WORLI MIXED USE PROJECT

Worli Mixed Use Project


Worli
MixedUSE
UsePROJECT
Project
WORLI MIXED

CONTENTS
. PROJECT OVERVIEW
. PROJECT MANAGEMENT PLAN
. PROJECT EXECUTION PLAN
. QUALITY MANAGEMENT PLAN
. SAFETY MANAGEMENT PLAN

2 Page

WORLI MIXED USE PROJECT

Worli Mixed Use Project


Worli
MixedUSE
UsePROJECT
Project
WORLI MIXED
. PROJECT OVERVIEW

1. PROJECT DESCRIPTION

2. DESIGN REVIEW

3. SHOP DRAWINGS

4. PROCUREMENT

3 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

1. PROJECT DESCRIPTION

WORLI MIXED USE PROJECT

Project

Worli Mixed Use Project

Site Address

Dr. Annie Besant Road, Next to Crompton Greaves Ltd.

Client

Samsung C&T

Consultant

Architect : KPF
Structure : LERA
MEP : RED ENGNEERING

Construction Period

Office

2011. 8. ~ 2014. 11.

Hotel

2011. 8 ~ 2015. 5.

Residential

2011. 9 ~ 2016. 1.

Site Area

12,165

Gross Floor Area

418,406
Tower A

Contract
Demarcation

Tower B

Usage

Hotel & Service Apartment

Residential

Nos. of Floor

B4 / 62F

B4 / 85F

Height

255.5m

358.6m

Major PHE System

Not yet Confirmed

Transfer /Booster Pumps, Storm


Water Harvesting

Major Fire-Fighting System

Not yet Confirmed

Hydrant, Wet Riser, Sprinkler,Gas


Suppression

4 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Water
Supply-Domestic)

A) Water Supply to Domestic Water Tanks


Domestic Tanks are located at B4, F33,F60, F85.
Water shall be transferred through Transfer Pump

Boosting
Water
Supply
F84-F79

F79
Gravity Water
Supply
F78-F56

F56
B) Water Distribution
Water shall be supplied from F84 to F79 through
Booster Pump and F78 to F56, F55 to F28 & F27 to B4
through Gravity Water Supply system

Domestic
Water Tank

F28

Gravity
Water
Supply

RO

RW
5 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Water
Supply-Domestic)

A) Water Supply to Domestic Water Tanks


Domestic Tanks are located at B4, F33,F60, F85.
Water shall be transferred through Transfer Pump

Boosting
Water
Supply
F84-F79

F79
Gravity Water
Supply
F78-F56

F56
B) Water Distribution
Water shall be supplied from F84 to F79 through
Booster Pump and F78 to F56, F55 to F28 & F27 to B4
through Gravity Water Supply system

Domestic
Water Tank

F28

Gravity
Water
Supply

RO

RW
5 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Water
Supply-Flush)

A) Water Supply to Flush Water Tanks


Flush Water Tanks are located at B4, F33,F60, F85.
Water shall be transferred through Transfer Pump

Boosting
Water
Supply
F84-F79

F79
Gravity Water
Supply
F78-F56

F56
B) Water Distribution
Water shall be supplied from F84 to F79 through
Booster Pump and F78 to F56, F55 to F28 & F27 to B4
through Gravity Water Supply system

Flush
Water Tank

F28

Gravity
Water
Supply

STP
6 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Water
Supply-Flush)

A) Water Supply to Flush Water Tanks


Flush Water Tanks are located at B4, F33,F60, F85.
Water shall be transferred through Transfer Pump

Boosting
Water
Supply
F84-F79

F79
Gravity Water
Supply
F78-F56

F56
B) Water Distribution
Water shall be supplied from F84 to F79 through
Booster Pump and F78 to F56, F55 to F28 & F27 to B4
through Gravity Water Supply system

Flush
Water Tank

F28

Gravity
Water
Supply

STP
6 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Mixed
WaterWorli
Tank Capacities

