You are on page 1of 22

ASPROFOS ENGINEERING S.A.

OFFSHORE SECTION OF STEFANIALIVERI


PIPELINE

Construction Supervision Overview



Project Overview
Installation of a N.G.H.P Offshore Pipeline
with the purpose to supply natural gas to
Evia island and a Power Plant in Aliveri.
Size of the pipeline :20
Total length of the Pipeline approximately
14.2 km
Maximum water depth along the pipeline
route: 70m.
Offshore pipeline was consist of two offshore
sections, joined together offshore by Above
Water Tie In method.



2
3
Pipeline Route Layout



Varnavas
Landfall
Karavos
Landfall
AWTI
4
S-LAY / J-LAY



S-Lay



J-Lay



Asprofos Services
5
Main purpose is to provide assurance to the Client.
Review of Plans, Procedures, Method
Statements etc.
Review the field engineering output,
Review the procurement process/attendance in
deliverance etc.
Monitor if the HSE procedures are fulfilled,
Technical support to the Client in its dealing
with the Authorities,
Contract administration services (EPC contract).
Management Services (N/A)




The Team
The Team was divided into two (2) sub teams.
The Supervising Engineering Team (Field):
Site Construction Supervision Head
Site Offshore Pipeline Supervising Engineer
Site Shore Approach Supervising Engineer
Site Engineer

Management/Review /Support Team (Head Offices):
Project Management
Pipeline Specialists


6
Main Documents Review
Project Management Documents:
Project Overview Manual, Quality Manuals, Project Control Docs, Projects HSE Docs etc
Design Engineering Documents:
PIPELINE ON BOTTOM STABILITY ANALYSIS
PIPELINE FREE SPAN ANALYSIS
CATHODIC PROTECTION PHILOSOPHY AND DETAILED DESIGN REPORT
PIPELINE PROTECTION DESIGN
TECHNICAL SPECIFICATION FOR SACRIFITIAL ANODES
GEOTECHNICAL CROSS SECTIONS
VESSEL POSITIONING PROCEDURE
SURVEY REPORT & CHARTS (PRE LAY AS LAID)
FLOODING, CLEANING, GAUGING AND HYDROTESTING PROCEDURE
PIPELINE ABOVE WATER TIE IN MANUAL

7
Main Documents Review
Design Engineering Documents:
SHORE APPROACH METHOD
START-UP MOORING ARRANGEMENT
SHORE PULL SEQUENCE
PIPELINE AWTI SEQUENCE
PIPES TRANSPORTATION (METHODS)
PRE-LAY SURVEY CHARTS FOR ANCHOR CORRIDOR
GEOTECHNICAL STUDY FOR THE TRENCH DREDGING AND BACKFILL
PRE-LAY SURVEY AT LANDFALLS
TRENCHING AND BACKFILLING MANUAL
WAVE PREDICTION STUDY
WAVE PREDICTION STUDY AT LANDFALL POINTS
WELDING COATING PROCEDURE




8
9
Main Field Activities Sequence
Pipe/Material/Equipment Deliverance.
Installation of Anchors and Concrete Blocks.
Dredging Activities Mooring Activities
Welding/Sandblasting/Coating Activities
Shore Pull Activities
Normal Pipe Laying
AWTI
Backfilling/Wave Protection/ Reinstatement
10
Main Field Activities
1. Pipe/Material/Equipment Deliverance.


11
Main Field Activities
2. Anchoring - Mooring.


12
Main Field Activities
3. Dredging Activities


13
Main Field Activities Trench Long. Profile
4. Welding/Sandblasting/Coating Activities


14
Main Field Activities
15
Main Field Activities
5. Shore Pull Activities


16
Main Field Activities - Shore Pull Sequence



17
Main Field Activities
6. Normal Pipe Laying


18
Main Field Activities
7. AWTI


19
Main Field Activities AWTI Stress Analysis
20
Main Field Activities
8. Backfilling/Wave Protection/ Reinstatement


21
Wave Protection Design



22
284, EL. VENIZELOU str. GR-176 75 KALLITHEA
ATHENS, GREECE

Tel.: +302109491600
Fax: +302109491610

http://www.asprofos.gr




THANK YOU FOR YOUR ATTENTION!