Professional Documents
Culture Documents
CARGO
CALCULATIONS
CARGO CALCULATIONS
CARGO TERMS
CARGO CALCULATIONS
CARGO TERMS
CARGO CALCULATIONS
CARGO TERMS
CARGO CALCULATIONS
CARGO TERMS
CARGO CALCULATIONS
CARGO CALCULATIONS
Note:
Density or API is provided by the terminal or
surveyor in the load ports and what is used will be
dependent on the region / port of loading.
For example in USA / Canada, Persian Gulf, API
usage is prevalent, while entire of Europe and Asia
uses Density at 150C.
CARGO CALCULATIONS
ASTM TABLES
CARGO CALCULATIONS
ASTM TABLES
CARGO CALCULATIONS
ASTM TABLES
TABLE 53 & 54 - FOR
KG/cm3 DENSITY, oC,
15oC
Generalized Crude Oils
(Tables 53A & 54A)
Generalized Products
(Tables 53B and 54B)
CARGO CALCULATIONS
10
PROCEDURE OF CALCULATIONS
Working with API Gravity at 60oF :
1) Observed Ullage - apply trim and list corrections
- get Corrected Ullage
2) Observed Interface - apply corrections - get
Corrected Interface
3) From Corrected Ullage, find Total Observed
Volume (in metric cube)
4) From Corrected Interface, find Volume of Water
(in metric cube)
5) TOV - Water = Gross Observed Volume of
Cargo, GOV (in metric cube)
CARGO CALCULATIONS
11
12
Working Examples
No 5 COT (P) Ullage 2.0 m , Trim 2m by stern, List
10 Stbd. API 13.5, Temp 1200 F
1)
Correction = +7.1 cm
CARGO CALCULATIONS
13
Working Examples
No 5 COT (P) Ullage 2.0 m , Trim 2m by stern, List
10 Stbd. API 13.5, Temp 1200 F
2)
Correction = +10.6 cm
CARGO CALCULATIONS
14
Working Examples
Observed ullage
Correction for trim
Correction for list
Corrected ullage
= 2.00 m
= 0.07 m
= 0.11 m
= 2.18 m
3)
CARGO CALCULATIONS
15
Working Examples
From the ullage table, volume for 2.18 m ullage =
10098.3 m3
Find Volume Correction Factor (VCF) from ASTM
Table 6A
CARGO CALCULATIONS
16
= 10098.3 x 0.9783
= 9879.2 m3
CARGO CALCULATIONS
17
CARGO CALCULATIONS
18
CARGO CALCULATIONS
19
PROCEDURE OF CALCULATIONS
Working with Density at 15oC in air:
1)Observed Ullage - apply corrections - get
Corrected Ullage
2)Observed Interface - apply corrections - get
Corrected Interface
3)From Corrected Ullage, find Total Observed
Volume TOV (in cubic metres)
4)From Corrected Interface, find Volume of Water
(in cubic metres)
5) TOV - Water = Gross Observed Volume (GOV)
of Cargo (in cubic metres)
CARGO CALCULATIONS
20
CARGO CALCULATIONS
21
CARGO CALCULATIONS
22
Working Examples
No 5 COT (P) Ullage 2.0 m , Trim 2m by stern, List
10 Stbd. Density @ 150C is 0.974, Temp 350C
1)
Correction = +7.1 cm
CARGO CALCULATIONS
23
Working Examples
No 5 COT (P) Ullage 2.0 m , Trim 2m by stern, List
10 Stbd. Density @ 150C is 0.974, Temp 350C
2)
Correction = +10.6 cm
CARGO CALCULATIONS
24
Working Examples
Observed ullage
Correction for trim
Correction for list
Corrected ullage
= 2.00 m
= 0.07 m
= 0.11 m
= 2.18 m
3)
CARGO CALCULATIONS
25
Working Examples
CARGO CALCULATIONS
26
= 10098.3 x 0.987
= 9967.0 m3
CARGO CALCULATIONS
27
28
CARGO CALCULATIONS
29
CARGO CALCULATIONS
30
CARGO CALCULATIONS
31
THE END
THANK YOU
CARGO CALCULATIONS
32