Use Project

Domestic
STP Treated
Raw Water
Storm Water
Water Tank Soft Water Tank Flush Tank (m3)
3
Tank (m )
Harvest Tank (m3)
3
3
(m )
(m )

Level

Fire Tank
(m3)

B4

387.1

451

464

78

146

127

FL13

62+62

FL 33

62+62

90+90

21+21

FL 60

62+62

90+90

21+21

FL 85

32+32

90+90

21+21

Total

823

451

1004.4

78

272

127

7 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Mixed
PipingWorli
Summary

Use Project

Piping Summary (Approx):


1) Water Supply -

25000 RMT

2) Drainage Pipes -

42000 RMT

3) Fire Protection - 126000 RMT


Total

193000 RMT

8 Page

WORLI MIXED USE PROJECT

. PROJECT OVERVIEW

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Drainage)
Drainage Systems consists of the following
1.
2.
3.
4.
5.
6.
7.
8.
9.

Soil Pipes
Waste Pipes
Vent Pipes
Rain Water Pipes
Parking Drainage
Condensate Drain Pipes
Kitchen Waste Pipes
External Storm Water Drainage
External Sewer Line

9 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Drainage)
1) Soil & Waste Pipes
The Soil & Waste drainage shall be treated
through STP and Treated water shall be
Re-circulated to Flush tank and CT makeup

FLUSH WATER
TANKS

SOIL

WATER SOFTENER

WASTE

INSPECTION
CHEMBER

STP

CT
TOWER A
MAKEUP

10 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Drainage)
2) Rain Water & Condensate Pipe
The Rain Water (Storm Water) and condensate
water would be harvested and re circulated for
irrigation purpose ,Flush and as a make-up
water for Cooling Tower

FLUSH TANKS

RAIN
WATER

IRRIGATION

CONDENSATE
STORM WATER
HARVESTING
TANK

WATER
SOFTENING

COOLING TOWER
AT TOWER A

11 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Drainage)
3) Kitchen Waste Pipe
Kitchen waste water would be passed through
grease interceptor and connected to nearest
waste stack

FL66

KITCHEN
WASTE

GREASE
INTERCEPTOR
FL60

NEAREST
WASTE STACK

FL59
12 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Drainage)
4) Parking Drainage Pipe
Garage & Parking drainage would be treated
through Oil interceptor before discharging to
Storm water network.

GROUND LEVEL

PARKING DRAIN FROM PARKING FLOORS


MANHOLE

OIL INTERCEPTOR

B1 LEVEL

PARKING
DRAIN

B4 LEVEL

SUMP PUMP

EXTERNAL
NETWORK

SUMP
13 Page

WORLI MIXED USE PROJECT

. PROJECT OVERVIEW

Worli
Mixed
Use
Project
2. DESIGN
REVIEW
(PHE
Drainage)
6) External Storm Water
External Storm Water Pipe shall be RCC Hume
Pipe NP 2 class .
Pipe will be underground connected to
municipal drain

Hume Pipe

14 Page

WORLI MIXED USE PROJECT

. PROJECT OVERVIEW

Worli Mixed Use Project

2. DESIGN REVIEW (Fire Fighting-Based on Water)

A) External Hydrant System


B) Wet Riser System (Hose Reel
& Breeching Inlets)
C) Sprinkler System
Pumps Location

B4, F13, F33, F60, F85

Major
Components

Fire Pump, Booster Pump, Jockey


Pump, Flexible Dropper, Sprinklers

Design
Parameters

Pressure: 3.5 kg/Sq Cm as per NBC


Remote Sprinkler pressure: 7 psi

Complete system shall be as per the local CFO regulations

15 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli Mixed Use Project

2. DESIGN REVIEW (Fire Fighting-Based on Water)

Pump Summary

Service

Make
Unit

Qty

Location

Hydrant / Wet
Riser Pump up to
F12

Wet Riser Pump

Sprinkler Pump

Fire Booster
Pump

Jockey Pump

Kirloskar
Mather & Platt

Kirloskar
Mather & Platt

Kirloskar
Mather & Platt

Kirloskar
Mather & Platt

Kirloskar
Mather & Platt

Nos

Nos

Nos

Nos

Nos

14

( 1 Duty & 1 Standby)

