You are on page 1of 34

Internal

Etisalat 3G Expansion Project

Check List For 3G Huawei


Equipments
(Inside Cairo Solutions-Outdoor
Sites {APM+IBBS})
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Check List For 3G Huawei Equipments (Inside Cairo Solutions-Outdoor Sites


{APM + IBBS })
1-RRU
2- 3G Cabinet
3- Cable Ladder And Cables
4- TRM Installation
5- Power cabinet

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 2

1-RRU

a)RRUS installation and fixation

b)RRUS grounding

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 3

c)

RRUS ports sealing

d) RRUS power & fiber cables protection and arrangement

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 4

e) Fiber cables arrangement , routing & labeling

f) Extra Fiber cables protection

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 5

2- 3G Cabinet
1.) Base frame / 3G cabinet mounting & Leveling with the fixation of the Cover of base frame

2) Grounding of 3G cabinet

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 6

3) External Alarms cable installation and testing

4) DC cable installation with lugs and shrinks

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 7

5)All cable installation

6) AC cable installation with terminals

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 8

7) Separation of power and signal cables

If there is a
Free place in
the cable tray

8) The cabinet must be have well lock

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 9

9) Roxtec installation (3G cabinet roxtec installation)

10) 3G integration & configuration

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 10

11) E1 Check (configuration and the Connection for RJ-connectors ) & labeling

12)No faulty modules inside the 3G cabinet & Dummy boards are installed (if required )

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 11

13) Cables inside the 3G cabinet arrangement

14) Cabinets Screws and connecting rod fastened well

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 12

15) Ensure that the power cables and connectors are fully isolated from the cabinet. and
tightened well

16) Equipment units and boards installed correctly in correct position

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 13

17) Ensure of cables and cabinets labeling and shrink tube properly installed

18) All Jumpers have the same Cross section and labeled

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 14

19) The cabinet must be have well cylindrical lock (The keys and handles were delivered to EMO )

20) Labels is ok everywhere

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 15

21) Expansion for cards availability

22) Flexible tubes under cabinets sealing

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 16

23) 3G Cabinet is working on three phase power source

24) E1 Cable shouldn't be connected directly to the cabinet

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 17

25) BBU fixation & grounding

26) DC Box fixation & labeling

Not applicable for the


Outdoor sites

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 18

27) The cabinet is installed according to Etisalat layout .

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 19

3- Cable Ladder And Cables


a) Cables correctly installed or dressed on cable ladder

b)Cables undamaged and not under strain

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 20

c) Cables secured with lacing cord or cable ties

d) Cables protected from hazardous conditions, such as sharp edges, heat, or pinching

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 21

e) Cables protected by PVC for

Outdoor Cabinets

f) Ends of all cables are labeled correctly with printed labels & Ends of all unconnected cables taped

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 22

4- TRM Installation
a) Traffic cable installation , arrangement & labeling and Traffic testing.

b) Separation of DC power cable from signal cables

If there is a
Free place in
the cable tray

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 23

c)

Connection of external alarms cable in the DDF

d) external alarms cable labeling & external alarms testing.

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 24

5- Power cabinet

a) Power cabinet grounding

b) Battery liquid flow system installation

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 25

c) Battery temperature sensor installation

d) Connector for battery complete , connect ion fixedness , Battery internal cover installation & the
Batteries are undamaged and separated from each other

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 26

e) Termination for power cable inside power cabinet

f) Power cabinet leveling & sealing

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 27

g) power cable protection, grounding

& routing

h) AC cable size according to specifications

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 28

i) Make sure all cabinet

modules are working properly

j) Ensure that the o/p DC as required and Connected to the proper cabinet as label mentioned and the
Rectifier parameters working

Not applicable for the


Outdoor sites

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 29

k) The cabinet must be have well lock.

l)Termination of the power cable connected from PDP to power cabinet (lugs and pins)

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 30

m) Make sure that all cabinet modules don't indicate alarm

n) Battery discharge test should be done during the acceptance visit


PBC 6500 Battery Health
Site Code:

1099

Activity:

Battery test for only two string

Before shutdown power

Time: min (h)

String # 1

10

30

60

90

120

150

180

210

240

After Power ON

53.4

49.8

3.9

50.3

3.6

50.3

3.4

50.3

3.5

50.4

3.5

50.4

3.5

50.4

3.4

XX

XX

XX

XX

53

3.2

Cell 1

12.5

13.32

Cell 2

12.55

13.33

Cell 3

12.52

13.31

Cell 4

12.47

String # 2

53.5

Cell 1

49.9

13.27
1.6

50.3

50.3

1.9

50.4

50.4

1.9

50.5

50.4

1.9

XX

XX

XX

XX

53.1

12.49

13.2

Cell 2

12.5

13.2

Cell 3

12.56

13.3

Cell 4

12.54

13.2

Start: 6:40 am

End: 9:50 am

Note: Starting at 6:40 due to access problem and ASP attended at 6:30 AM

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 31

2.2

o) Labeling of Power cabinet component

p)O&M manuals for the Rectifier systems kept at site

Not applicable for the


Outdoor sites

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 32

q) All DC cables from

power cabint are labeled in both ends

r) Power cabinet installation should be as Etisalat layout

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 33

s) Power cabinet roxtec closing

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 34

You might also like