This presentation was developed by General Motors Corporation Global Purchasing Supply Chain. All rights reserved. No part of this material may be reproduced in any form, or by any method, for any purpose, without written permission of General Motors Worldwide Purchasing.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
of Significant Quality Concerns 2 Problem Solving 3 Lessons Learned Standardized Rapid Reaction to Quality Issues:
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
FAST RESPONSE
Fast Response is a system that:
- standardizes reaction to significant External/Internal Quality failures. - promotes communication and discipline through daily meetings. - utilizes a visual method of displaying important information. In preparation for the Fast Response meeting, at the start of the day, Quality shall identify significant Quality concerns from the past 24 hours which must include:
External Concerns: - Customer concerns (PRRs, Liaison Issues, Customer Calls) - Supplier concerns Internal Concerns: - Verification Station Findings - Layered Process Audit issues - Line stops and Teardown issues - Other internal Quality concerns (Dock Audits, containment activity) First Time Quality Data
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
The Fast Response meeting: Shall be held daily to review the significant Quality concerns gathered by Quality. Meetings are held daily at a minimum, although some organizations may choose to hold meetings on each shift. Is a manufacturing review meeting owned by Manufacturing and supported by Quality, Engineering, Maintenance, etc Is a communications meeting, not a problem solving meeting. It should be a 10 - 20 minute stand up meeting held on the shop floor. At the Fast Response meeting, leadership shall:
- Review Documentation for Proper Content - Obtain the next report out date for the meeting if the issue is
not closed.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
FAST RESPONSE
New issues shall be added to the Fast Response board prior to the meeting by the owner (lead contact in the case of supplier issues). Suppliers must be notified in advance when they are to report out at the meeting. Each issue shall have a Practical Problem Solving Report (PPSR) or equivalent. This form is reviewed at the meeting to provide structure for the report out and keep the meeting to its allotted time frame. Suppliers are expected to use the PPSR form or equivalent for their report out for the initial Containment phase and Root Cause-Corrective Action updates.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
FAST RESPONSE
Owner report out shall include updates to the PPSR on the following: Problem Definition Containment steps, Root Cause Analysis (5-Why) Short/Long Term Corrective Action with Verification and Lessons Learned.
Owners shall be responsible for assuring all problem solving and exit criteria are met in a timely manner. - Update the Fast Response Board status columns. - Distribute updates to team members or key contacts.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
Error Proof/Detection
PFMEA / CP Updated
Overall Status
Containment
Issue Number
1 2
Issue Description
Material Contam inated Burrs Parts m islocated on assem bly Mixed Parts Paint dots found on loose & m is-built parts Loose 7m m bolt on front cover
Date Opened
1/10/05 2/15/05
Y G R
R
G G G G
G G G G
G G G G
G G R G
G G R R
G G R G
Y G N/A G
G G G Y
3/21/05
9950560607 McIntosh
4/29/05
3/22/05
34523339
McGrath
4/29/05
3/28/05
98002222
McGrath
5/11/05
N/A
N/A
Open
3/28/05
98002222
McGrath
5/23/05
N/A
Open
EXIT CRITERIA STATUS KEY R Required but not initiated Y Initiated but not com plete G Com plete N/A Not Applicable
FR&PS NCM VS LPA EPV
Date Closed
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
Month
Year
January
2004
31 29 28 30
(Example)
22 21 13 12 2 1 3 14 4 5 23 15
24 25 17 16 6 7
26 27 19 18 8 9 20 10 11
LEGEND:
Green
No Quality Disruptions
Yellow
Internal Quality Disruption (defined locally) Customer Quality Disruption (eg. PRR, Pull, Spill)
Red
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
10
PROBLEM SOLVING
WHAT IS A PROBLEM?
A problem is the GAP between the current situation and customer satisfaction.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
11
PROBLEM SOLVING
Growing
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
12
PROBLEM SOLVING
Definition:
A structured process that identifies, analyzes, and eliminates the discrepancy between the current situation and an existing standard or expectation, and prevents recurrence of the root cause.
Shotgun Bulls-eye
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
13
Delay cause analysis until you have a thorough grasp of what is actually happening.
What is the standard? What is happening compared to what should be happening? Establish Cause/Effect relationships. Continue asking Why? until you can prevent reoccurrence of the problem by addressing its root cause.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
14
(Example)
D3
D4
D6
D7
D8
FR&PS
OI (JES)
15
D1
Select Team Use the team approach by forming a multidisciplinary problem solving team. Members should have the expertise and authority needed to solve the problem effectively. Define the Problem Part 1 represents what the customer actually said; Part 2 represents what the engineer or expert says relative to the problem. Containment Interim Actions (quick fix) that prevent the problem from getting to the customer. Identify the Root Cause Define all the events that produced the problem. Use a systematic procedure to identify and verify the root cause: DOE, Fishbone Chart, Drill Deep Analysis, 7 Diamonds (Include Blue Card).
NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
D2
D3 D4
FR&PS
16
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
17
Observation: Go Back to 2
Can See
5
Grasp The Situation
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
18
7 DIAMOND PROCESS
Problem Identified
Begin Interrogation
(Example)
Responsibility
Responsibility
Production 1
No
Production 2
Design Release 6
Uncertain
Production 3
Parts Quality? No
Statistical Engineering 7
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
19
Diamonds 1 - 4
Used to determine if production is running the manufacturing process to design intent.
Diamonds 1-4 evaluate the stability of the process. Once a problem has been identified, the automatic response must be to immediately perform diamonds 1-4.
20
1 - Correct Process
Manufacturing Corrects
(Example)
Manufacturing
Correct Tool?
Manufacturing
Correct Part?
Parts Quality?
Is Standardized Work being followed? Are build documents being adhered to (if applicable)? Are gaging requirements / frequencies being adhered to? Is the job being done the same on all shifts? Does the operator understand what the product standards are? Is it the regular operator? Has there been a lot of turnover on the job? Has the operator been properly trained? Are the visual aids current? Does the operator understand the quality outcomes of her/his job? Does the operator know how to communicate when he/she has a problem?
LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
FR&PS
NCM
VS
21
2 - Correct Tool
Manufacturing
(Example)
Correct Process?
Manufacturing Corrects
Correct Tool?
Manufacturing
Correct Part?
Parts Quality?
Can any of these cause the problem? Are the correct tools & fixtures being used? (all shifts) Are the tools set to the specified requirements? Are they properly calibrated? Are both shifts using the same tool? Are the tools worn? Do the tools & fixtures have mutilation protection? Has the workstation been error proofed? Have the tools or error proofing been bypassed? Does the workstation layout allow the operator to work effectively? Has the Preventive Maintenance been done? (check log) Are tools functioning correctly?
LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
FR&PS
NCM
VS
22
3 - Correct Part
Manufacturing
(Example)
Manufacturing
Correct Tool?
Is the parts routing current? Are the correct parts being used? Are parts stocked in the correct location? Do the part numbers on the boxes agree with their location? Is error proofing needed? Is existing error proofing device working correctly?
Manufacturing Corrects
Correct Part?
Parts Quality?
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
23
4 - Part Quality
Manufacturing
(Example)
Correct Process?
Quality Systems is responsible for determining if parts have changed and overall part quality: Supplier Data CMM Checks Fixture Checks Visual Part to Part Visual Lot to Lot If parts quality (out of specification) is determined to be the problems root cause, then Quality Systems will notify manufacturing and/or the supplier that there is a problem and work with manufacturing and/or the supplier to validate the corrections.
Manufacturing
Correct Tool?
Manufacturing
Correct Part?
Parts Quality?
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
24
COUNTERMEASURE CARD
Card #
__________
Date: ______________ Initiated by: _________________ Dept: ______________ Phone: _____________________ Part Name __________________ Part # ________________ Model ______________________ Unit # ________________
Referred to: ________________________ (SQA or SQE, 4) Referred to: ________________________ (Quality Engineer, 5A) Referred to: ________________________ (Red X, 5B) Referred to: _________________________ (Engineering, 6) Referred to: _________________________ (other)
(Example)
Assigned to ___________________
Date ______________ Yes No Additional Information: __________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________
1
2 3 4
Standardized Work Followed? Correct Tools / Fixtures / Error Proofing? Correct Parts? Parts in spec?
Yes
No
Standardized Work Followed? Correct Tools / Fixtures / Error Proofing? Correct Parts? Parts in spec?
2
3 4
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
25
26
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
27
(Example)
Pareto Chart
Problem
Histogram
Problem
5 Whys
Why Why Why Why Why Root Cause
Run Chart
Scatter Plot
Control Chart
Pictograph
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
28
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
29
(Example)
30
(Example)
5 Whys Enter the technical root cause. Ask WHY until actual root cause for each is determined.
Prevent Why did the manufacturing process not prevent the defect? Protect Why did the Quality process not protect the customer (GM) from the defect? Predict Why did the planning process not predict the failure?
