20.01.2015
2019-20
PROPOSE
D
CAGR (%)
507
1000
14.55 %
CCL
55
140
20.54 %
CCL
55
COAL
INDIA
140+18.9 24 % (Actual
CAGR)
= 158.9
104.0
80.0
47.1
47.5
48.0
48.1
50.0
55.0
60.5
67.0
GREENFIELD PROJECTS
A. Already commissioned:
i. AMRAPALI OC ( 12 MTY)-Feb14
ii. MAGADH OC (20 MTY)-Oct14
iii. KONAR OC (3.50 MTY) Jan14
iv. SAWANG C UG (0.15 MTY)-Dec14
v. PURNADIH OC (QUARRY 1 )-Aug2013
vi. NORTH URIMARI OC (QUARRY 2 )-
Oct13
4
GREENFIELD PROJECTS
B. To be commissioned:
i.
(MT)
Production & Dispatch
Million Tonnes
Name
Start of
Producti
on
15.00
20.00
15.00
20.00
2017-18
2017-18
Chatti- Bariatu,
Kerandari OC
15.0
13.00
2018-19
Pichri OC
1.20
2.00
1.20
1.50
2016-17
2016-17
Piparwar Mangardaha
UG
1.38
0.205
2017-18
Total
54.58
50.905
Pachra OC
Sanghamitra OC
Kalyani OC
Producti
Capacit
on in
y
FY2020
GROUP
2013-14
( Actual)
Projection
Plan for
2014-15
2015-16
2016-17
2017-18
0.47
2018-19
2019-20
0.47
0.47
Existing
Mines
5.24
3.865
2.46
0.47
Complet
ed
Projects
14.49
14.036
14.66
15.47 16.315
17.10
18.47
Ongoing
Projects
30.30
37.099
43.39
50.82 56.633
66.41
70.16
0.25
6.582
20.025 50.905
67.0
6.5
80.0
13.0
104.0
24.0
Future
Projects
8
Total
50.02
55.0
60.50
5.5
140.0
36.0
Name
Amrapali OC
Magadh OC
Pachra OC
Sanghamitra OC
Chatti- Bariatu,
Kerandari OC
Total
9
Product
Capaci
ion in
ty
FY2020
12.0
12.0
20.0
20.00
15.00
15.00
20.00
20.00
15.0
13.00
82.00
80.00
Start of
Product
ion
2014-15
2015-16
2017-18
2017-18
2018-19
TORI SHIVPUR
-KATHOTIA RAILWAY
LINE
H AZARIBAGH RS
WASHE RY SITE
SISAI BLOCK
N T PC
BRINDA BL OCK
BES RS
K E R E N D A R I- C
PACHRA BL OCK
U M PP
K E R E N D A RI- B
DUMRI BLOCK
PAC HRA
Shivpur
IN TEG RATED
CIL
KOYAD BLO CK
MANAT U BL OCK
K E R E N DA R I - A
N T PC
AMRAPAL I PROJECT
CIL
CIL
U M PP
N T PC
PACHARA SOUTH
SARADHU BLOCK
MOITRA BLOCK
KOYE D KISHANPUR
PROPOSE D DIVERSIONROAD
SOUTH
GONDALPAR A BL OCK
BADAM BL OCK
MAGADH
BLOCK
C OLONY
S ITE -B
BADMAHI
CI L
T ANDWA SOUT H BL OCK
BABUPARA BL OCK
T ANDWA
B LOCK
KAR IMATI
BLOCK
DUMARGARH
BLOCK
GANESHPUR BLOCK
C TSP-12
RL.439.84
MAN DU RS
GARUA RIVER
RAUTPAR A A
RAUTPAR A BLOCK
RAUTPAR A B
PROPOSE D DIVERSIONROAD
RONHE B LOCK
KD-3
R L. 491.80
CIL
CHANO R IKBA
'A' B LOCK
CI L
C HITARPUR BLOCK
CHAKL A BL OCK
K.P.B.-3
R L. 475.35
DE ONAD-I
ASHOK EXP.
