You are on page 1of 38

SANDVIK DT/DTi

SERIES
Kings of the tunnel

Sandvik Mining and Construction

JUMBOS FOR ALL APPLICATIONS 1/2


SANDVIK DT8

SANDVIK DT8
DT820
DT820-C
DT820-SC
DD530-S60C

SANDVIK DT10 / DT11 / DT12


DT1030
DT1030-SC
DT1030-C Data

SANDVIK DT10
DT11
DT12

DT1130
DT1130-S
DT1130-SC
DT1130-C Data
DT1230-SC
DT1230-C Data

Sandvik Mining and Construction

ALSO FOR SMALLER TUNNELS

SANDVIK DD210

SANDVIK DD320
SANDVIK DD310

SANDVIK DD420
Sandvik Mining and Construction

2/2

A COMPLETE SERIES OF EQUIPMENT


Less is more with common components
Wide range of offering tailored to all applications
Commonality across product family
Shared components and systems
across size classes
Vertical compatibility in matrix

Commonality across carrier size


Same platform for different applications
Horizontal compatibility in matrix

DD / DT
LP
2
31
32
4
5/8
9
10
11
12
SPECIAL

Sandvik Mining and Construction

DL

DS

SANDVIK DT SERIES (examples)


Control system
Hydraulic THC

Model
DT 820
DT 1030
DT 1130

# of booms
2 + basket (o)
3 + basket (o)
3 + basket (o)

Coverage
12 - 110 m2
20 - 128 m2
20 - 183 m2

Feed length
12 - 20 ft
14 - 21 ft
14 - 21 ft

Electric TPC

DT 820-SC
DT 1030-SC
DT 1130-SC

2 + basket (o)
3 + basket (o)
3 + basket (o)

12 - 110 m2
20 - 128 m2
20 - 183 m2

12 - 20 ft
14 - 21 ft
14 - 21 ft

Automatic TDATA

DT 1030-C DATA
DT 1130-C DATA
DT 1230-C DATA

3 + basket (o)
3 + basket (o)
3 + basket (o)

20 - 125 m2
20 - 177 m2
20 - 200 m2

14 - 21 ft
14 - 21 ft
14 - 21 ft

Automatic iDATA

DT920i
DT1120i
DT1130i
DT1230i

2 + basket (o)
2 + basket (o)
3 + basket (o)
3 + basket (o)

12 - 125 m2
20 - 177 m2
20 - 177 m2
20 - 211 m2

12 - 21 ft
12 - 21 ft
12 - 21 ft
12 - 21 ft

(o) = optional

Sandvik Mining and Construction

EXCELLENT COVERAGE WITH DT


0 lookout angle

11,9 m
DT12
10,92 m
DT11
9,8 m
DT10
8,42 m
DT8

SANDVIK DT8
SANDVIK DT10
SANDVIK DT11
SANDVIK DT12
Sandvik Mining and Construction

14.20 m
15.68 m
18.28 m
19.1 m

EASY TO USE CONTROLS 1/3


Hydraulic control system - THC
Efficient hydraulics promote penetration and good drill steel economy
Optimized feed/percussion follow-up
No full power without proper drill string support
No underfeed

Adjustable rotation speed


According to bit size and changing rock conditions

Anti-jamming automatics

Comfortable working environment


Logical layout of the levers
Easy to learn
All boom movements fully proportional
Easy to adjust and troubleshoot
Sandvik Mining and Construction

EASY TO USE CONTROLS 2/3


Electric control system - TPC
Automatics combined with efficient hydraulics improve
productivity and quality in tunneling
One hole automatics
One touch for normal
drilling functions

Collaring automatics with


Rock detect
Two ramps to full speed

Adaptive drilling
Adjusting feed/percussion
pressures in changing rock conditions

Operator friendly layout for 1-3 operators

TPC
Sandvik Mining and Construction

EASY TO USE CONTROLS 3/3


Fully automatic control system - DATA
Computerization improves productivity through accuracy and
repeatability
Pre-programmed drill plans
Automatic boom positioning with
Find rock
Correct function

User-friendly controls
Operator as a supervisor
Ergonomic control panel
Easy to understand interface

Self-diagnostics
System messages on screen
Alarm log
Sandvik Mining and Construction