Drill Deep Why did the Manufacturing System not prevent this Failure Mode M2
**************** **************** ** **************** **************** ** Manufacturing System Error Proofing & **************** Standardized Work **************** **
Corrective Action
Verification
Owner
Due Date
M1
M3
Prevent
M4
M5
Quality Assurance
Why did the Quality System not Protect GM from this Failure Mode
M-RC
Q1
Q2
**************** **************** ** **************** **************** Quality System ** Error Detection & **************** Containment **************** **
Protect
Q3
Q4
Q5
Quality Control
Why did the Planning System not Predict this Failure Mode
Q-RC
P1
P2
**************** **************** ** **************** **************** Planning System ** informational content **************** in all documentation **************** **
Predict
P3
P4
P5
Quality Planning
What are the key findings based on this quality issue?
P-RC
B
**************** **************** **
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
31
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
32
Send a copy of this Problem Solving Report to other Departments/Plants with similar potential problem.
Implement the solution across the organization. Update the necessary documentation: PFMEA Control Plan Error Proofing Verification* Standardized Work * Operator Instructions* Lessons Learned*
33
(Example)
SYMBOL & STATUS KEY:
Original location Location with similar process Completed & 3rd Party/GM verified Completed & Supplier verified only Not Completed Pass Through Tiered Supplier NA Not Applicable
A.P.Q.P.
Duns / Location
Duns/Sub-tier classification
Duns 1
Duns 2
Duns 3
Duns 4
Duns 5
Duns 6
Tier 2
Tier 3
GM Plant
FAILURE MODE
N/C or CPV
CS Status
Champion
Symbols
GM Plant
FAILURE MODE
N/C or CPV
CS Status
Corrective Action
Champion
Symbols
GM Plant
FAILURE MODE
N/C or CPV
CS Status
Corrective Action
Champion
Symbols
Drill Wide - analysis of opportunities of system deficiencies and corrective actions that encompass all GM parts, manufacturing processes, and other plant locations.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
34
Corrective Action
Tier 4
D5
D6
Permanent Corrective Action Identify and implement permanent corrective actions that will eliminate the problem. Remember that permanent means forever. The problem should never be able to occur again. Verify Effectiveness of Action Verification takes place in these four areas: Root Cause, Interim Actions, Permanent Actions, Prevention. Verify the implemented action does eliminate the problem (short term, long term and other similar processes) and does not cause any other problems. Prevent Recurrence (Institutionalize) Preventing recurrence means preventing changes to the part, process or system that allow a problem to occur. Prevention covers all similar and related processes, designs, systems, etc. Congratulate Your Team Recognize the contributions of all the team members as a group and individually.
D7 D8
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
35
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
36
LESSONS LEARNED
A Lessons Learned system: establishes a process for capturing information that will support continual improvement to all operations/processes.
37
LESSONS LEARNED
Lessons Learned may be identified by anyone. Most activities within an organization result in prevention of future problems or improving performance. These activities build Lessons Learned.
Examples of activities to Identify Lessons Learned:
FR&PS
GM Drill Wide Matrix Monthly Q-Charts Layered Process Audits Error Proofing Verification Internal Quality Issues Verification Stations APQP Process Continuous Improvement Teams Problem Solving (PR/Rs, Risk Reduction) Management Reviews Suggestion Programs
NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
38
LESSONS LEARNED
Lessons Learned shall be documented. Documentation may include: Lessons Learned Form APQP Checklist PFMEA Computer Form or Website, etc
Lessons Learned must be communicated and kept available to all current and potential users. Communication can be performed by: posting the lessons learned form including on a lessons learned website utilizing a company newspaper or closed circuit tv distribution of pocket cards, etc Leadership should review the Lessons Learned process to assure Implementation.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
39
Issues are tracked on the Fast Response Tracking Board. Owners are required to give periodic updates at Fast Response meeting.
Owner responsible for completion of all exit criteria including Lessons Learned. Results of Problem Solving process communicated. Fast Response Tracking Board indicates exit criteria is green.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
40
FAST RESPONSE
BENEFITS:
Improves Quality metrics: reduces PPM and warranty costs. Reduces PRRs and increases customer satisfaction. Provides a systematic approach for Problem Solving* and communication of Quality issues. Reduces recurrence of Quality issues. Assures all issues are resolved. Supports continual improvement. Strengthens documented implementation of Lessons Learned** database. Prevents repetitive mistakes and reduces waste of resources. Transfers knowledge to all stakeholders in an organization. Provides a history of activities.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
41
A PPSR form or equivalent shall be completed for all Fast Response board issues.
Owners shall perform updates at the Fast Response meeting, assure problem solving is performed and all exit criteria are completed. Display daily Quality status.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
42
continued
Have a defined process for Problem Solving leading to root cause identification and elimination.