ASHOK OCP
PIPARWAR BLOCK
MANGARDAHA BL OCK
T O KUJU
BUNDU B LOCK
N ayamore
K UJU RS
BACHARA C OL LIERY
ASHOKE KE RKAT A WEST
PURNADIHOCP
DE ONAD-II
K. D-11
RL. 424.26
K.H-1
RAY C OL LIERY
R L.441.39
CHURI COL LIERY
R OHINI BL OCK
KARKATA BLOCK
KD.HE SALONG
BLOCK
SCALE - 1:50000
P LATE No. - 7
N. K. COALFIELDS
CMPDI , R.I.-III
RAMG ARAH
(Golc ha kra)
Tori
Particulars
Total (km)
Status
Tori- Shivpur
44.37
Shivpur - Kathautia
49.08
Stage-I forestry
clearance application is
yet to be filed to MoEF
Total
93.45
Total Cost
Rs.3571.69 Crs.
TORI-SHIVPUR SECTION
Type of Requisitioned
Land
Forest
Acquired YET TO BE
/ Handed Acquired/
Over
handed over
256.945
Nil
256.945
Remarks
Govt.
of
Jharkhand
accorded approval for
diversion on 26.02.2014.
Tree cutting is in
progress.
GungleJ
hari
107.435
Nil
107.435
To be transferred
Govt /
GM
236.346
Nil
236.346
To be transferred
Raiyati
Total
452.733
1053.459
206.30
463.245
246.433
590.214
To be obtained
55% (approx.) area yet
to be given
SHIVPUR-KATHOTIA SECTION
Type of Requisitioned
Land
Forest
670.518
Nil
670.518
After getting
GMJJ land,
forestry
application
initiated.
Gungle- 187.510
Jhari
Nil
187.510
To be transferred
Govt/
GM
Nil
72.150
To be transferred
Nil
367.280
To be acquired
72.150
Raiyyati 367.280
TOTAL 1297.459
NOC for
Stage I
clearance
will be
Sl.
No.
Work/
Activity
Tori Shivpur
Kathotia BG Rail
line By EC
Railway, Patna /
Hajipur.
Value
(Rs. In
Crores)
Present Status
Project Cost
revised from
Rs.3214.89
Crores to Rs
3571.69
Crores Railway
Present Status
Payment to Railways:
Till now CCL has deposited Rs.958.1912 Crores with Railways (Rs.148.1412 Crores received
from CCDAC & Rs.810.05 Crores by CCL). CCDAC has been requested for reimbursement of
the amount deposited by CCL with railways.
Also as desired by Railway, Consent letter has been sent to EC Railway for survey of future 2 nd
& 3rd line near existing Tori /Mahuamilan Station.
SCHEDULE DATE OF COMPLETION :
A meeting was held on 15.09.2014 at Ranchi between the Chief Secretary, Govt. of Jharkhand and Chairman
Railway Board, New Delhi in which serious concern was expressed on the delay in the commissioning of this
rail line. To expedite the land acquisition issues, a task force consisting of DC,DFO and SP was constituted,
which would meet every fortnight along with officials of Railways. GM, Van Nigam, Govt. of Jharkhand was
assigned the task of cutting remaining trees along the rail alignment in Tori-Shivpur section within 3(Three)
months time. As intimated by Railways, 3 (Three) task force meetings have been conducted by DC/Chatra.
Present Status
Details of Land Payment & Tree felling Status
As requested by railways, CCL management had previously conveyed
the acceptance to EC Railway, Patna on 28.09.2013 for payment of 2.4
times the normal land compensation for emergency acquisition of
balance Raiyati land by Railways under Jharkhand Swaichik BhooArjan
Niyamawali 2010 as per the provisions of Govt. of Jharkhand.
Present Status
CIVIL ENGINEERING WORKS :
As per the record notes of the 3rd Inter Ministerial Committee (IMC)
meeting held on 16.09.2013, all tenders for Civil Engineering Works
upto 44 Km length in Tori-Shivpur section was to be finalised by
October 2013.
Till date the Railways have made an expenditure of Rs.188 Cores only
(i.e. 20% approx of total deposited amount of Rs.958.1912 Crores) by
CCL.
MAJOR CONSTRAINTS
Evacuation
Land
Authentication
(Annexure -1)
FC (Annexure -2)
19
32.9
33.9
18.9
16.41
16.37
16.33
11.5
11.9
11.4
9.4
4.9
20
Stock dropped to below 10 MT level for the first time in 8 years in 2013-14.