( 3 Duty & 3 Standby)

( 4 Duty & 4 Standby)

( 4 Duty & 4 Standby)

( 7 Duty & 7 Standby)

B4: 2 Nos

F13:2 Nos
F33: 2 Nos
F60: 2 Nos

B4: 2 Nos
F13: 2 Nos
F33: 2 Nos
F60: 2 Nos

F13: 2 Nos
F33: 2 Nos
F60: 2 Nos
F85: 2 Nos

B4: 2 Nos
F13: 4 Nos
F33: 4 Nos
F60: 4 Nos

16 Page

. PROJECT OVERVIEW

Worli
Mixed
Project
2. DESIGN
REVIEW
(FireUse
Fighting
HFC 227ea Gas Suppression)
Location

B1, F13, F33, F60

Major
Components

Nozzles, Gas Cylinders, Smoke


Detectors etc

Quantity

Nozzles: 111 Nos


Gas Cylinders: 53 Nos

Sinorix HFC 227ea

17 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Project
2. DESIGN
REVIEW
(FireUse
Fighting
HFC 227ea Gas Suppression)
Only for Demonstration

18 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use Project
2. DESIGN
REVIEW
(Specialist
Design for Skyscraper)
1) Building Sway
2) Building Shortening
3) Thermal Expansion & Contraction
4) Seismic

** Building Sway Analysis shall be


carried out by Specialist Third Party

21 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use Project
2. DESIGN
REVIEW
(Specialist
Design for Skyscraper)
Building Sway

Building Shortening

Thermal Expansion
& Contraction

22 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

Worli
Mixed
Use Project
2. DESIGN
REVIEW
(Specialist
Design for Skyscraper)
Ball Joint

Counter Measures

Multi Joint

Slip Joint

Expansion Supports
Slip Joint
Multi Joint
Ball Joint

Shortening Joint

Vico Joint

Shortening Joint
Vico Joint

23 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

4. PROCUREMENT (MATERIAL DESCRIPTION CHART)


Plumbing
Floor Trap

Major
Materials

Roof Drain

Garage Drain

Pipes
Floor Drain
Garage Drain
Roof Drain
Flanged Gate Valve
Clean Out Plug
Non Return Valve
Motorized Valve
Oil Interceptor

Flanged Gate Valve

Non Return Valve

Motorized Valve

Oil Interceptor

Clean Out Plug

26 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

4. PROCUREMENT (MATERIAL DESCRIPTION CHART)


Fire Fighting
Side Wall Sprinkler

Major
Materials

Pipes
Sprinklers
Flexible Dropper
Nozzle
Fire Hose Valve in cabinet
Floor Control Valve
Deluge Valve Set
Pressure Reducing Valve
Ball Valve
Solenoid Valve
Landing Valve
Control Valve
Gas Suppression System

GI Pipe

Pendent Sprinkler

Pressure Reducing Valve

Upright
Sprinkler

Butterfly Valve

27 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

4. PROCUREMENT (MATERIAL DESCRIPTION CHART)


Landing Valve

Fire Fighting
Flexible Dropper

Valve Pressure Ratinglink


Solenoid Valve

28 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

4. PROCUREMENT (MATERIAL DESCRIPTION CHART)


Fire Fighting

HFC 227ea Nozzle

HFC 227ea Gas Cylinders

29 Page

. PROJECT OVERVIEW

WORLI MIXED USE PROJECT

4. PROCUREMENT (EQUIPMENT DESCRIPTION CHART)

Major Equipment

Pump Schedule(link)

