Background
Definition of Availability
Scheduling methodology
Operation philosophy
Real time scheduling
Metering and billing
Pre-requisite
Effect of new tariff
What is Availability?
The readiness of the generating station to deliver
Ex-Bus output.
It is different from the earlier terminology which
includes only the status whether in service
(100%) or out of service (0%).
The term availability in the present context
could be defined as the MW capability of the
generator for supplying to the grid after
accounting for planned and unplanned outages,
auxiliary consumption and deration due to nonavailability of auxiliaries, fuel, water etc.
COMPONENTS OF ABT
CAPACITY CHARGES
ENERGY CHARGES
UNSCHEDULED INTERCHANGES
INCENTIVE
Capacity Charges
Return on Equity
Depreciation
O&M Charges
Interest on Working Capital
Interest on Loan
Taxes on Income, if any
Energy Charges
Cost of Primary Fuel (Coal, Gas)
Cost of Secondary Fuel
Working Capital
O&M expenses for one month
Coal cost for two months for non-pit head
stations corresponding to Target Availability
(T.A.)
60 days stock of secondary fuel oil
corresponding to T.A.
Maintenance spares maximum of 1% of
historical capital cost escalated @ 6% per
annum from COD (Commercial Operation Date)
Receivables equivalent to two-months average
billing calculated on T.A.
for
UI RATE
UI CHART
600
400
200
0
48.5
49
49.5
50
FREQUENCY
50.5
0
6
12
18
24
30
36
42
48
54
60
66
72
78
84
90
96
102
108
50.12
50.10
50.08
50.06
50.04
50.02
50.00
49.98
49.96
49.94
49.92
49.90
49.88
49.86
49.84
49.82
49.80
49.78
49.76
114
120
126
132
138
144
150
156
162
168
174
180
186
192
198
204
210
219
228
49.74
49.72
49.70
49.68
49.66
49.64
49.62
49.60
49.58
49.56
49.54
49.52
49.50
49.48
49.46
49.44
49.42
49.40
49.38
237
246
255
264
273
282
291
300
309
318
327
336
345
354
363
372
381
390
399
49.36
49.34
49.32
49.30
49.28
49.26
49.24
49.22
49.20
49.18
49.16
49.14
49.12
49.10
49.08
49.06
49.04
49.02
49.00
408
417
426
435
444
453
462
471
480
489
498
507
516
525
534
543
552
561
570
MERITS OF ABT
ECONOMIC GENERATION
GRID DISCIPLINE
GENERATION RELATED TO THE
NEEDS OF THE GRID
ADHERENCE TO THE SCHEDULE
FINANCIAL PENALTY / INCENTIVE FOR
UNSCHEDULED INTERCHANGE
TRADING IN SURPLUS POWER
Scheduling Methodology
Each day starting from 00:00 hr. will be divided into 96 time
blocks of 15-minute intervals.
The generator will make an advance declaration of
capability of its generating station.
The declaration will be for the capability of the generating
station to deliver ex-bus MWh for each time block of the
day. The DC, as declared by generator, would form the
basis of generation scheduling.
Demonstration of DC:
The generating company may be required to demonstrate
the DC of its generating station as and when asked by the
RLDC of the region in which the generating station is
situated. In the event of the generating company failing to
demonstrate the DC, the capacity charges due to the
generator shall be reduced as a measure of penalty.
The quantum of penalty for the first mis-declaration for any
duration/block in a day shall be the charges corresponding
to two days fixed charges. For the second mis-declaration
the penalty shall be equivalent to fixed charges for four
days and for subsequent mis-declarations, the penalty
shall be multiplied in the geometrical progression.
The operating log books of the generating station shall be
available for review by the Regional Electricity Board.
These books shall keep record of machine operation and
maintenance.
