13 - Manufacturing Resource Planning

Dr. Ron Tibben-Lembke

Historical Perspective
ERP- Enterprise Resource Planning MRP II Manufacturing Resource Planning mrp material requirements planning

MRP Crusade (1975)


Material

Requirements Planning Make sure you have enough parts when you need them
Take

future demands, factor in lead times (time phase), compare to on hand, order Determine order size and timing Control and plan purchasing vs. OSWO inventory management

Closed-Loop MRP
Capacity
Part

Consideration:

routings Calculate loads on each work station See if scheduled load exceeds capacity Lead-time long enough to allow some shuffling to make plan feasible

MRP II -- Manufacturing Resource Planning


A

method for the effective planning of all resources of a manufacturing company (APICS
def.)

Financial accounting incorporated Sales Operations Planning Simulate capacity requirements of different possible Master Production Schedules

1989, $1.2B MRPII sales in U.S., one third of total software sales

Success?

MRP Crusade Begins

Electronic Data Interchange


My

computer talks to yours, tells you exactly what I want to order, when You fill out a form, very compressed message sent, viewed as form Software, hardware expensive to implement
Sample Purchase Transaction ST88850*1 BEG*00*NE*00498765**010698 PID*X*08*MC**Large Widget P01**5*DZ*4.55*TD CTT*1 SE*1*1 Transaction Set identifier Beginning of Segment Description of Product Baseline Item Data Transaction Totals End of Segment

XML

Xtensible Markup Language

XML

provides self-describing information. Much easier, faster to implement or modify than EDI. Expected to replace EDI. Standardization through RosettaNet efforts

ERP differences
Material

planning Capacity planning Product design Information warehousing


All

functions in the entire company operate off of one common set of data Instantaneous updating, visibility

Historical Perspective

User PCs

Application Server(s)

Database Server(s)

ERP Sales
Worldwide
1995

sales of top 10 vendors

$2.8 B 1996 $4.2 B 1997 $5.8 B


Fortune

$3.2 B SAP

survey: 44% reported spending at least 4 times as much on implementation as on software

ERP Challenges
Modules
Change

assume best practices:

software to reflect company ($) Change company to follow software (?)


Accuracy
Drives

of data

entire system Ownership of / responsibility for


Ability

to follow structure

ERP Novel?
Goal-like

novel Hero learns more about ERP, deciding if it is right for his company Company rushes through installation General introduction to ERP systems, what they do, how different from MRP SAP R/3 screen shots

3 Reasons for ERP


Legacy systems outdated and need replacing anyway 2. Desire for greater communication between locations 3. Reconfigure business to take advantage of current and future communications and computing breakthroughs
1.

Why ERP?

Flexibility

High

Common Client Multiple Processes Common Client Best Practices

Multiple Clients Multiple Processes Multiple Clients Mostly Best Practices

Low

High Low Centralization

ERP Considerations
1. Control: how much centralization, drill-down visibility? 2. Structure: How large & dispersed, how tightly integrated does it need to be? 3. Database: desired structure, accessibility 4. Customization: out/in source, how willing? Ability to modify in real time. Creating in-house experts vs. continued consulting dependence 5. Best practices: how willing to embrace?
Source: Carol A. Ptak ERP: Tools, Techniques and Applications for Integrating the Supply Chain, St. Lucie Press, APICS Series on Resource Management, 1999, p. 252.

How do we
System

for organizing WIP releases

Consider

LT for each item Look at BOM to see what parts needed Release so they will arrive just as needed
Example
Order

Snow Shovel

quantity is 50 units LT is one week

MRP Table
1
Gross Requirements Scheduled receipts (begin) Projected Available Balance (ending) Net Requirements Planned Order Receipts Planned Order Releases
6 units short

2 10

40 10

50

4 54 44 44 4

MRP Table
1
Gross Requirements Scheduled receipts (begin) Projected Available Balance (ending) Net Requirements Planned Order Receipts Planned Order Releases
Order 50 units week earlier

2 10

40 10

50

4 54 44 44 4

6 50 50

Ending Inventory
1
Gross Requirements Scheduled receipts (begin) Projected Available Balance (ending) Net Requirements Planned Order Receipts Planned Order Releases
Ending inventory

