Under short circuit conditions, a small core that might be adequate for metering applications would fill up and be unable to carry the magnetic flux required to transform the current. When this happens, the current transformer might be unable to induce a voltage high enough to maintain proper current flow in the secondary side. This could result in very serious errors. Protection CTs require linearity in a wide range of currents
According to IEEE standards (C57.13), current transformers are given an accuracy rating with a C or a T C indicates calculated accuracy and T indicates tested accuracy. Using this system, current transformer with rating T100 would have to be tested to verify that it could sustain a voltage of 100 volts within normal accuracy limits. C type are transformers which are constructed so that the effects of leakage fluxes on its performance are negligible, such as bushing current transformers with uniformly distributed windings.
Maximum Burden
Current transformers for relay applications are rated in the terms of the maximum secondary volts that can be induced on a twenty times short circuit rating with error of current transformation limited to 10%.
For example, a current transformer rated 5 amperes secondary current, might be given a relay accuracy rating at 200 volts (C200). This would indicate that the current transformer could sustain relaying accuracy at 100 amps as long as the secondary voltage IZ did not exceed 200 volts.
In this case, the maximum burden that could be used would be calculated as follows: Z (Burden)= E/I ( voltage rating / 20 times rated current of 5 amps) = 200 volts / 100 amps = 2 ohms (Includes wiring and relays)
Test switches provide a quick and safe means of testing relays. Test switches are especially important wherever secondary current transformer circuits may need to be temporarily reconfigured to facilitate testing or where the relay must be temporarily disconnected from service. Accidental opening of a CT secondary circuit can result in extremely high voltage and arcing, creating a dangerous hazard. Test switches eliminate this possibility by diverting the secondary current to an alternate path before opening the connection to the relay. This sequenced operation is inherent to the design of the current-shorting poles of a test switch.
Allows Access to Connections from Front of panel Assures correct testing procedure sequence (Make before break of CTs)
Bottom-line Focused
Billing and current swings Must verify performance of ITs
Accidental Opening of current transformer due to: -Blown Fuse -Accidentally disconnected leads -Defective leads -Defective equipment -Incorrect Connections -Incorrect meter mode selected
Open CT
Current goes to zero until condition is restored
Because the open circuit voltage is limited by saturation of the core, the RMS value measured by a voltmeter may not appear to be dangerous. As the current cyclically passes through zero, the rate of change of flux at current zero is not limited by saturation, and is very high indeed. This induces extremely high peaks or pulses of voltage. Voltage transients up to 15Kv could be possible.
These high peaks of voltage may not register on the conventional voltmeter, but they can break down insulation and are dangerous to personnel. Current transformers are insulated to withstand, for emergency operation, secondary peak voltages up to 3500 volts
Current Dangers
Human Reaction (at 60Hz) Perception Threshold Painful Sensation Current (milliamperes) 1 mA 3-10 mA
10 mA
30 mA 65 mA 4A 5A
A value of 1500 ohms is commonly used as the resistance from arm to arm of the human body.
Tissue Burning.
5A
OSHA says 50Vac is a hazard [1910.333(a)(1) and 1910.269(I)(1)] IEC (International Electrotechnical Commision): 30Vac Rms, 42Vac Peak, or 60Vdc
Consequences of Open CT
High voltage and shock hazard Signal discontinuity to relay and controls could lead to incorrect operations and outages. Potential magnetization of the CT leads to incorrect secondary output. This can cause error in readings, revenue metering calculations, incorrect operations long after the open CT condition is resolved.
Test Switch
Test Switch
How it works?
Detects rate of change of voltage and internal circuitry shorts CT
Test Switch
Open CT Protection
Current signal integrity to relay maintained. [Prevents incorrect operations] Voltage spikes limited to first occurrence Voltage spikes limited to 35 Volts [Eliminates Shock Hazards]
Maintains voltage to safe levels and reduces user exposure, thus increasing safety and eliminating equipment damage
Conclusions
Open CT conditions are a very likely event as more in-service testing is required Open CT condition leads to Shock Hazard, Outages Open CT could lead to incorrect readings long after condition is eliminated due to magnetization Test Switches are recommended for installation with Current Transformers Proposed test plug device eliminate risks due to operator error, incorrect equipment or risks arising due to normal testing practices and procedures.
Questions?