AG/DC (%)
100
BEF 50.3 Hz
90
80
70
48
48.5
49
49.5
50
50.5
51
51.5
AND
AVAILABILITY
FROM
SCE, RCC NOIDA
DECLARED CAPABILITY (EX BUS) OF DADRI
MSG NO
DTDC
REV NO
FORMAT A
DECLARATION(EX BUS)
COAL
0111R0
0
TOKEN NO
Units anticipated on bar at 00.00 hrs of next day
Units to go under planned S/D during next day
Units likely to return after S/D during next day
From
(Hrs)
To
(Hrs)
DATEOF ISSUE
01.11.04
TIME OF ISSUE
1000
unit
DC
4
0
0
From
(Hrs)
DC
TO SCE, NRLDC
01.11.04
FOR DATE
To
(Hrs)
From
(Hrs)
DC
Time
765
0
0
To
(Hrs)
0
0
0
DC
00:00
00:15
765
08:00
08:15
765
16:00
16:15
765
00:15
00:30
765
08:15
08:30
765
16:15
16:30
765
00:30
00:45
00:45
01:00
765
765
08:30
08:45
08:45
09:00
765
765
16:30
16:45
16:45
17:00
765
765
01:00
01:15
765
09:00
09:15
765
17:00
17:15
765
01:15
01:30
765
09:15
09:30
765
17:15
17:30
765
01:30
01:45
01:45
02:00
765
765
09:30
09:45
09:45
10:00
765
765
17:30
17:45
17:45
18:00
765
765
02:00
02:15
765
10:00
10:15
765
18:00
18:15
765
02:15
02:30
765
10:15
10:30
765
18:15
18:30
765
02:30
02:45
02:45
03:00
765
765
10:30
10:45
10:45
11:00
765
765
18:30
18:45
18:45
19:00
765
765
03:00
03:15
765
11:00
11:15
765
19:00
19:15
765
03:15
03:30
765
11:15
11:30
765
19:15
19:30
765
03:30
03:45
03:45
04:00
765
765
11:30
11:45
11:45
12:00
765
765
19:30
19:45
19:45
20:00
765
765
04:00
04:15
765
12:00
12:15
765
20:00
20:15
765
04:15
04:30
765
12:15
12:30
765
20:15
20:30
765
04:30
04:45
04:45
05:00
765
765
12:30
12:45
12:45
13:00
765
765
20:30
20:45
20:45
21:00
765
765
05:00
05:15
765
13:00
13:15
765
21:00
21:15
765
05:15
05:30
765
13:15
13:30
765
21:15
21:30
765
05:30
05:45
05:45
06:00
765
765
13:30
13:45
13:45
14:00
765
765
21:30
21:45
21:45
22:00
765
765
06:00
06:15
765
14:00
14:15
765
22:00
22:15
765
06:15
06:30
765
14:15
14:30
765
22:15
22:30
765
06:30
06:45
06:45
07:00
765
765
14:30
14:45
14:45
15:00
765
765
22:30
22:45
22:45
23:00
765
765
07:00
07:15
765
15:00
15:15
765
23:00
23:15
765
07:15
07:30
765
15:15
15:30
765
23:15
23:30
765
07:30
07:45
765
15:30
15:45
765
23:30
23:45
765
07:45
08:00
765
15:45
16:00
765
23:45
24:00
Rem arks
The technical minimum loading is 80% of the MCR of units on b ar
Ex bus
TOTAL MW HR
unit
DC includes:
MW
0
0
SCE, RCC
765
18360
MW H
0
0
0
0
PRE-REQUISITE / INFRASTRUCTURE
REQUIREMENT FOR ABT
Reliable and dedicated voice & data communication link
between BTPS, RLDC / SLDC & RCC.
Installation of special energy meters for recording the
system parameters at a specified time interval (15-minute)
System for certification of DC, preparation of energy
account and UI
Metering scheme to be jointly approved
Scheduling/operating rules/guidelines to be finalised with
SLDC
Mode of communication (for transmission of DC/SG)
between SLDC and RCC/BTPS.
