Growth to cope with GDP Planning Commission Projects 7 to 8% growth IR to develop by 2020 - to carry freight traffic of about 1700 million tonnes per annum. IR plans 6% freight increase and 3.5% passenger service increase Shortfall - 300 million tonnes of freight and 2 million passengers. Rail Freight rates are among the highest in the world due to cross subsidy of passenger freight Lack of operational flexibility Inadequate up gradation of service levels Non-availability of wagons Frequent congestion of sidings
Growth to cope with GDP Planning Commission Projects 7 to 8% growth IR to develop by 2020 - to carry freight traffic of about 1700 million tonnes per annum. IR plans 6% freight increase and 3.5% passenger service increase Shortfall - 300 million tonnes of freight and 2 million passengers. Rail Freight rates are among the highest in the world due to cross subsidy of passenger freight Lack of operational flexibility Inadequate up gradation of service levels Non-availability of wagons Frequent congestion of sidings
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online from Scribd
Growth to cope with GDP Planning Commission Projects 7 to 8% growth IR to develop by 2020 - to carry freight traffic of about 1700 million tonnes per annum. IR plans 6% freight increase and 3.5% passenger service increase Shortfall - 300 million tonnes of freight and 2 million passengers. Rail Freight rates are among the highest in the world due to cross subsidy of passenger freight Lack of operational flexibility Inadequate up gradation of service levels Non-availability of wagons Frequent congestion of sidings
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online from Scribd
• Planning Commission Projects 7 to 8% growth • IR to develop by 2020 – To carry freight traffic of about 1700 million tonnes per annum – To carry 25 million passengers daily • IR plans 6% freight increase and 3.5% passenger service increase • Shortfall - 300 million tonnes of freight and 2 million passengers Saturated Routes • Golden Quadrilateral and Diagonals • Quantum jump to be catered • Higher axle load 20 to 30 tonnes • Increase round trip kilometerage of train • Dedicated Freight Corridor • Higher HP locomotives • Lighter wagons – 120 tonnes gross load Rail Road Coordination • Road • Rail • Heavily congested • Freight rates are amongst the • Only one percent of total highest in the world due to cross National Highways is four subsidy of passenger freight laned • Lack of operational flexibility • Freight vehicles cover 250-300 • Inadequate up gradation of km in a single day as against service levels 500-600 km in developed • Non-availability of wagons countries • Frequent congestion of sidings • Energy guzzlers • Inter zonal conflict /Environmental unfriendly • High over-all costs due to other • 60 tonnes Volvo Trucks cost • Customized service • Bulk management • Specialized Vehicles • Quick transport • Consignment tracking • Green transport • Door to Door service • Energy efficient Safety First • Consequential Train Accidents – 2002-03 - 349 – 2003-04 - 320 – 2004-05 - 234 • Train Accidents for million kms are important indices- – 2002-03 - 0.44 – 2003-04 - 0.41 Drop in Accidents Year Collision Derailment LXAcc Fuel Misc Total m/km
1999-00 20 325 93 21 - 459 0.64
2003-04 9 199 95 14 5 320 0.41
Note: Accidents per million km is 0.29 in 2005-06.