(GRSP) 6MM
QUALITY ASSURANCE CIVIL DIRECTORATE
RESEARCH DESIGNS & STANDARDS ORGANISATION,
(MINISTRY OF RAILWAYS)
MANAK NAGAR, LUCKNOW-226011
Specification : IRS:T-47-2006
Raw Material : Natural Rubber (Ribbed Smoked
Sheet Grade I to IV)
Drawing No. : RDSO/T-3703, RDSO/T-3711
Gauge Drg. No.: RDSO/T-8119 & RDSO/T-8120
COMPONENTS
PROCESS
PRODUCTION INFRASTRUCTURE
KNEADER
MIXING MILL
HYDRAULIC PRESS
TESTING EQUIPMENT
TEST PARAMETERS
PRE-PRODUCTION TEST
TEST PARAMETERS
FINISHED PRODUCT
Hardness Test
Tensile & Elongation test before & after aging
Relaxed Modulus
Tension set test
Compression Set Test
Load Deflection Test
Electrical Resistance Test
Ash Content Test
Specific Gravity Test
Dimensional Test
FINAL LOT-WISE INTERNAL INSPECTION(A lot shall consist of 10000 nos. of GRSP)
Parameter
Sample Frequenc
Size
y
Acceptance Limit /
Specified Value
75 (Min)
Hardness Tester
Shore A Hardness
Tensile Strength (before ageing)
5
5
Each Lot
Each Lot
Each Lot
5
5
Each Lot
Each Lot
80% Min
200 % (Min)
Each Lot
150 % (Min)
Each Lot
65% Min
Each Lot
45-60 Kg/cm2
Each Lot
+30% /
-10% (Max)
Each Lot
Each Lot
25% Max
Each Lot
0.4 - 0.6 mm
Each Lot
Each Lot
3
3
Each Lot
Each Lot
30% Max
100 M (Min)
100 M (Min)
30% (Max)
Analytical Balance
Muffle furnace & Analytical Balance
As per Drg.
Dimensional Gauges
As per Drg
Visual
1.35 (Max)
S.N.
Specified Value
Specified Value
Specified Value
COMPOSITE PAD
COMPOUND A
COMPOUND B
75 min.
60 min.
120 min
120 min
150 min
100 min
100 min
125 min
80 min
80 min
80 min
250 min
180 min
200 min
150 min
350 min
270 min
60 min
65 min
70 min
25 - 45
45 - 60
20 -35
(+30/-10)
(+30/-10)
(+30/-10)
30 max
30 max
25 max
Tension Set. (%) Subject to 50% stretch at 100+/-1 deg.C for 24 +0/-2 hrs.
25 max.
25 max.
20 max.
0.60 to 0.9
0.40 to 0.6
0.80 to 1.2
(i)
Before Immersion
100 Min.
(ii)
100 Min.
Elongation at Break
3
Specific gravity
(i)
Layer A
(ii)
Layer B
10
Ash Content
(i)
Layer A
(ii)
Layer B
THANK YOU
PROCESS.
MIXING OCCUR BETWEEN THE MIXING CHAMBER WALLS AND THE ROTORS
MASTER BATCH IS THEN TAKEN OUT FROM KNEADER.
MASTER BATCH IS PLACED INTO THE GAP BETWEEN THE TWO MILL ROLLS.
FILLERS ARE THEN ADDED.
WHEN ALL THE INGREDIENTS ARE COMPLETELY BLENDED (DISPERSED)
THE OPERATOR CAN USE A HAND-HELD MILL KNIFE, AND TAKE OFF INDIVIDUAL SHEETS.
SHEETS ARE IMMEDIATELY COOLED FURTHER TO ROOM TEMPERATURE AND STACKED FOR
FUTURE USE.
IN BATCH TESTING IS CARRIED OUT
RHEOMETER
TESTING EQUIPMENTS
Tension Testing
Machine
Compression Tensing
Machine
Muffle Furnace
Weigh Balance
Durometer
HARDNESS TEST
ELONGATION TEST