You are on page 1of 60

The DMAIC Improvement Process

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 1

Why- What - How


Understand the principles (i.e. Know-why) Concepts

Process
Techniques & Tools

Put them into practice (i.e. Know-how)


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 2

The DMAIC Phases


2. Measure 1. Define
Identify Project
Determine Capability

Investigate Causes 3. Analyze

5. Control
Sustain Improvements
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

4. Improve Find Solutions


Section 2 / Slide No : 3

The DMAIC Process Steps


Phase Step Task

DEFINE

1
2 3

Identify Focus Areas


Set Up Project and Deploy Team Define Key Process Output Variable Develop Data Collection Plan Determine Process Current Performance

MEASURE

4 5

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 4

Phase

Step 6

Task Brainstorm All Possible Causes Shortlist Major Suspected Causes Verify Root Causes Identify and Evaluate Possible Improvement Solutions Confirm Improvement Solutions Standardize Improvement Plan Close The Project

ANALYSE

7 8 9 10 11

IMPROVE

CONTROL 12
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 5

Define: Identify Project


1. Identify Focus Area 2. Set Up Project and Deploy Team

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 6

1. Identify Focus Areas


Focus limited resources on important areas.
The effort involves a working session with the participation of the management team (the sponsors) where they examine the various possible areas that impact the business results and, with the use of a structured collective decision making process, decide the critical areas to focus the improvement efforts. Examples of focus areas include line reject rate, on-time shipment, capacity utilization, inventory turns, response time and warranty costs/customer complaints.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 7

A tool that is commonly used for this purpose is the Tree Diagram
Increase Sales

Sales Orders Production Output

Sales Lead Time On Time Delivery Order Fulfillment Customer Complaints Process Yield Down Time Process Efficiency Time to Market Market Success Rate Design Changes Material Price Material Usage Rate Lot Reject Rate

New Products
Material Cost

Profitability

Manage Cost

Failure Cost

Improve Working Capital


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

W I P Rejects Material Rejects Electricity Utility Cost Water Account Receivable Gas
Inventory Section 2 / Slide No : 8

Alternatively, the SIPOC diagram is used. SIPOC is more suitable for service organizations or supporting departments.

SIPOC Diagram
[Supplier Inputs Process Outputs Customers]

Inputs
Suppliers

Process

Outputs
Customers

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 9

SIPOC Diagram
Example: Suppliers
Requesting Department

Inputs
Requisition request

Process
Recruiting

Outputs
New Staff Employment Letter Orientation program

Customer
Requesting Department New staff New staff Finance Dept. HR Dept.

Job Applicants Application 1. Review Request letters 2. Advertise Position Finance Department Management Company budget Company policy 3. Screen Applicants 4. Interview Candidates

Payroll 5. Prepare Employment information Letter Personal 6. Orient new staff record file
Section 2 / Slide No : 10

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

2. Set Up Project & Deploy Team


Project Idea Sources
Performance Gap Voice of Customer Cost Reduction Initiative

Competitive Pressure

Ideas Generation

Issues of Concern

Ideas Prioritization

Selected Projects
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Project Charters
Section 2 / Slide No : 11

Prioritize Project Ideas


Impact / Benefits

Project F Project A Project C Project B Project G Probability of Project H Project E Project D

Success / Ease of Effort

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 12

Develop the Project Charter


The project sponsor (usually with the help of his/her people) defines the problem statement, decides the improvement goal, and selects the project team members. Project charter helps to make sure that due thoughts are given to make sure that the project is properly set up. The project should be scoped at the process level where specific actions can be taken to realize the improvement in business results. The outcome of this step is an approved project charter.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 13

Project Charter
A Project charter is a document created at the start of a project to assign the project to the team. It is an important tool for getting commitments from the team members. A Team Charter should specify the following:

Issue : 1.0/09-04

Project title and the project scope. The business case and problem/opportunity statement. The goal statement. Estimated financial benefits. Name of the sponsor. Team leader and members. Project timeline.
Section 2 / Slide No : 14

