Professional Documents
Culture Documents
POLICY IN SEGOFS
SECTIONS
INTRODUCTION
SEGOFS
ENERGY SERVICES LIMITED (SESL) is a 100% Nigerian company, was incorporated in January 2006 with a primary focus on the provision of top class drilling support services to the oil and gas industry, with arms specialized in provision of directional drilling, 3D laser scanning, pressurized habitat, consultancy and training services. is guided by the motto:- Do It Right The First Time.
SESL
SESL
maximise the use of local expertise, supported by cutting edge technologies to deliver services to our clients under a competitive price regime without compromising quality, safety and environmental issues.
SESL BUSINESS
HSE POLICY
Introduction
Safety
is the condition of being protected from or unlikely to cause danger, risk or damage. Unsafe acts includes, Failure to wear PPE. Wearing unsafe clothing. Horseplay. Unsafe Conditions includes, Hazardous environment. Hazardous equipment.
Continuation
Near misses includes,
A personnel was descending a stair case and his shoe slipped of due to wetness of the floor. He would have fallen down and sustain serious injury (broken legs, hands, broken ribs and teeth) but was able to hold the two rail and regained balance. Accidents are unplanned incidents causing injury and death. Examples are Situation where a stab suspended from a crane falls and squashes an unsuspecting worker below it.
SAFETY GOALS
The
SESL goals establishes for safety includes: Provide safe and healthful working conditions. Prevent accidents and accidents-related causes. Eliminate occupational illnesses. Protect the environment. And so on.
General
Safety Guidelines Employees shall ensure that proper clothing and PPEs are worn all times. Apply safe lifting procedure while engaging in the act of lifting. Employees should be familiar with company and client emergency notification system.
SAFETY INCENTIVES
Almost all accidents are preventable.
gifts are given as incentives for employees that meet company safety goals.
Continuation
Policy on Use of Seat Belt Journey Management Policy Waste Management Policy Waste Disposal Policy Housekeeping Policy Training Policy Access Control Policy Policy Statement on PPE Quality Control Policy Policy on HSE Meetings Fraud and Malpractice Policy
PERMIT TO WORK
This
is a permit that must be obtained before one is allowed to work in any oil and gas facility. Permit to work includes: General Work Permit Hot Work Permit Confined Space Entry Permit. Excavations Permit Lockout Tagout
SECTION IN SESL
Workshop
Well
Habitat and
Tendering
Tool
WORKSHOP
Its a designed
area or building used for equipment preparation and can provide in-house and field support to an operation.
Equipments
that can be found in SEGOFS workshop are Griffith Torque Master Positive Displacement Motor Compressor Steam Wash Jar Testing Console Hole Opener and Bull nose Fork Lift Tool Racks and equipments Hoisting equipment Habitat materials
Drilling is the science of deviating a wellbore along a predefined course to a defined subsurface target. Directional:
Applications of
Sidetracking Inaccessible Location Multiple Exploration Wells from a Single Wellbore Onshore to Offshore Drilling Horizontal Wells
WELL PLANNING
Well
planning is defined as those engineering activities, which follows follow on from the identification of a subsurface target for a well (exploration, appraisal, or development well) until the completion of that well. This activities includes: Definition of well objectives Planning of well trajectory Selection of drilling hardware (bits, tubulars, mud etc) Planning of casing points Selection of logging tools(MWD, LWD) Testing program and decision criteria for testing Completion program and criteria for completion
SURVEY
Survey are carried
out to ascertain the latest bottom-hole position. At the end of a successful survey, the following three pieces of information are known: Survey Measured Depth Borehole Inclination Borehole Azimuth
methods include: Tangential Method Average Angle Method Radius of Curvature Method (Most Accurate) Minimum Curvature Method (Most Accurate) Survey in SESL is calculated using Minimum Curvature Method
well profile is the planned well trajectory from the surface to the final drilling depth by projecting the wellbore onto two plotted planes. In order to determine the best geometric well profile from the surface to the bottomhole target, the following information must be known Position of surface location
Features of
a directional well profile are as follows: Surface Location Kickoff Point Well Inclination End of Build Hold Angle Tangent Section Start of Drop End of Drop Target Displacement Target Location Drop off Rate Build up Rate
Continuation
Turn Rate Measured depth Horizontal displacement Azimuth
VERTICAL WELL
S-WELL
J- WELL
HORIZONTAL WELL