Process Safety KPIs

Determination based on the


Bow Tie methodology
Arthur Groot
04 februari 2014

From HAZARD to HARM

04 februari 2014

Methodology and key-elements


Identification and monitoring KPIs

C-level

BU-level

Plant en site management

04 februari 2014

Bottom-up approach
Direct connection between
safety management
system and risks
Compliance with
legislation (Seveso II),
HSG 254 methodology
and CCPS
Identification of relevant
KPI-s process safety by
using BowTiemethodology
Dedicated Bow-Tie
software
Mandate and commitment
Training programs
ISO 31000
Approach in 4 phases

Approach in 4 phases to
determine the KPIs for process safety
1.
2.
3.
4.

Identification and scoping (setting up


BowTies)
Analysis of barriers and selection of KPIs
(leading and lagging)
Set-up criteria and reporting of KPIs
Evaluation and review

04 februari 2014

Phase 1: identification

Setting-up BowTies in 12 steps at operational installation


level by using the following reports:
HAZOP/HAZIDs
Safety reports (Seveso II)
SIL/LOPA assesments
FMECA analysis

Result: a set of barriers including escalation factor control

04 februari 2014

Phase 2, Key Performance Indicators


Starting point:
You dont improve what you dont measure
Indicators:

Leading indicators: performance of barriers before the


consequence
Lagging indicators: number of near misses or the
consequences itself

04 februari 2014

Phase 2, analysis of barriers and


selection of KPIs

Selection of KPIs, leading (barriers), max. 1 per threat


or consequence line and lagging (consequences)
Connecting barriers (KPIs) to business model (safety management
system)

04 februari 2014

Phase 3, Set-up criteria and reporting of KPIs

Setting up PR (performance requirements) for the KPIs,. the


FISM (Functionality, Integrity, Survivability and Management)
methodology
Setting-up PS (performance standards) for (KPIs) defining
grades, scoring and assessment criteria

04 februari 2014

Performance requirements

Functionality
definition the expected task(s)
Integrity
definition of the reliability of the barrier
Survivability
describes the barrier during an incident
Management
description of the processes, activities, procedures, competences
to control the barrier

04 februari 2014

Performance standard

Grades, scoring methods & assessment criteria

Effectiveness of barrier
Condition of barrier is very bad
Condition of barrier is bad

Performance criteria
Design
i.e procedure not
updated last 4 years
i.e. procedure not
updated last 2 years

Condition of barrier is moderate

i.e.producedure

Condition of barrier is good

Etc.

Condition of barrier is very good

Etc.

Very Good

04 februari 2014

Good

Moderate

Integrity
Not audited on
performance
Not audited in
the last year
Not audited this
year

Operational

Etc.

Etc.

Etc.

Etc.

Not trained operators


Operator trained not in
last 2 years
Operators trained last
year

Bad

Very Bad

Phase 3, integration of
Key Performance Indicators
Generic KPIs related to management systems
Percentage of completed HSE audits
Implementation of lesson learned TRIPOD investigations
(progress)
Validation of procedures for operational and maintenance tasks
(progress is parameter)
Percentage of underperforming operational documents noticed
during (HSE) audits
Job-specific trained personal (percentage)
Etc.

04 februari 2014

Phase 3, integration Performance


Indicators process safety
Related to technical integrity
Percentage of completed tests according to schedule (software,
safety relief valves, pressurized tanks, fire fighting equipment,
etc.)
Combination of completed test and percentage of tested
equipment that pass/fail the test
Status of follow-up actions from risk analyses such as HAZOPs;
Number of risk analyses executed according to schedule
(HAZOP, SIL, LOPA, etc.)
Number of (un)controled releases/emissions/spills
Etc.

04 februari 2014

Phase 4, Start reporting, evaluation


and review

Starting with risk optimization


Starting improvement cycle (Plan, Do, Check, Act cycle)
Transparency check
Integrating incident data for risk management

04 februari 2014

Phase 4, live data of the (HSE) management


system into the Bow-Tie

Management System
04 februari 2014

Phase 4: reporting levels process


safety
Summary of CCPS
standard (based on
information form
BowTie level)
Summary level from
BowTie level, e.g.
CCPS examples
(based on
information form
BowTie level)
BowTie Level

C-level

BU-level

Plant en site management

04 februari 2014

Conclusions KPIs

Bottom-up approach
Identification of relevant KPI-s (process) safety by using
BowTie- methodology
Compliance with (HSE) legislation. i.e. (Seveso II), HSG
254 methodology (HSE) and meets criteria set by CCPS

04 februari 2014

Services Royal HaskoningDHV


Policy and strategy

Culture

Development of Environment &


Safety Policy
Corporate Environment Plan
Stakeholder Analysis
Carbon Capture and Storage
REACH and GHS
Corporate Social Responsibility
Carbon Trading
Policy on the Prevention of Serious
Accidents
Energy

SHWE growth model (based Safety Case


on Hearts and Minds)
HAZID and HAZOP
Safety culture scan
ENVID
Incident analysis (TRIPOD) Fire Protection Analyses
Management system audits QRA, IRPA
Technical Safety Review
Compliance Audits
Process Hazard Analysis
Hazard Consequence
Modeling
Compliance
Asset integrity studies
Environmental impact
(SIL, IPF
assessment (EIA)
and LOPA)
Environmental permitting Reliability, Availability &
Maintainability Studies
Safety Report
(RAMS)
Fire Report
FME(C)A studies
QRA/external Safety
BowTie Risk Analyses
EIA
Escape, Evacuation &
Emission studies
Rescue Analysis (EERA)
Noise/odor dispersion studies
IPPC studies

Organization and processes


Environmental Management
Systems
Safety Management Systems
Occupational Health Management
Systems
HSE Risk Management
Interim HSE Management
Training and Coaching
Environmental and Sustainability
Reporting
04 februari 2014
Process safety management

HSE engineering