Design of Main Step-Down Distribution Sub-Station(MSDSS) [33/6.6 kV in relation to the projected load & voltage regulation] Design & Lay-out of above switch yard and inter linking system networking. Design of Sub-Transmission Lines (33 kV), HT Lines (6.6 kV) and LT (0.415kV) lines including conductor/cable/ supporting structures. Design of protection & control for 33 kV, 6.6 kV & 415 Volt systems.
Development of Sub Transmission-system (33 kV) is to ensure quality of supply, along with bringing down the technical losses to an optimal minimum value .
By quality power supply mean voltage regulation with in a limit laid by Grid code. Optimal use of existing network infrastructures of Transmission Utility (OPTCL) and/ or concerned Distribution licensee. Direct connectivity from Grid S/S interface for Concentrated load (Cluster points) & minimum linkage with DISCOMs network except for those isolated schemes.
Create common asset with reduced financial liability and would take care technical needs of cluster points.
Network development should be in integrated manner, so as to, conserve ROW & would meet the future loads of the MLIP- Concept of Integrated Optimal Strategy & Optimal location of MSDSS/DSS.
Cluster-XIV
Schemes: 13 Nos
[ ID (120,122,124),123, (255), (257,119),16,(127,121,258),(259,14)]
Cluster-XV
Schemes: 15Nos
Phase I- 11 Nos [ID(15,260,13),(11),(12,262),(261,10),(33,34,263)] Phase II -4 Nos * [(31),264,(32,265)]
CCA: 14,300 Ha
CCA:
*[Phase-II ( shall be linked to DISCOM Network as interim measure & shall be diverted to new 132/33 KV Grid near to Project site at TUSHURA ]
Auxiliary : 1100
TOTAL : 12,034
Auxiliary : 1398
TOTAL : 15,345
Sonepur Grid
A dedicated S/S for Ordinance Factory and have no system connectivity with local DISCOM (i.e. WESCO) network for Area supply. Grid needs system up-gradation
(13 schemes)
132/33 KV,(1x40+1x20) MVA Grid Kesinga. (1) [Located in side the Project area ( at a distance of 5 km from the nearest Scheme ID 124 & shall exclusively feed entire projected demand of Cluster XIV] (2) System augmentation proposed : 3rd 20 MVA TRF & two nos of new 33 KV Bays. (3) Cost of augmentation paid to OPTCL.
Tail-end voltage regulation of all 33 KV feeders catering to the scheme area. Tail-end voltage regulation of all 6.6 KV feeders from 33/6.6 KV Substations catering to the scheme area. Maximum demands on all 33/6.6 KV and/or 33/0.415 KV Substations and associated 6.6 KV, LT feeders. Annual energy losses in the system with the Project.
The Technical specifications of REC for procurement of equipment & materials and the construction standards of REC for erection/construction/installation shall be adopted for implementation of the Project. The implementing agency shall adhere to the conditions stipulated in relevant sections of Indian Electricity Rules under Electricity Act 2003 in regard to construction, erection and commissioning of electric supply lines (overhead and underground), systems and apparatus for low, high voltage systems and for power supply. As per REC norms, for HT over head lines, the permissible voltage regulation shall not be more than (-) 8% on the lower side. However, we prefer to adopt more conservative norms of (-) 7%, keeping into the requirement of Project. For LT lines, the permissible voltage regulation shall not be more than (-) 5%.
Nos of Scheme
Projected 33 kV, Voltage Regulation (in load (KVA) %) ACSR (100 mm2 ) AAAC (232 sq mm) 17.92
Remark
Bolangir
15
15,345
24.4
Trunk link (33 kV)-24.4 km Trunk link (33 kV) -28km Trunk link (33 kV) -13.5 km
8
Sonepur Saintala 7 15 11 Sonepur With New Grid 4 15
7,960
7,385 15,345 12,142 3,203 15,345
8.96
12.4 15.23 8.5 4.1 9.49
6.6
9.12 11.9 6.25 6.97 Trunk Line- Nil
Comfort (Voltage Regulation ) zone: (- 7%) Schemes that attributes to poor VR, may be phased in Phase-II & shall be executed in tandem with development of new Grid, or may be linked to DISCOM network subject to permissible KVA-Km criteria.