Copyright Pera Neville Clarke Pte Ltd, 2004

Example of Project Charter


Project Title

To reduce late payments


Business Case

Problem/Opportunity Statement

Estimated 30% of payments are received later than the credit term of 60 days
Goal Statement

Improve cash flow. Reduce bad debt risks


Project Scope

To reduce late payment percentage to less than 5%


Team Leader Members

Account receivable process


Time Line Phase 1 Phase 2 Phase 3 Phase 4 Sponsor Name Mar XX Apr XX May XX Jun XX Sign

Financial Benefit (estimate)

Date
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 15

Notes on forming a team : There should be an appointed member (sponsor) of top management Team members are to be selected based on the problem statement and the scope involved. Team members must have good working knowledge of the subject matter.

Rule of thumb for the number of team members is 5 to 7 persons.


The team leader should be trained in: Problem solving process steps Team facilitation skills Process improvement tools
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 16

The 4 Rights of Successful Projects


Right project.
Right team composition. Right team process.

Right Results
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 17

Measure: Determine Process Capability


3. Define key process output measure/s 4. Develop a data collection plan 5. Determine process capability

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 18

3. Define Key Process Output Measure


Input Process Output

Why is it necessary to measure the process output? To quantify the current performance level. To objectively evaluate the gap. To aid in the analysis of key input factors. To verify the effectiveness of the improvement solutions.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 19

Examples of Process Output Measure: Proportion defective / Proportion of rework

Defect per unit / Error per unit / Callback per unit


Process capability ratio (Cpk, Ppk) Cycle time / Turn- around-time / Service response time / Queue time On time delivery / Span (Order to Delivery) Proportion of value adding activities

Availability of personnel / material / facility

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 20

4. Develop Data Collection Plan


To make sure the data collected are reliable and accurately describes the process output characteristics.

Components of Data Collection Plan: Definition of process output measures Data collection method Sampling timeframe Sample size Sampling method Recording sheet
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 21

Example: Process output measure


Cycle time (day) from the date of invoice issued to the date when the payment is received

Data Collection Method


Obtain the data from existing records

Sampling Time Frame


Jun xx to Dec xx

Sample Size
60 invoices

Sampling Method
Random Samples

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 22

5. Determine Process Capability


Gather process output data according to the data collection plan.
Translate the raw data into useful process information:

- Use histogram to show the variation in process output variable.


- Estimate the process average and process variation using descriptive statistics. - Compute the process capability figure.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 23

Example: Process Output Variation


Descriptive statistics of process output variation:

Mean is 57 days.
Standard deviation is 7 days.

(Output From Minitab)


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 24

Example: Process Capability Study

Defect per million is 336,000

(Output From Minitab)


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 25

Analyze: Investigate Root Causes

6. Brainstorm all possible causes 7. Decide the vital few suspected causes 8. Verify the causes

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 26

6. Brainstorm All Possible Causes


List all possible factors causing the process performance gap.
Team leader to facilitate the brainstorming process. Leverage collective experiences of the team members. Search thoroughly, do not leave out any possible cause. Depending on the situation, choose the most suitable tool for this purpose. (Cause and Effect diagram, Process FMEA, Process Mapping)
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 27

Identify possible causes using brainstorming and organize the information using cause and effect diagram
Customer Related
Customer Payment Policy Customer Location Customer Financial Position Customer Acct Payable Process Need for Currency Exchange Payment Method Frequency of Invoicing

Invoice Related
Money Amount In Invoice Errors In Invoice
Dont Match P.O. Wrong Address Wrong Amount

Product Quality Problem No Follow Up On Past Dues Relationship With Customers Customer Type

Why Are Customers Late In Paying Invoices?

Invoicing Method
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Others
Section 2 / Slide No : 28

7. Decide the Vital Few Suspected Causes


Use structured discussion and teams collective knowledge to narrow the possible causes down to a few most probable causes. Team leader to facilitate this narrowing process. It is important for the team to gain a common understanding on the possible causes before starting the narrowing process.

