SYSTEM/PLANT
AMARNATH BOSE
(UPES)
Fundamentals of FOHP
Fuel Oil Handling System-Main Equipment
Process Flow of HFO Unloading Storage &
Transferring System
Process Flow of Transferring HFO from Day Tank
to Boiler Burner Front
Description of various Equipment
Unit
HFO
LDO
C
cst
66
370
66
2.5 to 15.7
C
% max
50
4.5
12
1.8
Kcal/kg
0.48
0.22 to 0.28
FUNDAMENTALS :
Both HFO & LDO Systems consists of the following
Sub-systems:
Unloading System of LDO & HFO from Tanker
Storing system of LDO & HFO in Storage Tank
Transferring/Forwarding System of LDO & HFO from
Storage Tank to Day Tank
Pressuring & Transferring System LDO & HFO from
Day Tank to Steam Generator
Flushing arrangements
Storage & Day Tanks
Line Heaters
Control Valves
Flame arrestor
TANKER/
RAIL WAGON
UNLOADING
HEADER
STORAGE
TANK
STRAINER
UNLOADING HFO
FROM TANKER
UNLOADING
PUMPS
LINE HEATER
STEAM
TRAP
STRAINERS
TRANSFERRING/
PRESSURISZING PUMPS
DAY
TANK
OIL COOLER
DAY
TANK
LINE HEATERS
STRAINERS
TRANSFERRING
PUMPS
TO BOILER
TRANSFERRING/
PRESSURISZING PUMPS
LINE HEATERS
HFO
TANK
2 NOS,
TRANSFERRING/
PRESSURISZING PUMPS
LDO PUMP:
The purpose of LDO unloading pump is to unload
LDO from Road tankers to storage tank of Capacity
600 KL.
The type of the pump is positive displacement Twin
Screw Pump. Pumping will be done through positive
displacement pumps at a pumping rate of capacity
100 m3/hr @ 2.0 kg/cm2 discharge pressure, two
numbers ( One working and one stand by). The
purpose of standby pump is only at the time of
service of the working pump.
SCREW PUMP