You are on page 1of 26

Executive Summary[System ConnectivityOwners Study]

Cluster XIV & XV

Design of Main Step-Down Distribution Sub-Station(MSDSS) [33/6.6 kV in relation to the projected load & voltage regulation] Design & Lay-out of above switch yard and inter linking system networking. Design of Sub-Transmission Lines (33 kV), HT Lines (6.6 kV) and LT (0.415kV) lines including conductor/cable/ supporting structures. Design of protection & control for 33 kV, 6.6 kV & 415 Volt systems.

Physical Scope under System Connectivity.docx

System connectivity should be sustainable, reliable and affordable.

Development of Sub Transmission-system (33 kV) is to ensure quality of supply, along with bringing down the technical losses to an optimal minimum value .
By quality power supply mean voltage regulation with in a limit laid by Grid code. Optimal use of existing network infrastructures of Transmission Utility (OPTCL) and/ or concerned Distribution licensee. Direct connectivity from Grid S/S interface for Concentrated load (Cluster points) & minimum linkage with DISCOMs network except for those isolated schemes.

Create common asset with reduced financial liability and would take care technical needs of cluster points.
Network development should be in integrated manner, so as to, conserve ROW & would meet the future loads of the MLIP- Concept of Integrated Optimal Strategy & Optimal location of MSDSS/DSS.

Phasing of works can be done depending upon the materialization of Projects.


Compliances with OGC (Odisha Grid Code) & Distribution (Supply) Code & other relevant regulations in force.

Cluster-XIV
Schemes: 13 Nos
[ ID (120,122,124),123, (255), (257,119),16,(127,121,258),(259,14)]

Cluster-XV
Schemes: 15Nos
Phase I- 11 Nos [ID(15,260,13),(11),(12,262),(261,10),(33,34,263)] Phase II -4 Nos * [(31),264,(32,265)]

CCA: 14,300 Ha

CCA:

Phase I :15,250 Phase II : 5,900 Total: 21,150 Ha

*[Phase-II ( shall be linked to DISCOM Network as interim measure & shall be diverted to new 132/33 KV Grid near to Project site at TUSHURA ]

Cluster XIV No OF Schemes 14 [HV-9 & LV-5]


Main Drives :10,934
Load in KVA

Auxiliary : 1100

TOTAL : 12,034

Cluster XV No OF Schemes 15[HV-12 & LV-3]


Main Drives : 13947
Load in KVA

Auxiliary : 1398

TOTAL : 15,345

Sonepur Grid

Inter Cluster 33 kV Link


[ New Grid Sub-Station (2x12.5 MVA, 132/33 KV) at Tushura ] shall ultimately feed entire load of Cluster XV & part load of Cl XIV

220/132/33 Kv, 2x40 MVA Grid Bolangir

[ At radial distance of 24.4 km from nearest Scheme ID 261 , near Tuhsura]

Grid needs system augmentation.


[At a distance of 7.5 Km from nearest scheme ID 14.]

132/33 Kv, (1x10+1x12.5) MVA Grid- Saintala

A dedicated S/S for Ordinance Factory and have no system connectivity with local DISCOM (i.e. WESCO) network for Area supply. Grid needs system up-gradation

132/33 Kv,3x12.5 MVA, [ At radial distance of 28 km from Grid- Sonepur


nearest scheme ID265] Grid needs system augmentation

Project Site: Cluster XV


(15 schemes)

Project site : Cluster XIV

(13 schemes)
132/33 KV,(1x40+1x20) MVA Grid Kesinga. (1) [Located in side the Project area ( at a distance of 5 km from the nearest Scheme ID 124 & shall exclusively feed entire projected demand of Cluster XIV] (2) System augmentation proposed : 3rd 20 MVA TRF & two nos of new 33 KV Bays. (3) Cost of augmentation paid to OPTCL.