Choose the most suitable tool for this purpose. (Multivoting, nominal group technique, selection matrix)
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 29

Decide the key suspects using multi-voting method


Possible Causes 1 Customer Payment Policy 2 Customer Location 3 Customer Financial Position 4 Customer Acct Payable Process 5 Currency Exchange 6 Payment Method 7 Frequency of Invoicing 8 Money Amount In Invoice 9 Errors In Invoice 10 Product Quality Problem 11 No Follow-up On Past Dues 12 Relationship With Customers 13 Customer Types X X X X X X X X X X X X X X X X X X X X X X X Irene Mary X X John Peter Adeline X X X X X Score 3 4 1 2 0 4 2 5 5 1 2 1 0

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 30

8. Verify the Causes


Confirm the key suspects are actually root causes. Make sure the key suspect are actually root causes. Discuss and decide how to confirm the key suspects. The methods commonly used for this purpose include: - Historical data analysis. - Design of Experiments. - Process observation and tracking.

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 31

Historical data collected on the 4 key suspects

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 32

Using Dot Plot to verify whether error is a root cause

(Output From Minitab)


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 33

Using Box Plot to verify whether location is a root cause

(Output From Minitab)


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 34

Example: Hypothesis Testing

Ho: There is no difference in the means of payment days among the different locations. Ha: At least one of the means is different.
Cannot dismiss Ho

(Output From Minitab)


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 35

Using Box Plot to verify whether payment method is a root cause

Dismiss Ho, accept Ha.


Use ANOVA to confirm payment method is a root cause

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 36

Using Scatter Diagram, it appears that money amount does not effect days payment

Using Scatter Diagram with stratifications, it appears that money amount has some correlation with days payment

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 37

Using Multiple Regression to confirm the effect of money amount on days payment

(Output From Minitab)


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 38

Improve: Find Effective Solutions


9. Identify and Evaluate Possible Improvement Solutions 10. Confirm Improvement Solutions

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 39

9.

Identify and Evaluate Possible Improvement Solutions

Identify various possible solutions and evaluate their effectiveness in solving the problem.
With the root causes identified, brainstorm all possible improvement solutions. The first solution is usually not the best solution. Without any constraints, generate a list of possible solutions. Choose the most suitable creativity technique for this purpose. Evaluate and select the best improvement solution.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 40

Challenging conventional thinking / assumptions:

Do not think
- It cant be done.

Think
- How to get it done.

- It will not work.


- Theyll never buy it. - Weve always done it this way. - Weve never tried this before.

- Try and make it work.


- We can convince them. - Lets find a better way. - If we dont try, we wont know.

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 41

Select Best Solution


Use Effectiveness Practicality Matrix to evaluate each idea.
Effective

G F C D A
Practical

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 42

Using Force Field Analysis to evaluate in detail the idea of giving rebate if customers pay on time for those invoices with high dollar values.
Driving Forces +

- Restraining Forces

Increased cash flow of about $ xx.


Contribute $xx to financial benefits.

An estimated $xx will be incurred as rebates.


An estimated xx hrs of administrative efforts.

An estimated total cost of $xx will be incurred by the company

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 43

Step 10: Confirm Improvement Solutions


Purpose: Make sure solutions are effective before standardization. Decide and develop an action plan to check solution effectiveness. Collect initial data to make sure the solutions are effective: - Check data distribution, compute the descriptive statistics, calculate new process capability. Perform potential risk assessment and stakeholder analysis to anticipate and address possible problems when implementing the solutions.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 44

Descriptive statistics of process output variation: Mean is 42 days. Standard deviation is 6 days.

Process Capability: Defect per million is 1,260


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 45

Establish Action Plan


Improvement Action Error proof the invoicing process. Make arrangements with customer to use payment method other than check. Develop and implement a rebate scheme
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Responsible Person Irene

Completion Date 18 May

Peter

30 May

Adeline

30 May

Section 2 / Slide No : 46

Control: Sustain the Improvements

11. Standardize Improvement Plan 12. Close the Project

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 47

Step 11: Standardize Improvement Plan


Purpose: Incorporate improvement solutions into process control system.
Transfer the solutions from the team to the process owners.

