GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
GNPOC Pipeline:
Corrosion Defects
& Remedy.
By: Pipeline Operations & Maintenance Department
December 2007.
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
Introduction:
In year 2001, intelligent pigging (IP) detected 2points metal loss depth
(ML) more than 40% and 130points with ML less than 40%.
5 points were repaired using Clock Spring Method that will be
discussed later.
In this year 2007, IP result showed serious corrosion defects in terms of
metal loss (ML) and severe welding anomaly (SWA) and general pitting
in total 20,233 points.
Details results of findings by CPP (China Petroleum Pipeline Bureau)
as shown in the next slides.
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
Other areas of the pipe surfaces that have been corrosive attack.
10
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
11
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
12
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
13
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
14
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
The affected ML defect areas were thoroughly cleaned and fill with cold
weld compound materials as per manufacturer application methods and
left for curing and hardened.
Cold weld compound materials: DURAMETAL SUPER CA-HD RAPID
15
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
Fit up of the Type B fabricated welding sleeve upon curing of the cold
weld compound.
16
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
17
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
Before welding of any welding sleeve on live pipeline can commence, the
operating pressure of the pipeline need to be reduced as per calculated
safe pressure level for welding onto in-service pipelines such as by using
the following formula:
P = 2S (t - c) 0.72 / D as per Pipeline Repair Manual by Pipeline Research
Council International Inc. (PRCI).
Where:
P = pressure (psi)
S = specific minimum yield strength of pipe (psi)
t = nominal pipe wall thickness (inch)
D = nominal pipe diameter (inch)
c = allowance for heated metal loss of strength, assume to be 2.4 based on
TD Williamson calculations.
18
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
Removed all coating material of the line pipe on the areas where
welding to be performed.
GNPOC Welding Procedure Specifications (WPS) No: 02 and 03 or
04 to be used for the welding of this fabricated sleeve type B.
Welding parameters, preheat temp, inter-pass temp and pipe wall
temperature to be monitor accordingly to the mentioned WPS
used.
Upon curing and hardened of the cold weld compound materials
(DURAMETAL-SUPER CA-HD RAPID), fit-up of the fabricated
welding sleeve type B to be done properly with accepted alignment
root gap to be achieved. Advisable to hold and tight up the two
portion of the this sleeve by the use of two numbers of chain
clamps, fiber strap clamps or any clamping devices.
19
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
20
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
21
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
22
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
23
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
24
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
25
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
Upon curing time of the epoxy coating, the fabricated welding sleeve and
its nearby surrounding areas of the pipe were wrapped with the heat
shrinkable sleeve.
Type: RAYCHEM, HTLP 80, High Temperature (80degC)
26
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
27
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
28
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
29
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
Existing Heat Shrinkable Sleeve found wet after removed from the pipe
surface at KP ( 0 + 917m)
30
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
31
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
32
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
33
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
34
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
35
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
36
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
37
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
38
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
39
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
40
n
Great Nile Petroleum Operating Company Limited
5th December ,
n
Great Nile Petroleum Operating Company Limited
CLOCK
Proven better, time after
time
SPRING
41
5th December ,
n
Great Nile Petroleum Operating Company Limited
1.1.
2.2.
3.3.
CLOCK
Proven better,
SPRING
time after
time
time
Patented,
Patented,high-strength,
high-strength,
unidirectional
unidirectionalcomposite
composite
structure
structure
Patented,
Patented,fast
fastcuring,
curing,high
high
performance
two-part
performance two-part
adhesive
adhesivesystem
system
Extremely
Extremelyhigh
high
compressive
compressivestrength,
strength,
proprietary
proprietaryload
load
transferring
transferringcomponent.
component.
Once
Onceinstalled,
installed,the
thethree
three
elements
bond
together
elements bond togetherto
to
form
extraordinarily
form extraordinarily
strong
strongand
anddurable
durablerepair
repair
42
5th December ,
n
Great Nile Petroleum Operating Company Limited
43
5th December ,
MECHANICAL PROPERTIES
Operating Temperature
Tensile Modulus
Tensile Strength
Flexural Modulus
Flexural Strength
Ply Thickness
Compressive Strength
Dielectric Strength
Working Time
Hardness
width
425 pounds
Allowed for D.O.T. pipeline repairs under
49 CFR, Parts 192 and 195, as well as
being validated and certified for use under
the ASME PCC-2 Article for B31.3, B31.4
and B31.8.
Code Compliance
2 X 12
Available
Sizes
Shelf Life
NO EFFECT
Chemical Resistance
(40 Day Immersion Test
715 pounds
Period)
Cure Time
Ammonia
Hydrochloric Acid
Diesel
MEK
Acetone
Crude Oil
Toluene
Ethyl Alcohol
Gasoline
Xylenes
Black liquor
Sulfuric Acid
1 hour at temperatures between 50--80F
10
3 X
30
4 X
15
4 X
30
4 X
50
6 X
60
10 X 60
10 X 120
44
3 X
5th December ,
GNPOC Pipeline:
Corrosion Defects & Remedy.
n
Great Nile Petroleum Operating Company Limited
THE END
Thank you for your kind
attention.
Shukran Jazilan.
Wassalam.
Asset Integrity Workshop
45
5th December ,