2 10

40 10

50

4 54 44 44 4 44

6 50 50

Terminology
Projected

Available balance

Not on-hand (that may be greater) Tells how many will be available (in ATP sense)
Planned

order releases scheduled receipts

Only when material has been committed to their production Move to scheduled receipts as late as possible Preserves flexibility

1605 Snow Shovel


1605 Snow Shovel

314 scoop assembly

14127 Rivet (4)

048 Scoop-shaft connector

062 Nail (4) 13122 Top Handle Assy

118 Shaft (wood)

314 scoop assembly


314 scoop assembly

019 Blade (steel)

14127 Rivet (6)

2142 Scoop (aluminum)

13122 Top Handle Assembly


13122 Top Handle Assembly

11495 Welded Top handle bracket Assembly

457 Top handle (wood) 1118 Top handle Coupling (steel) 129 Top Handle Bracket (steel) 082 Nail (2)

BOM Explosion
Process
Take

of translating net requirements into components part requirements


into account existing inventories Consider also scheduled receipts

BOM Explosion Example


Need

to make 100 shovels We are responsible for handle assemblies.

13122 Top Handle Assembly


13122 Top Handle Assembly

11495 Welded Top handle bracket Assembly

457 Top handle (wood) 1118 Top handle Coupling (steel) 129 Top Handle Bracket (steel) 082 Nail (2)

Net Requirements
Part Description Top handle assy Top handle Nail (2 required) Bracket Assy Top bracket Top coupling Inv 25 22 4 27 15 39 Sch Gross Rec Req -100 25 50 --15 Net Req 75

Net Requirements
Part Description Top handle assy Top handle Nail (2 required) Bracket Assy Top bracket Top coupling Inv 25 22 4 27 15 39 Sch Rec -25 50 --15 Gross Req 100 75 150 75 Net Req 75 28 96 48

13122 Top Handle Assembly


13122 Top Handle Assembly

11495 Welded Top handle bracket Assembly

457 Top handle (wood) 1118 Top handle Coupling (steel) 129 Top Handle Bracket (steel) 082 Nail (2)

Net Requirements
Part Description Top handle assy Top handle Nail (2 required) Bracket Assy Top bracket Top coupling Sch Inv 25 22 4 27 15 39 Gross Rec Req -100 25 75 50 150 -75 -48 15 48 Net Req 75 28 96 48 33 --

Timing of Production
This

tells us how many of each we need

Doesnt

tell when to start Start as soon as possible? Dependent events (oh no, not that!) Front schedule Cutting approach Back schedule

13122 Top Handle Assy

13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

2 20

4 10

6 7 20 5

9 10 35 10

25 25

5 5 5

13122 Top Handle Assy-2


13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 5 25 25 5 5 0 5 5 20 0 0 0 20 20 35 10 0 0 0 35 10 35 10

2 20

4 10

6 7 20 5

9 10 35 10

13122 Top Handle Assy -3


13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 5 25 25 5 5 0 5 5 20 5 0 0 0 20 5 20 5 35 10 0 0 0 35 10 35 10

2 20

4 10

6 7 20 5

9 10 35 10

457 Top Handle


13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 5 25 25 5 5 0 5 5 20 5 0 0 0 20 5 20 5 35 10 0 0 0 35 10 35 10 1 2 20 3 4 10 5 6 7 20 5 8 9 10 35 10

One handle for Each assembly

LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

2 5

3 25

4 20

5 5

7 8 35 10

10

22 22

457 Top Handle

LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

2 5

3 25

4 20

5 5

7 8 35 10

10

22 22 17

457 Top Handle

LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

2 5

3 25

4 20

5 5

7 8 35 10

10

22 22 17 42

22 17 17 18 10 18 10 18 10

082 Nail (2 required)


13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 5 25 25 5 5 0 5 5 20 5 0 0 0 20 5 20 5 35 10 0 0 0 35 10 35 10 1 2 20 3 4 10 5 6 7 20 5 8 9 10 35 10