TDATA

HIGH DRILLING PERFORMANCE


High efficiency

HLX5 and HLX5T

75 kW power packs with HFX5T rock drills


55 kW power packs with HLX5T rock drills

High penetration rate


In all applications
In all rock formations

Very good stability due to the 2-stage stabilizer


External / adjustable

Longer tool and drifter life


Good serviceability
HFX5T
Power class

25 kW

Percussion rate

89 Hz

Operating pressure 120240 bar

Sandvik Mining and Construction

1/2

Power class

20-22 kW

Percussion rate

62 Hz

Operating pressure 120220 bar

HIGH DRILLING PERFORMANCE


Performance

(results from the test mine)

Rock
Granodiorite rock 150-200 MPa, DRI45
Quarz 30-35%

THC (55 kW)


Bit diameter 45mm
Bit diameter 64mm

3.6 m/min in face drilling


2.1 m/min in extension drilling

TPC (75 kW)


Bit diameter 45mm
Bit diameter 64mm

Sandvik Mining and Construction

2/2

4.8 m/min in face drilling


2.8 m/min in extension drilling

MADE TO TRAM AND DRILL

1/3

Made for tramming in the toughest surroundings


Fast
Powerful 4 x 4 wheel drive
110 kW Mercedes-Benz OM904LA (standard in TC8, TC9 and TC11)
170 kW Mercedes-Benz OM906LA (standard in TC12)

High ground clearance


Optimal dimensions for mobility
Both approaching and leaving angles

Endurable
Automatic altitude adjustment in diesel engine
High cold resistance
Heavy-duty axles

Sandvik Mining and Construction

MADE TO TRAM AND DRILL


Emphasis on health and safety
Safe

Good stability with all boom configurations


Big tires
Safe brake systems
Safety canopy and cabin
FOPS, ISO 3449 certified

Ergonomic operator interface


Good insulation of noise and vibration
According to EN 791

Excellent visibility
Elevating cabin in SANDVIK DT9 DT12
Operator platform located optimally in canopy models
High intensity discharge lights (35 W)
Improved illumination power is noticeable

Sandvik Mining and Construction

2/3

MADE TO TRAM AND DRILL


Emphasis on environment
Engines meet with Tier 3 emission regulations
Biodegradable oils as option
Cleaner air due to restricted shank lubrication fume
Drain led to feed surfaces, where fume converts back to fluid

Most materials recyclable

Sandvik Mining and Construction

3/3

ACCURATE AND FAST DRILLING


Feeds with good guidance
Feed force max 25 kN
Length alternatives: 12, 14, 16, 18, 20 and 21
Centralizer wear pieces made of hardened steel
Durable hose reel
TFX telescopic feed as option

Strong booms
Large coverage area with optimal shape
Large swing angles
Long boom arm / telescope

Full automatic parallelism ensures perfect control of booms


Full series with the same components
TB60, TB90, TB120 and TB150

Sandvik Mining and Construction

SAVING TIME AND MONEY

Less over-break, haulage and


concrete needed for lining
Less holes, better pull-out length
Fast tunnel advance
Less waiting times
Optimized tunneling process flow

REPEATABILITY
Even the most difficult drill plans can be repeated
accurately round by round
OPTIMIZATION
Whole drill and blast cycle can be analyzed and drill plan optimized for
better fragmentation and more accurate tunnel profile
ACCURACY
Drilling accuracy is essential for good blasting
and profile quality

Sandvik Mining and Construction

INSTRUMENTATION LEVELS
TMS

TCAD

Drill feed direction, hole depth and


penetration rate measuring instrument

Drill bit position and feed direction


measurement system
Semi-DATA

TDATA

Automatic control system of boom


positioning and drilling functions
Full DATA

Sandvik Mining and Construction

TLOG

Data logging and reporting system


Standard for TDATA
Optional for TCAD

DATA LOGGING AND REPORTING


Data logging
Production statistics
Hole data as function of hole depth
Also for bolt holes
MWD information

Reporting and analysis


Report generation with Visual
Tunneling software
Report for Windows

Printed or on-screen reports

Visual Tu
nneling
Sandvik Mining and Construction

IMPROVED SERVICEABILITY
Strong structures
Components protected against damage
All percussion parts inside one cylinder (rock drills)
Maintenance free hydraulic tubes (TC 11 and TC12)

Easy to access
All daily service points
Most components accessible on ground level
Turning and lockable components (TC8)
Electric cabinet, water hose reel, water pump

Compressors can be pulled out along rails (TC8)

Sandvik Mining and Construction

1/2

IMPROVED SERVICEABILITY

2/2

Quick diagnostics
Simple and quick adjustments & diagnostics
Interactive documentation on CDs
Visual wear indicators on rock drills

