MINING PROCESS FLOW CHART

Alumnas: Barboza Colorado, Yesenia Malca Yopla, Miriam Pozada Chomba, Beln

MINING PROCESS FLOW CHART


It is a graphical representation of the steps that are followed within a process, identifying them by symbols in accordance with their nature
Mining Contractor Fire Blast Load Trucks Haul Material Gold ore o Feed Gold Ore To Crusher o Crushed Ore To Mill Waste

Exploration Geologists

Mine Planning Engineers


Diamond Core Drilling Reverse Circulation Drilling) Surface Grab Samples Geological Mapping

Pit Optimisation Ramp Widths Wall Angles Bench Heights Gold Price Mining Costs Process Costs Admin Costs Pit Desings Ramp Widths WallAngles Bench Heights Production Targets

Mine Production Engineers Long Term Scheduling Short Term Scheduling

Resource Model

Mine Geologists Grade Control Plan & Drilling Design Ore Blocks

Drill and Blast Engineer Blast Hole Drilling Plan Blast Hole Drilling Charging of Blast Holes

Those responsible are the geologists to find new deposits. use techniques such as remote sensing, photo geology, cartography, geology, petrology, geophysics

1 Exploration Geologists
Diamond creo drilling

The diamond drilling is based on erosion or wear of geological formations or rock friction, the immediate effect of the rotation and boost pressure it is subjected to the bit or diamond crown against the rock In reverse circulation, the drilling fluid and cuttings to the surface is the interior of the linkage to a sludge pond. In this tank, the sludge is recovered for re-drilling through the annular space between the rods and drilling.

Reverse Circulation Drilling

Geological Mapping

Basic tool in which information is collected. The planning, town and country planning, building, valuing natural resources, particularly groundwater, prevention of geological hazards, geological map need fundamental basis.

2 Mine Planning Engineers


The process of mining planning must deal with the uncertainty of many of the variables associated with mining such as the occurrence of events of interference and the real capabilities of the mining productive infrastructure. Pit Optimisation Is the division of volume 3 - D in blocks of a size appropriate to give a reasonable assessment of the mineral content. main ramps wide 3.2 - 6.0 m height 3.0 - 4.0 m auxiliary ramps width 2.5 - 3.5 m height 2.5 - 3.0 m MINING COSTS The "costs of operations mining", is translated into a concept of "Spending money"; that is, measure the mining-metallurgical operations, in terms of money.
RAMP WIDTHS WALL ANGLES

It represents the inclination which is the wall of the Bank. This angle is measured from the foot of the Bank at its own crest. PROCESS COSTS refers to expenses that operation of the mineral generate either machinery, production, treatment.

BENCH HEIGHTS It means the difference in elevation between two banks.

GOLD PRICE The price of gold as a reason for the best long term investment. $1315.80 oz

Administration costs to service payroll operations include mine and plant management, equipment costs, field operations and processes, human resource management, licensing, maintenance of access roads to camps, food, systems (software and hardware) and civil security among major to be considered.

ADMIN COSTS

Pit designs Its application to define the limit of the Tagus, are represented by such important factors such as the geometric shape of the orebody, the distribution of ore within the body, the topography of the area, the maximum final batter stop according to the consistency of the rock.

Ramp Widths Wall Angles Bench Heights Production Targets: is the number of units expected to produce ore mine. is about finding new points of perforation with mineral profitable

3 Mine Production Engineers


Long Term Scheduling: These models Long Term (MLP) are used for the prediction of cash flows, such as Feasibility Studies, and include a mining sequence, estimates of laws and tons to be recovered by significant volumes but variable. Short Term Scheduling: A Short-Term Model is built to provide a basis for planning weekly daily and more commonly, that is, includes Model Control Laws, constructed to define the selection daily ore / waste.

4Mine Geologists
Grade Control Plan & Drilling Design Ore Blocks

Quality control

Laws scheduled ore, concentrate grades and tailings laws

Is break a sterile material layer in order to perform this hole then being filled with explosives and fracturing the crust.

Drilling

In designing mineral blocks can be observed with a positive sum columns (which makes us understand the value by the amount of harvested blocks and not have any interest) and then a statistical summary of the variables thrown pit by the program, these data taken to generate the financial assessment of the project and have a longer term planning feasible

5 Drill and Blast Engineer


Blast Hole Drilling Plan Blast Hole Drilling Charging of Blast Holes

Tools are formed by a mechanism of producing the effects of percussion or rotation of the auger is provided with a drill bit at its leading end. The punch is determined according to: type and size of the artwork, terrain, depth and scope of the holes, the rock or stone you want to occur.

perforaci6n mesh 3. Load Vertical hole 5. Load Horizontal hole

1. Check

2. Prime the cartridge 4. Install ANFO charger

6.Disconnect the computer

6 Mining Contractor
Fire Blast
Load Trucks The loading is to load the site mineralized material to lead to potential destinations, either the crushing, ore Stock or sterile dump. Haul Material
Removal of ore materials are sterile and electric shovels and loaders caterpillar, the materials are loaded onto trucks- dump to be taken to the block.

Gold ore
As the ore is located closer to the surface and this is extracted wide stands are built into the walls of the mine to allow access to the ore which is deeper. These steps provide paths for the vehicles of the mine.

waste
Feed Gold Ore To Crusher The ore is discharged to a machine for primary crushing, the crushed material is stored in piles or stacks on the floor before being sent to the plant where materials are separated and concentrated sterile materials of interest

Crushed Ore To Mill