SL NO
1
2
3
4
5
6
H EAD
LAND
REHABILITATION
RESIDENTIAL &
WELFARE
SERVICE BUILDING
8
9
RAILWAY SIDING
10
11
201520
BE
39.79
3.95
RE
39.79
3.95
BE
PROJ
PROJ PROJ PROJ
40.00 100.00 190.00 210.00 210.00 750.00
10.00 35.00 35.00 20.00 20.00 120.00
2.74
2.74
10.00
35.00
15.00
35.00
15.00
40.00
15.00
23.01
23.01
30.00
20.00
20.00
20.00
1.55
1.55
1.5
44.7
56
12.46
56
12.46
40.00 160.00
5.04
5.04
10.00
15.00 70.00
1380.0
ROADS
1165.0
HEMM
417.08 417.08 325.00 410.00 135.00 110.00 185.00
0
CHP
EXPLORATION /
PLAN.
OTHERS
TOTAL
20.00
110.00
EQUIPMENT PROCUREMENT
PLAN
Shovel
YEAR
10 M3
Dumper
4-6 M3 < 4 M3
100T
60T
Dozers
410HP
320HP
Drill
160mm
2014-15
12
13
19
63
25
2015-16
25
67
11
12
2016-17
14
62
15
21
15
2017-18
12
10
2018-19
15
2019-20
49
26
HEMM POPULATION
(1.1.2015)
SHOVEL
DUMPER
DOZER
DRILL
WATER TANKER
GRADER
LOADER
CRANE
TYRE HANDLER
CABLE REELER
24
106
493
183
108
62
53
37
78
6
1
Capacity Make
BEML
60 T
CAT
BEML
85 T
CAT
BEML
100 T
CAT
25
2014-15 Performance
Nos.
%
On S/off % Avl
Utl.
Roll Wkg
105
0
73
38
56
0
88
49
44
0
36
13
11
10
74
31
34
0
62
26
18
0
89
45
Future technology
26
Continuous Miners in 3
mines Churi-Benti,
1.
Parej East and
Piparwar- Mangardaha
Production
level FY 14
0.510
Future
Production
level (Rated
capacity of
mines)
2.70
27
3.
Complete
Techniques
Transparency
through
ICT
a.WAN
b.GPS, RFID, CCTV, automatic weighment
& boom barrier based monitoring system
c. E tendering, e refund
d.Single Window Grievance Redressal Cell
Samadhan Kendra
e. Mass Promotion
28
SOLUTION
Identification of customers to lift coal
Railway
Line
Productivity enhancement
29
Thank You
30
Measures Suggested
1.Improvement in efficiency and productivity of men and machines:
Annexure 1
&2
2.Identification of outsourcing patches of existing mines which were hitherto
considered unviable due to high stripping ratio.
3. Depending on land availability , outsourcing beyond the departmental capacity in
existing mines
4. Opencasting underground mines wherever feasible
5.Rationalisation of men and machines
6. Standardisation of machines 60 T dumpers with 5 m3 shovel and 100 T
dumpers with 10 m3 shovels
7.Waiving environmental clearance for small patches with production of less than
0.50 MTY.
8. Introduction of piece rated concept for drill, dumper and shovel operators
9. Dedicated Cell for land acquisition and E&F clearance
Fresh recruitment of sufficient officials
Horizontal transfer of willing executives in various grades
10. Right person for right job
31
Annexure 1
2
4
5
7
8
9
10
11
12
13
14
15
16
17
18
19
20
32
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Sandardisation of Shovel -Dumper Combination ( 1. 60T Dumper with 6.5 Cu.M Shovel, 2. 100T Dumper with 10 Cu. M Shovel)
preferable make of Dumpers Catterpillar/ Komatsu and for Shovel - P&H.
HEMM
The concept of MARC for Higher capacity equipment should be enhanced from 70% to 90 % of economic life of the equipment
Procurement with operators and payment should be made for each hour of utilisation.
Equipment procurement for Two years requirement at a time.
Joint venture with Tyre manufacturer for smooth flow of tyres
Depot At Door for Bigger Area /Project for immediate Spares availability.
Web Integration of All Stores of Subsidiary
To ensure quality spares availability Right in time.
CIL's Model Depot agreement may be implemented Judiciously ( To implement Model Depot Agreement in TOTO as per the lead
Spares
company.)
Availability
Procurement of spares for at least for two years for Imported Items.
To ensure availability of Consumables just in time.
To ensure issuance of spares from Stores 24X7.
Provisioning of Handling equipment at Stores ( Fork lifter, Pick & carry Crane etc)
To implement maintenance practices as per OEM recommendations Judiciously .
To implement Condition Based Maintenance practices.