Revise process control system / documents (control plan, procedure, work instruction, etc.)
Train / brief staff on the revised process control system. Implement a continual monitoring system.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 48

Step 12: Close the Project


Get Champions approval to close the project. Project can be closed when: - The project phases have been completed.

- Project documentation have been completed.


- Improvement plan documented. Share the lessons learned and knowledge gained with other related processes / areas.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 49

Process Mapping, Analysis and Redesign Project Example


Define: Identify Project Problem Statement : The time taken from the moment production is completed to delivery is 2 days. Some urgent orders require products to be delivered in 1 day. Goal Statement : To reduce the turn-around-time ( TAT) to 1 day. Project scope: Order fulfillment process
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 50

Measure: Determine Process Capability Map the As-Is Process Make the process visible by creating the process maps. Common process mapping methods: Linear flowchart Cross functional map Relationship map Validate the maps created by walking through the process and collect the necessary data.
Section 2 / Slide No : 51

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Orders Fulfillment Process Cross Functional Map (As-Is)


Day 1

8 QA Technician

10

11

12

Prepare Samples

Perform Lab Test

Key In Test Results Visual Inspection

Visual Inspector

Packers
Packing

Store Supervisor
Update F/G Stock

(continue)
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 52

Day 2

8 Sales Officer
Issue D.I.

10

11

12

Prepare D.O. and Gate Pass Approve D.O. and Gate Pass Pick Lots Updates F/G Stocks Prepare Shipments

Sales Manager

Store Supervisor

QA Clerk
Prepare Test Certificates

QA Manager

Approve Test Cert Deliver Shipment Section 2 / Slide No : 53

Delivery Driver

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Orders Fulfillment Process Relationship Map (As-Is)


Test Certificates

QA Manager

D.O. & Gate Pass


Lot Numbers

Store Office
D. I. Lot Numbers Passed Lot Numbers Pallet Number

Sales Office

Quantity Accepted

QA Lab
D.O., Gate Pass & Test Certs

Packing

Visual Inspection

Driver

Quantity Accepted Test Certificates

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 54

Analyze: Investigate Root Causes


Examine the As-Is Process Look for flaws in the as-is process. Examples of process flaws: Waiting Duplication Non-value adding activities Unnecessary check / approval Errors Rework

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 55

Analysis Summary
A] Waiting - Visual inspection will not start unless laboratory tests have been completed.

- Store supervisor waits for the test certificates before he can prepare the shipment.
B] Duplications

- Packers record product names, lot numbers and quantities and send these information to store. Store supervisor keys in the same information into the finished goods inventory system.
C] Non-value Adding Activities - Unnecessary movements involved in sending information or documents around.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 56

Improve: Find Effective Solutions


Identify Improvement Solutions: A] Reduce waiting.
Laboratory tests and visual inspections to be performed concurrently. Store supervisor prints test certificates from computerized workflow system.

B] Reduce non-value adding activities & duplications.


Packers key in product information into finished goods inventory system. Reduce document movements by installing a computerized workflow system. Empower QA technicians to decide lot acceptance based on the specification.
Section 2 / Slide No : 57

Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

7 Principles of Process Redesign


A useful guide for redesigning work processes: Organize work around results, not tasks. Work parallel instead of sequentially. Capture data only one time when it is first created. Allow decision where the work is performed. Incorporate controls into information processing. Make people who use a process do the work. Treat geographical dispersed resources as one.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 58

Technology Enablers
Leverage on technologies to improve work processes:
Computerized workflow system. Document imaging and management.

Groupware.
Electronic Commerce. Automated input.

Mobile and remote computing.


Wireless communication.
Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Section 2 / Slide No : 59

Control: Sustain the Improvement Implement the should-be process


8
QA Technician Visual Inspector
Visual Inspection

10
Test Samples

11

12

Prepare Samples

Key In Test Results

Packer Store Supervisor Sales Officer

Packing

Update F/G Stock Prepare Shipment Pick Lots, Prepare D.O. and Test Cert.

Issue D.I.

Sales Manager Driver


Copyright Pera Neville Clarke Pte Ltd, 2004 Issue : 1.0/09-04

Approve D.O.
Deliver Shipment

Section 2 / Slide No : 60

You might also like