Two nails for Each assembly

LT = 1 Lot Size = 50 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

1 50 4 54

2 10

4 5 40 10

7 8 70 20

10

082 Nail (2 required)

LT = 1 Lot Size = 50 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

1 50

2 10

4 5 40 10

7 8 70 20

10

4 54 44 44

4 6 50 50

082 Nail (2 required)


LT = 1 Lot Size = 50 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 50

1 50

2 10

4 5 40 10

7 8 70 20

10

4 54 44 44

44 6 50

26 20

082 Nail (2 required)


LT = 1 Lot Size = 50 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 50

1 50

2 10

4 5 40 10

7 8 70 20

10

4 54 44 44

44 44 24 6 26 50 50

11495 Bracket Assembly


13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 5 25 25 5 5 0 5 5 20 5 0 0 0 20 5 20 5 35 10 0 0 0 35 10 35 10 1 2 20 3 4 10 5 6 7 20 5 8 9 10 35 10

One bracket for Each assembly

LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 27

10

11495 Bracket Assembly


13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 5 25 25 5 5 0 5 5 20 5 0 0 0 20 5 20 5 35 10 0 0 0 35 10 35 10 1 2 20 3 4 10 5 6 7 20 5 8 9 10 35 10

One bracket for Each assembly

LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 27

2 5

10

11495 Bracket Assembly


13122 Top handle LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 5 25 25 5 5 0 5 5 20 5 0 0 0 20 5 20 5 35 10 0 0 0 35 10 35 10 1 2 20 3 4 10 5 6 7 20 5 8 9 10 35 10

One bracket for Each assembly

LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 27

2 5

4 20

5 5

7 8 35 10

10

11495 Bracket Assembly

LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 27

2 5

4 20

5 5

7 8 35 10

10

22 22

2 3 3 35 10 35 10

35 10

129 Top Bracket


LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 3 27 22 22 2 3 3 35 10 35 10 35 10 1 2 5 3 4 20 5 5 6 7 8 35 10 9 10

LT = 1 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 15

3 3

5 6 7 35 10

10

129 Top handle bracket

LT = 1 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

3 3

5 6 7 35 10

10

15 15 15 12 12 23 10 23 10 23 10

1118 Top handle coupling


LT = 2 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 3 27 22 22 2 3 3 35 10 35 10 35 10 1 2 5 3 4 20 5 5 6 7 8 35 10 9 10

LT = 3 Safety Stock = 20 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel 39

3 3

5 6 35 10

10

1118 Top handle coupling

LT = 3 Safety Stock = 20 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

2 15

3 3

5 6 7 35 10

10

39 39 54 51 51 16 4 4 4

1118 Top handle coupling

LT = 3 Safety Stock = 20 Gross Req Sch receipts Proj. Avail Bal (ending) Net Req Pl Order Rec Pl Order Rel

2 15

3 3

5 6 7 35 10

10

39 39 54 51 51 20 20 20 20 20 20 4 10 4 4 10 10

Other considerations
Safety

stock if uncertainty in demand or supply quantity


Dont

let available go down to 0

Safety

supply

LT if uncertainty in arrival time of


order earlier than necessary

Place

Order

quantities

EOQ,

Lot-For-Lot, Periodic Order quantity, others

MRP Priorities
First:
Get

installed, part of ongoing managerial process, get users trained Understand critical linkages with other areas Achieve high levels of data integrity Link MRP with front end, engine, back end
Then:
Determine

order quantities more exactly Buffering concepts Nervousness

Ordering Policies
Dependent
Not

Demand

independent demand Discrete not continuous Lumpy may have surges


Complexity
Reduces

costs ordering & holding Anything other than lot-for-lot Increases lumpiness downstream

Assumptions
All

requirements must be available at start of period All future requirements must be met, and cant be backordered System operated on periodic basis (e.g. weekly) Requirements properly offset for LTs Parts used uniformly through a period
Use

average inventory levels for holding cost

Example Demands
Try

several lot-sizing methods

Economic Order Quantity Periodic Order Quantity Part Period Balancing Wagner Within
Order

cost = $300 per order = CP Carrying cost = $2 / unit/ week = CH

Inventory Avg

Demand = 92.1 / wk = D
1 2 3 4 5 6 7 8 9 10 11 12 10 10 15 20 70 180 250 270 230 40 0 10