SLD for CLUSTER - XIV - Final (20.11.2012).pdf

SLD for Cluster - XV - Final - (20.11.2012).pdf

Composite SLD for CLUSTER - XIV & XV Final - (20.11.2012).pdf

Tail-end voltage regulation of all 33 KV feeders catering to the scheme area. Tail-end voltage regulation of all 6.6 KV feeders from 33/6.6 KV Substations catering to the scheme area. Maximum demands on all 33/6.6 KV and/or 33/0.415 KV Substations and associated 6.6 KV, LT feeders. Annual energy losses in the system with the Project.

The Technical specifications of REC for procurement of equipment & materials and the construction standards of REC for erection/construction/installation shall be adopted for implementation of the Project. The implementing agency shall adhere to the conditions stipulated in relevant sections of Indian Electricity Rules under Electricity Act 2003 in regard to construction, erection and commissioning of electric supply lines (overhead and underground), systems and apparatus for low, high voltage systems and for power supply. As per REC norms, for HT over head lines, the permissible voltage regulation shall not be more than (-) 8% on the lower side. However, we prefer to adopt more conservative norms of (-) 7%, keeping into the requirement of Project. For LT lines, the permissible voltage regulation shall not be more than (-) 5%.

Feeding EHT S/S

Nos of Scheme

Projected 33 kV, Voltage Regulation (in load (KVA) %) ACSR (100 mm2 ) AAAC (232 sq mm) 17.92

Remark

Bolangir

15

15,345

24.4

Trunk link (33 kV)-24.4 km Trunk link (33 kV) -28km Trunk link (33 kV) -13.5 km

8
Sonepur Saintala 7 15 11 Sonepur With New Grid 4 15

7,960
7,385 15,345 12,142 3,203 15,345

8.96
12.4 15.23 8.5 4.1 9.49

6.6
9.12 11.9 6.25 6.97 Trunk Line- Nil

Comfort (Voltage Regulation ) zone: (- 7%) Schemes that attributes to poor VR, may be phased in Phase-II & shall be executed in tandem with development of new Grid, or may be linked to DISCOM network subject to permissible KVA-Km criteria.

Annexture-1.xlsx

132/33 KV, [1x10+1x12.5) MVA, Saitala Grid S/S

Tushar

MSDSS-9 (2 Schemes/3660VA)

Feeder-2, 13.5 km/232 mm2 AAAC

Feeder-1, 15.7km/232 mm2

AAAC

10 km/232 mm2 AAAC

AAAC

9 km/232 mm2 AAAC

MSDSS-10 (3 Schemes/37530KVA)

VR B: (-) 5.9%

7 km/ 100

mm2

MSDSS-8 (2schemes/13510KVA)

7.3 km/ 100 mm2 AAAC

VR A: (-) 2.05%

MSDSS-7 (3 Schemes/2410KVA)

MSDSS-6 (560 KVA)

Dumerbahal 33 KV Feeder
Beherapali (3.15+1.6) MVA
Pvt (2x250+150+100) KVA

220/132/33 KV, [2x 40) MVA] Bolangir Grid S/S

1 km

5km

15 km

Dumerbahal

ACSR 50,80 mm 2

VR: (-) 1.5% [ with up rating of Condr. by 100mm2 ]


9.7km

Sonepur Grid

VR: (-) 2.7%


ID 264 (412 KVA)
7km

ID265, ID32 (1729 KVA)

Note: Scope of work of up rating of conductor to AAAC100 mm2 from Bolangir Grid to Dumerbahal: 18 Km

132/33 KV Boud Grid (UC) 33 kV Line from Sonepur Grid

Boud
Manmunda (2x1.6)MVA


17km

(2x3.15) MVA

Bousuni (1x1.6) MVA

Janapanka (1x0.630)

Charichaka (1x1.6) MVA

Chataranga (1x0.63) MVA

ID31

VR: (-)3.3% Kantamal (1x1.6) MVA

33KV Line From 132/33 KV Phulbani Grid

Long 33Kv Line & exceeds permitted KVA-KM Loading.

High sub-transmission losses.


33 KV System Constraints

Redundancy (N-0)

EHT Back-up

All three Grid S/S need system augmentation including capacity addition.

