteristics
Compressive strength of blocks
Compressive strength of wall panels
Bending strength of blocks
(for quality controlling purposes)
Panel strength vs. block strength for different percentages of cement with cured
290 mm x 140 mm x 90 mm blocks (28 day strengths)
Cement
%
Average
compressive
strength of
blocks
(N/mm2)
Average
compressive
strength of panels
(N/mm2)
Characteristic
compressive
strength of panels
(N/mm2)
Compres
sive
stress at
1st crack
N/mm2
Average
Bending
strength
of blocks
N/mm2
20
2
4
6
8
1.36
2.49
3.15
4.30
1.27
0.964
1.11
1.545
1.053
0.803
0.916
1.287
1.07
0.476
0.648
1.15
0.116
0.184
0.208
0.327
25
2
4
6
8
1.84
2.62
2.94
4.00
0.94
1.225
1.183
1.694
0.783
1.021
0.986
1.41
0.879
1.070
0.950
1.260
0.109
0.160
0.184
0.273
30
2
4
6
8
1.66
3.32
3.90
3.97
0.91
1.18
1.34
1.44
0.753
0.983
1.120
1.200
0.630
0.392
0.957
1.260
0.072
0.191
0.289
0.257
40
2
4
6
8
1.13
1.93
2.70
2.89
0.53
0.67
1.045
1.075
0.44
0.558
0.871
0.896
0.380
0.476
0.560
0.714
0.084
0.163
0.249
0.342
45
2
4
6
8
1.04
1.79
2.17
3.33
0.46
0.925
0.85
1.04
0.383
0.771
0.703
0.866
0.357
0.556
0.913
0.833
0.085
0.187
0.259
0.244
Fines
%
Characteristic compressive strength of panels for different cement percentages and fines contents
Cement
percentage by
volume (%)
Characteristic compressive
strength of panels (N/mm2) for
fines content
< 30%
Characteristic compressive
strength of panels (N/mm2)for
fines content from 40% to
45%
0.86
0.41
0.94
0.66
1.00
0.79
1.30
0.88
Assessment of design
strengths
Design strength required for a
single storey house 0.25 -0.4 N/mm2
two storey house - 0.8 0.9 N/mm2
at plinth level
Quality controlling
Penetrometer test on green blocks
Hardened blocks 28 day strength
fk = 0.15c + 0.55 - fines content between
20%
- 30%
fk = 0.20c + 0.2
- fines content
between
30%
fk = 2.0 b + 0.6
20%
fk = 2.0 b + 0.25
- fines content
30%
- 45%
- 30%
- 45%
between
Blocks in use
Cement
Soil at
site
Soil
bought
Cost of
labour
and
mortar
Soil at
site
Soil
bought
2%
123.32
150.98
119.77
243.09
270.75
4%
156.65
189.31
119.77
276.42
304.08
6%
189.98
217.64
119.77
309.75
337.41
8%
223.31
250.97
119.77
343.08
370.74
Cement
Soil at site
Soil bought
2%
316.00
351.98
4%
359.35
395.30
6%
402.68
438.63
8%
446.00
481.96
Cement
Soil at site
Soil
bought
Cost of
labour and
mortar
Soil at site
Soil
bought
2%
178.00
228.00
148.62
326.62
376.62
4%
238.00
288.00
148.62
386.62
436.62
6%
298.00
348.00
148.62
446.62
496.62
8%
358.00
408.00
148.62
506.62
556.62
Cement
Soil at site
Soil bought
2%
424.60
489.60
4%
502.60
567.60
6%
580.60
645.60
8%
658.60
723.60
Cost of conventional
materials
9 brick work ===Rs.800/m2
4.5 brick work ==Rs.490/m2
8 cement blocks=Rs.700/m2
6cement blocks==Rs.585/m2
4cement blocks==Rs.417/m2