Week number Requirements

EOQ
Minimizes

total ordering & holding costs Assumes demand same every period
Definitely

Economic

Lot Size:

2C P D ELS = CH
Where:
D

not always true for this use

Avg.

demand and holding cost need same time units (e.g. per week)

= avg demand C = ordering cost P


C
H

= holding cost

EOQ

Sqrt( 2 * 300 * 92.1 / 2) = 166

Week number Requirements Order Quant Begin Inv Ending Inv

1 10 166

2 10

3 15

4 20

5 70

6 7 8 9 180 250 270 230

10 40

11 0

12 10

EOQ
Week number Requirements Order Quant Begin Inv Ending Inv 1 10 166 156 146 131 111 41 2 10 3 15 4 20 5 6 7 8 9 10 70 180 250 270 230 40 166 223 270 230 166 27 0 0 0 126 126 116 11 0 12 10

166 156 146 131 111 207 250 270 230 166 126 126

Ordering cost = 6 * 300 = Inv carry cost = 1,532.5 * 2 = Total

$1,800 $3,065 $4,865

Periodic Order Quantities


EOQ
Gave

good tradeoff between ordering & holding resulted in a lot of leftovers.


Only

order enough to get through a certain number of periods no leftovers How many? EOQ / avg. demand
166

/ 92.1 = 1.805 ~ 2 weeks worth

Periodic Order Quantities


Week No. 1 Req. 10 Orders 20 Begin 20 End 10 Avg Inv

2 10 10 0 5

3 15 35 35 20 28

4 20

5 6 7 8 9 10 11 12 70 180 250 270 230 40 0 10 250 520 270 10 20 250 180 520 270 270 40 10 10 0 180 0 270 0 40 0 10 0 10 215 90 395 135 155 20 10 5

15

Ordering cost = 6 * 300 = Inv carry cost =1,082.5 * 2 = Total $3,945

$1,800 $2,145

Part Period Balancing (Least Total Cost)


Increase
Week No. 1 Req. 10

the quantity until holding costs equal the ordering cost


2 10 3 15 4 20 5 6 7 8 9 10 11 12 70 180 250 270 230 40 0 10

Order

10 holding = 10/2*2 = 10 Order 20 holding = 10 + 10*1.5*2 = $40 Order 35 = 40 + 15*2.5*2 = $115 Order 55 = 115 + 20*3.5*2 = $255 Order 125 = 255 + 70*4.5*2 = $85

Part Period Balancing


Week No. 1 Req. 10 Orders 55

2 10 0

3 15 0

4 20 0

5 6 7 8 9 10 11 12 70 180 250 270 230 40 0 10

Week 5: Order 70: Holding = 10*0.5*2 = $10 Order 250: 10 + 180*1.5*2 = $550 So I could:

Order 250 units, pay $300 in ordering and $540 holding, for a total of $840, Order 70 now, 180 next week, and pay $600 in ordering and $10 + 180*0.5*2=180 in holding = $790 Seems like the second option is best.

Part Period Balancing


Week No. 1 Req. 10 Orders 55 2 10 0 3 15 0 4 20 0 5 6 7 8 9 10 11 12 70 180 250 270 230 40 0 10 70 180 250 270

When

should we place a separate order? If 1.5*$2*D > 300. D>300/3 = 100 Whenever demand is >= 100, we might as well place a separate order. What about week 9? Order 230: holding = 230*0.5*2 = $230 Order 270: = 230 + 40*1.5*2 = $350 Order 280: = 350 + 10*3.5*2 = $420

Part Period Balancing


Week No. 1 Req. 10 Orders 55 Begin 55 End 45 2 10 0 45 35 3 15 0 35 20 4 20 0 20 0 5 6 7 8 9 10 11 12 70 180 250 270 230 40 0 10 70 180 250 270 280 0 0 0 70 180 250 270 280 50 10 10 0 0 0 0 50 10 10 0

Wagner-Within
Mathematically

optimal Work back from planning period farthest in the future Consider all possibilities:
Order

for 5, 4 and 5, 3 and 4, then 5, etc. Uses dynamic programming similar to linear programming

Simulation Experiments
What

is best under real-world conditions?


Multiple

levels to be concerned about Real-time changes