Annexture-1.xlsx
Tushar
MSDSS-9 (2 Schemes/3660VA)
AAAC
AAAC
MSDSS-10 (3 Schemes/37530KVA)
VR B: (-) 5.9%
7 km/ 100
mm2
MSDSS-8 (2schemes/13510KVA)
VR A: (-) 2.05%
MSDSS-7 (3 Schemes/2410KVA)
Dumerbahal 33 KV Feeder
Beherapali (3.15+1.6) MVA
Pvt (2x250+150+100) KVA
1 km
5km
15 km
Dumerbahal
ACSR 50,80 mm 2
Sonepur Grid
Note: Scope of work of up rating of conductor to AAAC100 mm2 from Bolangir Grid to Dumerbahal: 18 Km
Boud
Manmunda (2x1.6)MVA
17km
(2x3.15) MVA
Janapanka (1x0.630)
ID31
Redundancy (N-0)
EHT Back-up
All three Grid S/S need system augmentation including capacity addition.
Compliance with Cluster being considered an Unit, Power supply shall be at 3 , EHT (System Load exceeds 15 MVA) OERC (Condition of Supply) Code,2004
Facilitate to comply with the Planning criteria ( Voltage regulation & system loss) Facilitate Reduction in System Loss & thereby reduce anticipated Energy charges payable by the Beneficiaries. Benefit of additional power availability in the command area & enhance power reliability , quality of power supply.
New Grid
Group-I (11 schemes), that shall initially fed from nearby Saintala Grid. [ ID (15,260,13), 11, (12,262), (261,10), (33,263,34)]. Subsequently these schemes shall be pooled into new dedicated Grid to form a single source of supply for entire Cluster, for both operation & billing.
Phase II ( schemes that attribute to poor VR) Group-II (4 schemes), that shall be developed in tandem with
development of new 132/33 KV, (2x12.5) MVA Grid S/S in the project area. [ ID31,264, (32,265)] or linked to local DISCOM network.
Note: All schemes are under the jurisdiction of WESCO except (ID 31 & 32) that fall under SOUTHCO
Description
EHT Back-UP: Existing
Cluster XIV
Kesinga : 132/33 kV, (1x40+1x20) MVA Capacity augmentation : 3rd 20 MVA TRF New 33 KV Bays : 2 -
Cluster XV
Saintala : 132/33 kV, (1x10+1x12.5) MVA Capacity augmentation : 3rd 20 MVA TRF New 33 KV Bays : 2 PHASE-II Grid S/S at TUSHURA
New Sub-Station
Intra Networking: 47. 7 km Inter-Cluster link: 8.7 km Link with DISCOM: 1.4 km Total : 57.8 km
PHASE-I Intra Networking: 66.2km Link with DISCOM:12.0 km Total : 78.2km PHASE-II Intra Networking:17 Km Grand Total: 95.2 Km
18 km ( To be executed by concerned DISCOM) 13.5 km
108.7Km
Nil
17.5 km
75.3 Km
Description
Main Step-down SubStation (MSDSS) Distribution Sub-station (33/0.4kV) TRFs: 33/6.6 KV 33/0.415 KV 6.6/0.415 KV
Cluster XIV
5 nos 2 nos
Cluster XV
7 nos 1 no
8x1.6 MVA 3x630 KVA 2x630 KVA 3x630 KVA 12x100 KVA 4 nos 5 nos
9x1.6 MVA 7x630 KVA 1x630 KVA 2x630 KVA 6x100 KVA 4X200 KVA
River Crossings
1. Single line diagrams for system connectivity (SLD): 33 KV Integrated SLD (Grid S/S - 33 KV sub-transmission MSDSS). SLD for each MSDSS [Covering HT (6.6 KV & LT)]. 2. System networking for the Cluster as a whole on SoI sheet (Scale 1:100,000): Integrated map showing feeding Grid S/S (New and/or existing), 33 KV (existing and new proposed under the scheme or any other schemes), MSDSSs, HT (6.6 KV) lines. 3. Details of existing EHV sub-Station feeding the Project area: Power Transformer capacity and existing/ anticipated demand at existing 220 and 132 KV sub-stations to ensure backup capacity. (Format ESC-1) 4. Details of 33 KV feeders emanating from EHV sub-station: Section wise details of 33KV feeders with calculation of voltage regulation and energy loss. (Format ESC-2) System study Report (Load flow). 5. Details of Primary sub-stations (33/6.6 KV MSDSS) and (33/0.415 DSS) and 6.6 KV feeders: Details of MSDSS and DSS and concerned 6.6 KV feeders proposed to be fed from MSDSS along with voltage regulation and system loss. (Format ESC-3) 6. Details of augmentation of conductor size of existing 33 KV lines proposed under the Project. ( Format ESC-4). 7, Pert Chart for execution of system connectivity. 8. Technical & Guarantee Particulars (GTPs) of equipments/system elements.