Compliance with Cluster being considered an Unit, Power supply shall be at 3 , EHT (System Load exceeds 15 MVA) OERC (Condition of Supply) Code,2004

Facilitate to comply with the Planning criteria ( Voltage regulation & system loss) Facilitate Reduction in System Loss & thereby reduce anticipated Energy charges payable by the Beneficiaries. Benefit of additional power availability in the command area & enhance power reliability , quality of power supply.

New Grid

Following phasing proposed: Phase-I ( schemes with out system constraints)

Group-I (11 schemes), that shall initially fed from nearby Saintala Grid. [ ID (15,260,13), 11, (12,262), (261,10), (33,263,34)]. Subsequently these schemes shall be pooled into new dedicated Grid to form a single source of supply for entire Cluster, for both operation & billing.

Phase II ( schemes that attribute to poor VR) Group-II (4 schemes), that shall be developed in tandem with
development of new 132/33 KV, (2x12.5) MVA Grid S/S in the project area. [ ID31,264, (32,265)] or linked to local DISCOM network.
Note: All schemes are under the jurisdiction of WESCO except (ID 31 & 32) that fall under SOUTHCO

Description
EHT Back-UP: Existing

Cluster XIV
Kesinga : 132/33 kV, (1x40+1x20) MVA Capacity augmentation : 3rd 20 MVA TRF New 33 KV Bays : 2 -

Cluster XV

Saintala : 132/33 kV, (1x10+1x12.5) MVA Capacity augmentation : 3rd 20 MVA TRF New 33 KV Bays : 2 PHASE-II Grid S/S at TUSHURA

New Sub-Station

Sub- Transmission Line (33 kV):

Intra Networking: 47. 7 km Inter-Cluster link: 8.7 km Link with DISCOM: 1.4 km Total : 57.8 km

PHASE-I Intra Networking: 66.2km Link with DISCOM:12.0 km Total : 78.2km PHASE-II Intra Networking:17 Km Grand Total: 95.2 Km
18 km ( To be executed by concerned DISCOM) 13.5 km
108.7Km

Up-rating of conductor ( to 100 mm2 AAAC) HT Line( 6.6 KV) :


Total Overhead Line:

Nil

17.5 km
75.3 Km

Description
Main Step-down SubStation (MSDSS) Distribution Sub-station (33/0.4kV) TRFs: 33/6.6 KV 33/0.415 KV 6.6/0.415 KV

Cluster XIV
5 nos 2 nos

Cluster XV
7 nos 1 no

8x1.6 MVA 3x630 KVA 2x630 KVA 3x630 KVA 12x100 KVA 4 nos 5 nos

9x1.6 MVA 7x630 KVA 1x630 KVA 2x630 KVA 6x100 KVA 4X200 KVA

River Crossings

Figures are tentative, subject to deviation after detailed field survey

1. Single line diagrams for system connectivity (SLD): 33 KV Integrated SLD (Grid S/S - 33 KV sub-transmission MSDSS). SLD for each MSDSS [Covering HT (6.6 KV & LT)]. 2. System networking for the Cluster as a whole on SoI sheet (Scale 1:100,000): Integrated map showing feeding Grid S/S (New and/or existing), 33 KV (existing and new proposed under the scheme or any other schemes), MSDSSs, HT (6.6 KV) lines. 3. Details of existing EHV sub-Station feeding the Project area: Power Transformer capacity and existing/ anticipated demand at existing 220 and 132 KV sub-stations to ensure backup capacity. (Format ESC-1) 4. Details of 33 KV feeders emanating from EHV sub-station: Section wise details of 33KV feeders with calculation of voltage regulation and energy loss. (Format ESC-2) System study Report (Load flow). 5. Details of Primary sub-stations (33/6.6 KV MSDSS) and (33/0.415 DSS) and 6.6 KV feeders: Details of MSDSS and DSS and concerned 6.6 KV feeders proposed to be fed from MSDSS along with voltage regulation and system loss. (Format ESC-3) 6. Details of augmentation of conductor size of existing 33 KV lines proposed under the Project. ( Format ESC-4). 7, Pert Chart for execution of system connectivity. 8. Technical & Guarantee Particulars (GTPs) of equipments/system elements.