Fire Hydrant Pump


Sprinkler Pump
Jockey Pump
Diesel Fire Pump

Multi Stage Multi Outlet Pump

Split Casing Pump

Diesel Fire Pump

Diesel Fire Pump

30 Page

WORLI MIXED USE PROJECT

WorliMIXED
MixedUSE
Use
Project
WORLI
PROJECT
. PROJECT MANAGEMENT PLAN

1. PROJECT MANAGEMENT POLICY

2. PROJECT ORGANOGRAM

3. PROGRESS CONTROL PLAN

32 Page

WORLI MIXED USE PROJECT

. PROJECT EXECUTION PLAN

3. PROGRESS CONTROL PLAN


Progress Control Plan

Weekly Progress Review with Main Contractor


Daily Construction Progress Report
Weekly Construction Progress Report
Monthly Construction Progress Report

Weekly Primavera Schedule Update

36 Page

WORLI MIXED USE PROJECT

WORLI
Worli MIXED
MixedUSE
UsePROJECT
Project

. PROJECT EXECUTION PLAN

1. SEQUENCE OF ACTIVITIES

2. CONSTRUCTION EXECUTION PLAN

40 Page

WORLI MIXED USE PROJECT

. PROJECT EXECUTION PLAN

2. CONSTRUCTION EXECUTION PLAN

A) Proposed Schedule for Plumbing & FF

B) Site Mobilization Plan

C) Authority Permission Plan

D) Execution Method Statements

42 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN (SITE MOBILIZATION PLAN )


Tools & Tackles Mobilization Plan

Worli Mixed Use Project


Equipment Histogram

Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14

Aug-1
Nov-1 Dec-1
Mar-1
May-1
Aug-1
Nov-1 Dec-1
Sep-14Oct-14
Jan-15 Feb-15
Apr-15
Jun-15 Jul-15
Sep-15Oct-15
Jan-16
4
4
4
5
5
5
5
5

Welding M/C 3

10

11

12

12

13

13

14

14

14

14

14

14

14

14

14

14

14

13

13

13

12

12

10

10

Drill M/C 2
Chasing / Grind M/
C 1

12

12

12

13

13

13

13

13

14

14

15

15

15

15

15

14

14

14

13

13

12

Pipe Cutter M/C 1

10

10

10

10

10

10

10

10

10

10

10

10

Groving M/C 1

Pressure Test M/C 0

22

33

43

45

45

48

51

52

Total 8

52 52 54 54 55 55 55 55 55 54 52 51 50 46 45 35 33 22

45 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN (SITE MOBILIZATION PLAN )


Tools & Tackles Mobilization Plan
Battery Operated Tools

PIPE THREADING MACHINE

SS PIPE GROOVING MACHINE

PIPE CUTTING MACHINE

HYDRO TEST MACHINE

46 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN

Ground Floor

Logistic Plan

Unloading From Truck


on Unloading Space

Shifting to B1/B3 by crane


or manually

Transfer to Store by
Small truck or trolley

Unloading on Ground

B1

Shifting to B1

B1

47 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN

Ground Floor

Logistic Plan

Unloading From Truck


on Unloading Space

Shifting to B1/B3 by crane


or manually

Transfer to Store by
Small truck or trolley

Unloading on Ground

B1

Shifting to B1

B1

47 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN

FLOOR 13

Loading Deck Location

Lift Equipment
with Tower Crane/
Hoist Crane

Unloading Platform F13

Unload on Platform

Transfer to work
place by Trolley or
Wooden plank

F13,F33,
F60

Equipment Unloading Platform F13,F33,F60

48 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN


Shaft

Material Lifting Plan

FLOOR 13
Transfer Material to
dedicated Shaft

Lift Material from B3 /store


with Motorized Pulley

Transfer to work place by


trolley or wooden Planck

Material Lifting By Motorized Pulley


through dedicated shaft From B1 to
Upper Floors

Wooden Planck

Pallet Trolley

Equipment Unloading Platform


49 Page

WORLI MIXED USE PROJECT

. PROJECT EXECUTION PLAN

2. CONSTRUCTION EXECUTION PLAN


Motorized Pulley

Motorized Pulley Spec

Crane Capacity: 1.5 T

Wire Rope Dia: 12mm

Mechanical Floor

Wire Rope Length: 100m-200m


Shaft
Floor Level

In addition to the motorized pulley,


We shall use Tower crane, Passenger
Hoist for material and manpower
Movement when required.

