You are on page 1of 56

3G Report (Aircom Clusters Nepal)

Copyright 2010 AIRCOM International 2012 AIRCOM International Ltd

Table of Contents

Drive Test Equipment's & Procedure

Drive Test KPIs


Drive Test Call Events Plots of all Clusters :

Coverage Plot (RSSI)


RSCP Plot Active Ec\Io Plot

Mobile Tx Power Plot


Active Set Count Plot RLC Throughput DL Plot

RLC Throughput UL Plot


2
2012 AIRCOM International Ltd

Goal & Executive Summary


Drive Test Goal :
The goal was to understand the coverage footprint in the particular clusters and to know the strength & weakness of Ncell network

This drive test exercise was carried out by AIRCOM International, a leading 2G & 3G

consulting company who have a proven track record in 2G & 3G Planning & Optimization services.

3G Networks Summary :
A general overview of the results shows that all clusters are in good satisfactory condition on the basis of accessibility , Retain-ability & mobility.

2012 AIRCOM International Ltd

Drive Test Equipment & Procedure


Case 1st with Laptop-1 a. b. c. d. e. Laptop with Tems Investigation Mobile Phones : 2 (one for Uplink and another for Voice (Short Call)) GPS File Size for UL is 25MB Voice Call of 90 Seconds with 15 Seconds pause time (Strictly in 3G Mode)

Case 2nd with Laptop-2 a. b. c. d. e. Laptop with Tems Investigation Mobile Phones : 2 (one for Downlink and another for Voice (Long Call)) GPS File Size for DL is 100MB Voice Call of 8 Minutes with 15 Seconds pause time (Strictly in Dual Mode)

Other Details: FTP Server-116.68.212.6 Username= transfer Password=#S@m$!!!370 Call Test Number-9802108108

2012 AIRCOM International Ltd

Drive Test KPIs


DT KPI UTRAN HO to GSM Success Rate UMTS UMTS SHO Active Dropped Call Setup Success Set Size calls Rate Success Rate % (#1)% % Rate % Average Average 16QAM 16QAM Average Average HSDPA HSUPA or Higher, or Higher, RSCP Ec/Io Throughp Throughp DL % UL % ut(Kbps) ut(Kbps)

Current DT KPI Value Target level of the KPI Cluster-1 Cluster-2 Cluster-3 Cluster-4 SAGARMATHA POKHARA GANADAKI

92

100

5.9

91.7

33.6

-81.03

-8.03

51.5

1906.56

781.1

97

100

96

50

-75

-6.5

70

30

2100

1000

100 100 100 100 100 100 100

98.95 98.77 98.73 99.09 99.60 98.54 99.80

1.75 1.65 3.32 3.68 0.93 0.74 0.00

99.48 97.98 96.91 95.88 98.35 99.45 98.35

71.03 66.77 72.39 70.92 85.79 69.50 80.93

-78.73 -76.13 -79.89 -78.53 -86.30 -78.44 -83.22

-8.60 -8.57 -8.64 -8.25 -5.42 -6.26 -5.80

25.99 27.31 24.55 19.03 54.00 55.66 54.43

0.72 0.76 0.61 0.34 0.38 9.54 41.06

1607.58 1707.41 830.67 1276.04 1131.90 1131.04 676.36

938.90 897.01 1529.40 803.38 1235.68 1092.10 1177.55

2012 AIRCOM International Ltd

Drive Test call Events


Overall Events of Aircom Clusters
2G/3G Voice Call Events Cs Call Attempt 3G+2G Call Established 3G+2G Blocked Call 3G+2G Total Dropped Call 3G+2G Handover to GSM HandoverFail to GSM SHO Complete SHO Attempt (Radio Link Addition+Removal+Replacement) GSM Network UMTS 2100 Network % Active Set Size (#1)% Active Set Size (#2)% Active Set Size (#3)% Location Area Update Location Area Update Failed RSCP Greater than (-75 dBm)% RSSI Greater than -(-75dBm) % Ec/Io Greater than -(-6.5 dBm) % UE Tx Pwr less than - (0 dBm) PDP Context Activation PDP Activation Failure QPSK% 16QAM% RLC Tput Max(All Sessions) kbps Down Load RLC Tput Max(All Sessions) kbps Up Load RLC Tput Average(All Sessions) kbps Down Load RLC Tput Average(All Sessions) kbps Up Load Average Ec\Io (dBm) Average RSCP (dBm)
6

Long-Short & DL -UL 3772 3692 80 77 133 0 110821 112065 28.46 71.55 73.90 19.94 6.15 713 1 34.73 58.22 38.12 79.27 1920 8 77.54 22.46 4031.12 2226.79 1380.67 910.05 -7.36 -80.18
2012 AIRCOM International Ltd

During complete drive , there is no failure during 3G to 2G Handover. Average Ec\Io is of all clusters is -7.36dBm, which is also a good sign for network. Average RSCP is too good and reporting value is -80.18dBm. Mobile transmit power less than 0dBm is 79.27.Its means coverage in all clusters seems good excluding few road in KTM clusters. Average RLC Tput in Both UL & DL is quite good.