Dedicated hardware in control room
Software for comparing SG vs AG on real time basis
Evolution of Tariff
Pre-1992 period
Single part tariff considering the fuel cost and other costs
assuming a certain level of minimum performance
Post-1992 period
a) Fixed charge
performance)
recovery
at
specified
level
of
No provision for
5% of the fixed charges to be
Developmental Surcharge additionally billed as
Developmental Surcharge
ROE = 16%
Operational Norms
Depreciation
Coal - 7.84%
Gas - 8.24%
Depreciation
Coal - 3.6%
Gas - 6.0%
Provisions as on 31.03.04
1
2
Capital
expenditure
includes
reasonable
amount
of
capitalised
spares
PLF = kWh generated /
kWh at Installed Capacity
Auxiliary power = (Gross
energy Energy delivered
at switchyard)
4
5
6
7
8
9
Provisions as on 31.03.04
Scheduled PLF for
incentive = 77%
Incentive rate 50% of the
fixed charge/unit subject to
max. 21.5 p/kWh up to 90%,
half of that for PLF above
90%
Specific oil consumption:
3.5 ml/kWh
Debt equity ratio = 50:50
10 Return on equity = 16 %
11 Transit loss of coal:
No norms
12
13
14
Provisions as on 31.03.04
0&M Cost
For 2000 -2001: Average actual
cost from 1995-2000, twice
escalated at 10%; for 2000-01
onwards 6 % escalation every
year
Provisions as on 31.0304
15 Heat Rate
Coal
200 MW
2500
500MW
2500
Gas
C/C
O/C
Anta
2100
3150
Auraiya
2125
3190
Dadri
2100
3150
Fbad
2000
2900
Kkulam
2000
2900
Kawas
2100
Gandhar
2125
16 UI rate: 0 to 420 p/kWh
For freq. 50.5 Hz to 49.02 Hz
No UI for generation above DC
17 Development Surcharge
Provision for billing 5% Capacity
Charge as Development
Surcharge
Plant Load Factor' or 'PLF' for a given period, means the total sent out
energy corresponding to scheduled generation during the period, expressed
as a percentage of sent out energy corresponding to installed capacity in that
period and shall be computed in accordance with the following formula:
N
PLF = 10000 x SGi / {N x IC x (100-AUXn) }%
i=1
where,
IC = Installed Capacity of the generating station in MW,
SGi= Scheduled Generation in MW for the ith time block of the period,
N = Number of time blocks during the period, and
AUXn = Normative Auxiliary Energy Consumption as a percentage of gross
generation
Total Capacity Charges payable to the thermal power generating company for
the:
1st month
= (1xACC1)/12
2nd month
= (2xACC2 - 1xACC1)/12
3rd month
= (3xACC3 - 2xACC2)/12
4th month
= (4xACC4 - 3xACC3)/12
5th month
= (5xACC5 - 4xACC4)/12
6th month
= (6xACC6 - 5xACC5)/12
7th month
= (7xACC7 - 6xACC6)/12
8th month
= (8xACC8 - 7xACC7)/12
9th month
= (9xACC9 - 8xACC8)/12
10th month
= (10xACC10 - 9xACC9)/12
11th month
= (11xACC11 - 10xACC10)/12
12th month
= (12xACC12 - 11xACC11)/12
where
ACC1, ACC2, ACC3, ACC4, ACC5, ACC6, ACC7, ACC8, ACC9, ACC10, ACC11
and ACC12 are the amount of Annual Capacity Charge corresponding to
Availability for the cumulative period up to the end of 1st, 2nd, 3rd, 4th, 5th, 6th,
7th, 8th, 9th, 10th, 11th and 12th month respectively.
RCC SET UP
S. NO. PARTICULARS
1 MANPOWER
AVAILABILITY
REMARKS
2 PC
E5 --- 1 NO.
E2/E3 -- 1 NO.
P3
3 FAX MACHINE
PC LINKED
4 VOICE RECORDER
5 BSNL PHONE
6 SATCOM
7 RAX
8 HOTLINE TO RLDC
9 INTERNET
1 NO. DEDICATED
FOR FAX
1 NO. DEDICATED
FOR FAX
AVAILABLE
10 MESSAGING/FILE
TRANSFER
AVAILABLE
11 ON-LINE DATA
FROM NRLDC
AVAILABLE THRO'
CDAC SYSTEM