Load

Floor Level

50 Page

WORLI MIXED USE PROJECT

. PROJECT EXECUTION PLAN

2. CONSTRUCTION EXECUTION PLAN


Motorized Pulley

Motorized Pulley Spec

Crane Capacity: 1.5 T

Wire Rope Dia: 12mm

Mechanical Floor

Wire Rope Length: 100m-200m


Shaft
Floor Level

In addition to the motorized pulley,


We shall use Tower crane, Passenger
Hoist for material and manpower
Movement when required.

Load

Floor Level

50 Page

WORLI MIXED USE PROJECT

. PROJECT EXECUTION PLAN

2. CONSTRUCTION EXECUTION PLAN


Motorized Pulley

Motorized Pulley Spec

Crane Capacity: 1.5 T

Wire Rope Dia: 12mm

Mechanical Floor

Wire Rope Length: 100m-200m


Shaft
Floor Level

In addition to the motorized pulley,


We shall use Tower crane, Passenger
Hoist for material and manpower
Movement when required.

Load

Floor Level

50 Page

WORLI MIXED USE PROJECT

. PROJECT EXECUTION PLAN

2. CONSTRUCTION EXECUTION PLAN


Motorized Pulley

Motorized Pulley Spec

Crane Capacity: 1.5 T

Wire Rope Dia: 12mm

Mechanical Floor

Wire Rope Length: 100m-200m


Shaft
Floor Level

In addition to the motorized pulley,


We shall use Tower crane, Passenger
Hoist for material and manpower
Movement when required.

Load

Floor Level

50 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN


C) Authority Permissions Plan..

Approach to
client for documents

Water
HE- Hydraulic Engg Dept

27 Jan 15

Drainage
DCC - Drainage

Completion Certificate

Receipt of documents
From client

21 Feb 15

Approval from
Govt. Authority

27 Jun 15

Connection to
Municipal Lines

7 Aug 15

IOD - Intimation of Disa

pprovals
SP- Sewage Proposal
STP Sewage Treatment
Plant

Revised H.E.s NOC form H.E . Department


Hydro pneumatic/Down-take system approval fr
om
H.E Department
Permanent Water connection
S P Remark
Revised Drainage approval from B.P. (if require
d)
Drainage remark from Ward
Drainage Connection form A.E. Env. / Maint. War
d
D.C.C. from B.P City
D.C.C. form A.E. Maintenance Ward
S.T.P. Approval ( if required )
S.T.P. Completion

SWD Storm Water Dept

Revised S.W.D. approval letter ( if required )


S.W.D. Completion letter
SWD Connection form A.E. Env. / Maint. Ward

PCO
PCO- Pest Control

NOC from P.C.O.

