OBJECTIVE
The purpose of steam line blowing is to remove pipe slag, weld bead deposits and other foreign
material from the main and reheat steam systems prior to turbine operation. The cleaning is
accomplished by subjecting the piping systems to heating, blowing steam and cooling cycles in
sufficient number and duration until clean steam is obtained.
vb
PRE STEP # 1
PRE STEP # 2
: Separator - main steam line- HPBP CRH Line CRH Isolator - martyr valve
- tailpipe to atmosphere.
MAIN STEP # 1
: Separator-SH-main steam line-MSV-temporary pipe with martyr-valve-NRV-CRH-RHHRH-IPT Stop Valve-temporary pipe-target-tailpipe to atmosphere
MAIN STEP # 2
: Separator-SH-main steam line-MSV-temporary pipe with martyr-valveNRV-CRHRH-HRH-LP Bypass valve-temporary pipe-tailpipe to atmosphere
PRE STEP
PROCEDURE
COMPLETION CRITERIA
Clean White Smoke to be observed at the Exhaust of Tail Pipe
NOTE :
CFR < 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP
First Blow at every Step to be given at much reduced pressure to check the temporary piping
healthiness
MAIN STEP
PROCEDURE
NOTE :
CFR > 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP
First Blow at every Step to be given at much reduced pressure to check the temporary piping
healthiness
COMPLETION CRITERIAN
A Target Plate is used to access the impacts of particle during steam Blowing. Steam Blowing
will be declared when
ESV
MSV
Martyr V/v
ESV
MSV
HP Bypass
Final SH
MS Line
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Martyr V/v
LPBP V/ v
ESV
MSV
Martyr V/v
MS Line
ESV
MSV
HP Bypass
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Final SH
Martyr V/v
ESV
MSV
Martyr V/v
MS Line
ESV
MSV
HP Bypass
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Final SH
Martyr V/v
ESV
MSV
Martyr V/v
MS Line
ESV
MSV
HP Bypass
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Final SH
Martyr V/v
From Separator
To Separator
From Separator
STORAGE TANK
SH D.S.H. No1
Click
Here
Sample Cooler
FLASH TANK
MIXING PIECE
WR
BRP
ZR
Modification # 2
1
To D/A Floor
FLASH TANK
ZR
WR
Condensor
From Service Water
Condensor
Dummy
Temporary Connection
To Station Drain