Cluster-1 Coverage Plot (RSSI)

2012 AIRCOM International Ltd

Cluster-1 (RSCP PLOT )

2012 AIRCOM International Ltd

Cluster-1 Active Ec\Io Plot

2012 AIRCOM International Ltd

Cluster-1 Tx Power Plot

10

2012 AIRCOM International Ltd

Cluster-1 Active Set Member Count

11

2012 AIRCOM International Ltd

Cluster-1 RLC DL Throughput Plot

12

2012 AIRCOM International Ltd

Cluster-1 RLC UL Throughput Plot

13

2012 AIRCOM International Ltd

Cluster-2 Coverage Plot (RSSI)

14

2012 AIRCOM International Ltd

Cluster-2 (RSCP PLOT )

15

2012 AIRCOM International Ltd

Cluster-2 Active Ec\Io Plot

16

2012 AIRCOM International Ltd

Cluster-2 Tx Power Plot

17

2012 AIRCOM International Ltd

Cluster-2 Active Set Member Count

18

2012 AIRCOM International Ltd

Cluster-2 RLC DL Throughput Plot

19

2012 AIRCOM International Ltd

Cluster-2 RLC UL Throughput Plot

20

2012 AIRCOM International Ltd

Cluster-3 Coverage Plot (RSSI)

21

2012 AIRCOM International Ltd

Cluster-3 (RSCP PLOT )

22

2012 AIRCOM International Ltd

Cluster-3 Active Ec\Io Plot

23

2012 AIRCOM International Ltd

Cluster-3 Tx Power Plot

24

2012 AIRCOM International Ltd

Cluster-3 Active Set Member Count

25

2012 AIRCOM International Ltd

Cluster-3 RLC DL Throughput Plot

26

2012 AIRCOM International Ltd

Cluster-3 RLC UL Throughput Plot

27

2012 AIRCOM International Ltd

Cluster-4 Coverage Plot (RSSI)

28

2012 AIRCOM International Ltd

Cluster-4 (RSCP PLOT )

29

2012 AIRCOM International Ltd

Cluster-4 Active Ec\Io Plot

30

2012 AIRCOM International Ltd

Cluster-4 Tx Power Plot

31

2012 AIRCOM International Ltd

Cluster-4 Active Set Member Count

32

2012 AIRCOM International Ltd

Cluster-4 RLC DL Throughput Plot

33

2012 AIRCOM International Ltd

Cluster-4 RLC UL Throughput Plot

34

2012 AIRCOM International Ltd

Cluster-7 (SAG) Coverage Plot (RSSI)

35

2012 AIRCOM International Ltd

Cluster-7 (SAG) (RSCP PLOT )

36

2012 AIRCOM International Ltd

Cluster-7 (SAG) Active Ec\Io Plot

37

2012 AIRCOM International Ltd

Cluster-7 (SAG) Tx Power Plot

38

2012 AIRCOM International Ltd

Cluster-7 (SAG) Active Set Member Count

39

2012 AIRCOM International Ltd

Cluster-7 (SAG) RLC DL Throughput Plot

40

2012 AIRCOM International Ltd

Cluster-7 (SAG) RLC UL Throughput Plot

41

2012 AIRCOM International Ltd

Cluster-8 Coverage Plot (RSSI)

42

2012 AIRCOM International Ltd

Cluster-8 (RSCP PLOT )

43

2012 AIRCOM International Ltd

Cluster-8 Active Ec\Io Plot

44

2012 AIRCOM International Ltd

Cluster-8 Tx Power Plot

45

2012 AIRCOM International Ltd

Cluster-8 Active Set Member Count

46

2012 AIRCOM International Ltd

Cluster-8 RLC DL Throughput Plot

47

2012 AIRCOM International Ltd

Cluster-8 RLC UL Throughput Plot

48

2012 AIRCOM International Ltd

Cluster-9 (GAN) Coverage Plot (RSSI)

49

2012 AIRCOM International Ltd

Cluster-9 (GAN) (RSCP PLOT )

50

2012 AIRCOM International Ltd

Cluster-9 (GAN) Active Ec\Io Plot

51

2012 AIRCOM International Ltd

Cluster-9 (GAN) Tx Power Plot

52

2012 AIRCOM International Ltd

Cluster-9 (GAN) Active Set Member Count

53

2012 AIRCOM International Ltd

Cluster-9 (GAN) RLC DL Throughput Plot

54

2012 AIRCOM International Ltd

Cluster-9 (GAN) RLC UL Throughput Plot

55

2012 AIRCOM International Ltd

56

2012 AIRCOM International Ltd

You might also like