MATRIC NO.
29375
32270
MUHAMMAD FARABI
31376
33119
Geotechnical
Critical
pile
group
Critical load
1308 kN
Foundation
Size Column
(mm)
Pile Cap
Size (mm)
Reinforcemen
t
Concrete
Grade Pile
Cap
F1/C1
200 x 200
(2 pile)
1040 x 440 x
500
4T16
5T20
G40
F1/C2
250 x 250
(2 pile)
1040 x 440 x
500
4T16
5T20
G40
F2/C3
300 x 300
(4 pile)
1040 x 1040 x
500
10T20
G40
F2/C4
300 x 400
(4 pile)
1040 x 1040 x
500
10T20
G40
Settlement
2 pile group = 3.57 mm
4 pile group = 5.49 mm
Maximum settlement allowable < 25mm
2 pile group
keyplan
4 pile group
cross-section
4 pile group
keyplan
4 pile group
cross-section
R.C. Design
Critical Column
Critical load = 1668 kN
300 mm x 400 mm
4T16
G30
Critical
Beam
5.5 m x 5 m
200 mm x
x 200mm thk 600 mm
T12-100 mm
c/c
T32
G30
G30
Staircase
Height = 225 mm
Riser = 175 mm
Thread = 250 mm
Summary Design
Structural
Part
Size (mm)
Concrete
Grade
Reinforceme
nt
Slab
125
150
200
G30
T12
Beam
200 x 300
200 x 600
250 x 500
G30
T32
200
250
300
300
G30
T16
Column
x
x
x
x
200
250
300
400
Staircase
225
G30
T12
Pile cap
1040 x 440 x
500
1040 x 1040 x
G40
T20
Structural Steel
Roof slope 16
Purlin and internal member use
Channel section ( 76 mm x 38 mm x
6.7 mm)
Top Chord and bottom chord use
double channel section ( 100 mm x 50
x 3 mm)
Purlin 1.0 m c/c
Trusses 3.0 m c/c
Connection use bolt with 12 mm
diameter and 16 mm holding down bolt
Earthwork
Proposed level
2 staggered platform
5m and 4.8 m
Roadwork
U2
Flat
40 km/h
Two ways two lane
3.5m per lane
Pavement Design
Types of
Land Use
Resident
ial
apartme
nt per
unit
TRAFFIC IMPACT
ASSESSMENT
A.M peak for
P.M peak for
No. of
Unit
Informat
ion
128
Code
010105/0
6/07
Regressio
n
Equation
PCU
conversio
n factor
Trip
Rates
generator trip
generator trip
In
Out
In
Out
26 %
74 %
60 %
40%
Y = 0.3415x +
28.8758
Y = 0.3302x +
30.8344
0.91
0.91
1167 pcu/hr/ln
1462 pcu/hr/ln
Density
14.48
pcu/km/ln
17.51
pcu/km/ln
15.33 pcu/km/ln
19.2
pcu/km/ln
LOS
Water Reticulation
Water Reticulation
Layout
Loop Design
Met with the requirement
below:
Parameters
Requirement
Velocity
Headloss
Residual Pressure
< 10 m/km
22 < P < 60 m
Drainage
Drainage Layout
Sewerage
PROPOSED SEWERAGE
TREATMENT PLANT (POLYPASS)
POLYPASS DESIGN
SECTION DETAIL
Manhole Design
Spacing between manhole: < 100 m (sewer <1m
diameter)
All concrete mix shall be Grade 25.
Lean concrete mix shall be Grade 15.
Manhole Depth : < 1.5 m
Pipe size : 250-300 mm
Max Velocity : 2.10 m/s (< 4m/s)
Slope: 1:50 (rule of thumb)
Costing
Aspect
Cost (RM)
Geotechnical
1,307,650
R.C. Design
15,552,912
Steel Structure
550,000
Earthwork
900,534
Roadwork
1,000,890
Water Supply
394,910
Drainage
380,000
Sewerage
800,000
TOTAL
20,886,896
Thank you!
Q&A