To Implement Three Tier maintenance Practices ( At Field, Base Work Shops & RRS / CRS) along with proper generation of float
assemblies.
HEMM
Maintenance Staggered Maintenance
Practices
Medium term Rate Contract for Overhaul / Repair of Major Sub assemblies by OEMs after expiry of warranty period for remaining rated
life. ( Bucket, Crowd Mechn, Under carriage, Electricals, E engine, transmissions, Blade etc.)
Provisioning of Computer with Data Entry Operator for proper recording & Forecasting of Schedule maintenance.
Provisioning of Adequate Skilled manpower.
Human capital Generation through Specialised Training. Steps have already been initiated. Fresh engineers are being sent to
equipment manufacturers like HEC, BEML, L&T, REL, Atlas Copco etc for the purpose.
Man Power Provisioning of Skilled Technical manpower ( Auto Electrician, HT electrician, EP Fitter, Welder Etc)
Proper training of manpower for Skill Development.
Job Rotation for multi Skill Development.
Provisioning of Proper maintenance Infrastructure ( Maintenance Van, Diesel Bowser, Tyre handler etc.).
Provisioning of Maintenance tools & Special Tools ( Flow meter, Pressure gauge, Torque multiplier etc)
EOT Crane & Fork lifter & articulated Pick & carry crane.
Provisioning of DG set at Workshops.
Maintenance
Centralise Lubrication for all grades of Lubricant in the Base Work Shop. T
Infrastructure
Tyre Mounting & De mounting device
Provisioning of Adequate washing facilities ( Multi Jet washing Pump with ETP ))
Provisioning of Diesel Dispensing Unit at All Workshop with water Separation plant.
Provisioning of Flushing cart at all workshop for maintaining cleanliness of all lubricating oil.
Standarisation of fleets of equipment project wise/ Area wise
Motivational tool for enhancement of Availability of HEMM.
Miscellaneous
Enforce discipline & non interference of external agencies.
Steps to be taken to minimise Operational Abuse of Equipment ( Proper blasting, Bench height , Haul road etc).
Annexure 2
POINTS TO IMPROVE EFFICIENCY & PRODUCTIVITY.
1 Motivational tool for enhancement of utilisation hours
(a) Operators comfort,
(b) AC Canteen facility associated with AC mobile canteen,
(c) introduction of piece rated concept of operators.
2 Mine Geometry
(a) To work according to Mine operation rolling plan for at least three year.
(b) To maintain proper faces, benches, haul raods, dump yards along with
proper illumination & dust supression.
3 Proper fragmentation
4 Contingency fleet for unintrupted availability of HEMM for production.
5 To Implement Four Shift working or Two shift with extension of Back Shift.
6 Staggered maintenance & Hot Seat exchange of operators
7 To maintain separate road for Dozer & Light vehicle movement
8 To ensure Rest shelter with Drinking water facility at face as well as at workshop
9 Proper communication system.
10 Provisioning of light vehicles in Back Shift.
11 To ensure throughput of trained operators.
12 Provision of Supervisors ( Electrical Supervisor / Foreman)
13 Enforce discipline & non interference of external agencies.
33
Complete
Techniques
Transparency
through
ICT
a.WAN
b.GPS, RFID, CCTV, automatic weighment
& boom barrier based monitoring system
c. E tendering, e refund
d.Single Window Grievance Rederessal Cell
Samadhan Kendra
e. Mass Promotion
35
36
37
CONCLUSION
1.Implementaion of Kaya Kalp
Model :
Silver bullet for Coal Industry
38
39
1. Forestry Clearance
Sl
No
40
Mine
Forest
Land
Involved
(Ha)
Production
2019-20
FC Required
Urimari OC
63.64
2.0
2014-15,Feb15
Rohini OC
74.81
2.0
2014-15, Dec14
Amlo OC
39.66
2.50
2015-16,Dec15
Dhori East OC
25.4
0.60
2015-16,Dec15
KD Hesalong
OC
126.72
4.30
2015-16,Dec15
Kedla OC
50.50
0.70
2015-16,Dec15
Govindpur Ph
II OC
10.52
2.00
201516,Sept.15
Karo OC
226.67
3.50
201516,Sept.15
Purnadih OC
170.90
3.00
2015-16,Dec15
10
Rajrappa OC
277.15
2.00
2015-16,Dec15
1. Forestry Clearance
Sl
No
41
Mine
Forest
Land
Involved
(Ha)
Production
2019-20
FC Required
97.44
1.0
201516,Sept.15
12.00
2016-17,June16
20.00
2016-17,June16
20.000
2016-17,June16
12
Tarmi OC
13
Amrapali OC
14
Ashoka Expn.