Simple to maintain
Rock drill modules can be serviced on feed beam
Percussion and rotation modules can be serviced independently
Wearing pieces can be changed w/o dismantling the boom
Clearances can be adjusted by conical cylinder pins
All hoses in boom end are of same length
Replaceable stainless steel strips in feeds
Fastening by bolts makes it easier to replace
Replacement even in pieces
Sandvik Mining and Construction

PLANNING THE TUNNEL PROJECT


Tunnel Study Program
For optimizing
the work cycle
the resources
the fleet

For estimating
drilling costs
cost savings
the fleet size

Sandvik Mining and Construction

Sandvik DTi
Fast
Accurate
User friendly

Sandvik Mining and Construction

Sandvik i-series
DT1120i
DT1130i
DT1230i

DT920i

Sandvik Mining and Construction

OPERATOR INTERFACE

Sandvik Mining and Construction

OPERATOR INTERFACE
Excellent visibility
In all drilling applications (bottom holes, profile, standing operations etc.)
Also w/o cabin elevation
Waistline 20cm lower and 20% larger windows
Battens between front windows as thin as possible
Operators seat as front as possible
Front window wipers optimized (size and operation)

Operator comfort

Present day coating materials and colours


A lot of storage (locker)
Feeling of space
Noise level inside cabin: max. 75 dB(A)
LED-type interior lights (minimized glare by reflection)

Powerful lighting
Xenon lights with high lighting power
Same lights for drilling and tramming

Safe and ergonomic


work environment
Good air conditions
Air flow to cabin optimized and measured
Filtering capacity added 33%
Cabin air conditioning and heating during tramming as standard
The use of the cabin heating/cooling devise is simplified
CD-player, ice-box as option
230VAC, 24VDC, 12VD outlets as standard
Boot washer
Floor materials of the new cabin adopts the wet cleaning
Sandvik Mining and Construction

Easy access
Illuminated stairs for cabin
Standard EN791-1:1995 Drill rig safety FOPS approved
Vibration dampened cabin
Safety barrier on doorway instead of safety belt
Thick windshield

User interface

Sandvik Mining and Construction

Sandvik Underground Rock Excavation


software
iSURE
Tunnel Line Design
Drill Plan Design
Reporting
An integrated solution...
Sandvik Mining and Construction

Sandvik Mining and Construction

Reporting

Drill & Blast Design

Tunnel Line

Project

Overview

Compatibility
Visual
Tunneling
Design

iSURE
.pla for conversion
only
.

Drill
Plan

.dp
iDATA

TCAD,
TDATA
no

Curve

Tunnel
Line

.tl
.ns
.zda

Report

Sandvik Mining and Construction

no

Report

Economical Drilling & Blasting Plan


Target is obtained via defining the cracking zone per charge (oversimplification)
and visualisation of the situation for profile, aidrow(x) and field holes upon request.
User can use the maximum charge allowable in that place.
Attention: burden area cracking circle !
Allowed cracking zone

Rc

Sandvik Mining and Construction

New features of Reporting

Sandvik Mining and Construction

New features of Reporting

Sandvik Mining and Construction

MWD data
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

New features of Reporting

Anti-Jamming State
Drilling Control Setting
Feed Pressure
Flushing Flow
Flushing Pressure
Penetration Rate
Percussion Pressure
Rock Detect
Rotation Pressure
Rotation Speed (control based)
Stabilator Pressure
State of Flushing Flow
Waterpump Pressure

Sandvik Mining and Construction

An Example of Drill Plan Design

Sandvik Mining and Construction

Round bottom design can be adjusted any time, many


times rounded design will improve the advance

Individual hole depth can be adjusted to specialize i.e


bottom corner design

An Example of Drill Plan Design

Sandvik Mining and Construction

Hole direction is done by setting the angle of few holes, directionmaster holes.
Other holes are interpolated according to them via the element

Also orientation point tool is available (top and side view)

An Example of Drill Plan Design

Sandvik Mining and Construction

Sequence defines the drilling boom and order.


Other holes are interpolated according to them via the element
Waypoints can be added to route the feed unit via an alternative way

An Example of Drill Plan Design

Sandvik Mining and Construction

Roll-over angle defines roll-over joint angle for each hole.


Tools for roll-over angle interpolation and a hot spot angle
definition for a group of holes are available

An Example of Drill Plan Design

Sandvik Mining and Construction

Setting of the detonator number

You might also like