Storm Water

Office

51 Page

WORLI MIXED USE PROJECT

. PROJECT EXECUTION PLAN

2. CONSTRUCTION EXECUTION PLAN


1. Pumps & Equipments

Water Supply Pump

53 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN


2. Victaulic Fittings

5) Tighten the hex nuts

4) Match a socket

3) Insert a second pipe

1) Apply Of Lubricant

2) Push the fitting

54 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN

Actual Installation At Ceiling Level

3. Hydrant & Sprinkler Piping


Upright Sprinkler

Hi Tech Support

Hi tech Clamp
Butter Fly Valve

Tee

Coupling
Reducer
Bend

55 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN

Actual Installation at Basement

3. Hydrant & Sprinkler Piping


Actual Installation At Shaft
T Joint

Coupling Joint

56 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN

Flexible Hose Installation

4. Flexible Hose Installation

Nozzle
Flexible

Bracket

Flexible Hose

Sprinkler
Reducer

57 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN


6. CI LA Pipe Installation

4
3

2
5
1

58 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN


7. SS Pipe Installation
Union

Bend

T Joint

Socket

Flange

Coupling

59 Page

. PROJECT EXECUTION PLAN

WORLI MIXED USE PROJECT

2. CONSTRUCTION EXECUTION PLAN

4
10. Butterfly Valve

3
2
Butterfy Valve

60 Page

WORLI MIXED USE PROJECT

Worli Mixed Use Project


WORLI MIXED USE PROJECT

. QUALITY MANAGEMENT PLAN

1.PROJECT QUALITY MANAGEMENT PLAN

2. INSPECTION AND TEST PLAN

61 Page

. QUALITY MANAGEMENT PLAN

WORLI MIXED USE PROJECT

1. QUALITY MANAGEMENT PLAN

QA / QC Manager

Construction
Manager

PQP Approval and Take all


responsibility for Quality

Supervise all site activities according


to PQP Spec and approved Shop
Drawings & Method Statements

Site Engineer

Supervise Quality & Progress


of section of work

Site Team

Follow Each Trade Managers


Instruction, PQP,Spec and approved
Method Statements

62 Page

. QUALITY MANAGEMENT PLAN

WORLI MIXED USE PROJECT

2. INSPECTION AND TEST PLAN (Water Pressure Test)


* Water Pressure Test

EMERGENCY
DRAIN

INSTALLED PIPING

Step 0 - Visual Inspection of network to test.


Step 1 - Closure of all outlet point and connected valves.
Step 2 - Filling and pressurizing of water to the network.
Step 3 - Inspection and identification of leakage point, if
any
Step 4 - Discharge the water pressure by opening Drain
Valve of drain riser.
Step 5 - Attend of Leakage and set for retest to zero
leakage.
Step 6 - Release of pressure through drain point and
Retain of 1 bar pressure in network.

DRAIN
VALVE

RISER

FIRE
DRAIN
RISER

BASMENT
SUMP

64 Page

. QUALITY MANAGEMENT PLAN

WORLI MIXED USE PROJECT

Caution Tag

2. INSPECTION AND TEST PLAN (Water Pressure Test)


Water Leakage Action Plan
(Post Testing and Installation)
Post
Testing

Caution Tagging of
All Valves in Test zone

Maintain 1 Bar Standby


Pressure to identify
leakages post installation

Inform Supervisor
/ Safety

Close Valves, any


YES
pumps & Open
nearest bypass
drain

Deploying Patrolling
Team to observe any
leakages

Leakage
Observed

Inform C.M.

NO
Inform SAMSUNG

Identify & Fix Leak

Update Log

Transmit to
SAMSUNG

66 Page

. QUALITY MANAGEMENT PLAN

WORLI MIXED USE PROJECT

Testing Accessories
Accessories & Types of Plug

Muni Ball with Bypass

Air Pump

Test Ball

Hub Grip Gripper

Pipe Fit Gripper

68 Page

WORLI MIXED USE PROJECT

Worli Mixed Use Project


WORLI MIXED USE PROJECT

. SAFETY MANAGEMENT PLAN

1. SAFETY ACTION PLAN

2. SAFETY ORGANIZATION CHART


3. SAFETY PPE
(Personal Protective Equipment Plan)
4. WORKPLACE MANAGEMENT

69 Page

. SAFETY MANAGEMENT PLAN

WORLI MIXED USE PROJECT

1. SAFETY ACTION PLAN

(Tool Box Meeting)


With SAMSUNG)

70 Page

. SAFETY MANAGEMENT PLAN

WORLI MIXED USE PROJECT

2. SAFETY ORGANIZATION CHART

Project Director

Safety Manager

HSE Coordinator-1

HSE Coordinator-2

HSE Coordinator-3

HSE Coordinator-4

B4 to FL13

FL 14 to FL33

FL34 to FL60

FL61 to FL85

71 Page

WORLI MIXED USE PROJECT

WORLI MIXED USE PROJECT

75 End