OC
15
Magadh OC
16
Topa OC RO
71.58
1.20
2016-17,June16
17
Churi-Benti
UG
79.0
0.54
2016-17,June16
18
Tapin South
Expn. OC
2.00
2016-17, Mar17
19
Pachra OC
409.28
15.00
2016-17,June16
20
Sanghamitra
572.72
12.50
2016-17,June16
403.84
2. Environmental Clearance
Sl
No
1
2
3
4
42
Mine
Govindpur
Ph II OC
Selected
Dhori (Q3)
OC
Topa UG
KD
Hesalong
OC
Kedla OC
Productio
n 2019-20
EC
Required
2.00
201415,Feb15
2014-15,
Feb15
0.025
4.30
0.70
2015-16,
June15
2015-16,
Sept15
2015-16,
Sept15
2. Environmental Clearance
Sl
No
Mine
Productio
n 2019-20
EC
Required
Tapin South
Expn. OC
Parej East
UG
Pachra OC
2.00
2015-16,
Dec16
2015-16,
Sept15
2015-16,
Dec15
2015-16,
Dec15
2015-16,
Dec15
2015-16,
Dec15
9
10
11
43
0.20
15.00
12.50
12
Sanghamitr
a OC
Pichri OC
13
Kalyani OC
2.00
1.20
Possession
44
Sl
No
Mine
Land
Involved
(Ha)
Production
2019-20
Required
KD Hesalong
OC
27
4.30
2014-15,
April15
Khasmahal
OC
15.05
1.50
2014-15,
April15
Amrapali OC
239.47
12.00
2014-15,
Dec14
Ashoka Expn.
OC
70.44
20.00
2014-15,
Dec14
Karo OC
22.95
3.50
2014-15,
Dec14
Magadh OC
568
20.00
2014-15,
Dec14
North
Urimari OC
78.38
3.00
2014-15,
Dec14
Piparwar OC
27.58
9.15 MT ,
2015-16
2014-15,
Dec14
Possession
Sl
No
Production
2019-20
Required
13
Pachra OC
20.0
2015-16
14
Sanghamitra
OC
12.0
2015-16
ChattiBariatu,
Kerandarai
OC
6.50
2015-16
Pichri OC
1.20
2015-16
16
45
Mine
56.0
54.0
52.9
52.0
53.0
50.0
50.0
48.0 47.1
46.0
44.0
52.1
(Figs in MT)
47.5
46.4
48.0
48.0
48.1
Production
Dispatch
43.9
42.0
40.0
(LIKELY)
After years of almost no growth in coal production, CCL registered a growth of 4.1 % in
2013-14.
32.9
33.9
18.9
16.41
16.37
16.33
11.5
11.9
11.4
9.4
4.9
47
Stock dropped to below 10 MT level for the first time in 8 years in 2013-14.
700
657.18
640
585
540
440
340
240
500
425
397.42
420
321.31
350
350
297.07
200.76
140
40
TARGET
ACTUAL
Project
Production in
2019-20 (MT)
Constraints
1.
Ashoka Expn.
OC
20.00
Land Authentication,
Physical Possession, FC
2.
Amrapali OC
12.00
Land authentication,
Evacuation, FC
3.
Magadh OC
20.00
Land authentication,
Evacuation, FC
4.
Pachra OC
15.00
-DO-, EC
5.
Sanghamitra
OC
12.50
-DO-, EC
6.
ChattiBariatu ,
Kerandari OC
6.50
TOTAL
86.00
Production 201314
Piparwar OC
12.31
Selected
Dhori (Q 3)
4.73
Kalyani OC
1.88
TOTAL
18.92
1.
Project
Production in
2019-20 (MT)
2.00
2.
Govindpur Ph II
OC
Karma OC
3.
Karo OC
3.50
4.
Konar OC
3.50
5.
Kathara OC
1.90
6.
North Urimari
OC
3.00
1.00
Project
Production in
2019-20 (MT)
7. Purnadih OC
3.00
8. Rajrappa OC
2.00
9. Rohini OC
2.00
10. Tetarikhar OC
2.00
11. Tapin OC
2.80
TOTAL
26.70