Use the Problem Solving format prescribed by the customer. (GM GP5) Empower everyone in the organization to participate in Lessons Learned. Establish and institutionalize a system to document Lessons Learned. Establish a disciplined approach to problem prevention using Lessons Learned.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
43
Communication
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
44
45
DO NOT USE
Risk Reduct
Contam
SCM
46
Nonconforming product shall be prevented from unintended use or installation through containment. Leadership must develop, organize and maintain a system for control of nonconforming product.
SEGREGATION AREAS:
Segregation areas shall be foot printed or otherwise identified. Example: Scrap bins Rework Tables Containment areas Nonconforming material hold areas
Containment shall verify breakpoint: - using 100% Inspection - for a duration specified by site leadership
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
47
Nonconforming product shall be prevented from unintended use or installation through containment. Leadership must develop, organize and maintain a system for control of nonconforming product. All nonconforming and suspect product shall be segregated.
BREAK POINT:
Only give a break point after you understand the DEFECT and have contained all nonconforming product.
REMEMBER:
Violating the BREAKPOINT is the biggest mistake you can make.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
48
- Red = Nonconforming product - Yellow = Suspect product - Green = After breakpoint conforming product
Containment activity and tasks must be customer approved with supporting documentation: - work instructions - referenced in control plan - operator training records
49
Process & authority for releasing product out of rework, repair and containment areas shall be defined. Follow a documented containment procedure to prevent identified defects from flowing to the next customer. Containment procedure requirements: Define quality standards which are clear and measurable Document containment methods in standardized work (e.g. JES) Specify start/stop date on document (short term activity should be as short as possible) Track and document results to verify effectiveness (i.e. Temporary Verification Station) Initiate the problem solving process Containment Worksheet shall be used and completed to: - Provide a systematic approach to containing all suspect product. - Identify all areas to be checked for nonconforming product.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
50
CONTAINMENT WORKSHEET
DEPARTMENT:
CONTAINMENT WORKSHEET
DEPARTMENT CONTAINMENT OWNER:
(Example)
DATE:
(Example )
1/6/2003
Laboratory
PRODUCT NAME / NUMBER: PRODUCT NONCONFORMANCE:
G. Hall 10066044
Burr on flange
PRODUCT CONTAINMENT SCOPE
IDENTIFY ALL AREAS WHERE SUSPECT PRODUCT COULD BE LOCATED LOCATION POTENTIAL QTY. AREA VERIFIED SUSPECT PROD. FOUND? QTY? VERIFICATION RESPONSIBILITY
Receiving Laboratory WIP Storage Areas Outside Processing - (Plating) Scrap Bins Rework Areas Shipping Dock Heat T reater At Customer In T ransit Service Parts Operations
P.S. K.C. P.S. C.J. K.C. B.T. K.C. P.S. B.T. B.T. P.S.
P. Smith T. Brown P. Smith C. Jones C. Jones C. Jones C. Jones C. Jones C. Jones C. Jones C. Jones C. Jones
TOTAL FOUND
SEGREGATE SUSPECT PRODUCT TO (location, as feasible): 2548 pcs to Containment Area SORT METHOD (eg. visual, gage, mating part): Visual for burrs SORT CRITERIA (clear pass / fail standards): Max Burr per standard I.D. METHOD CONFORMING (eg. mark, tag, sign): White paint dot near defect area I.D. METHOD NONCONFORMING (eg. mark, tag, sign): Mark defect with red paint.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
51
(Example )
Customer Feedback
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
52
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
53
54
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
55
No
Certify parts that will be shipped.
Yes!
Contact : Assembly Plants Service Parts (SPO), Tiered Suppliers as required.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
56
Quality issues can be: Supplier initiated. Issues found by external customer.
Initiate containment actions immediately at all infected locations! Begin Fast Response* process problem solving efforts.
Is there a concern with the certification procedure or has suspect stock been shipped? If YES to either question, contact customer immediately! If NO, then begin to ship certified stock.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
57
Needs to be a live conversation no voice or email. A phone list for contacts is established. Establish conference calls when required by customer. A supplier executive acts as lead and single point for communication. All stakeholders including Tier suppliers participate in calls.
GM Contacts
(Example)
Phone
GM SQ Mgmt Team
Name
Initial contact must be made with at least one person at each affected facility. Responsibility E-mail
GM EngineerTeam
Name
Responsibility
Phone
Name
PHONE
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
58
Initiate at customer locations with appropriate sort instructions. A Customer should be informed of the following items: Certification method. Description and picture(s) of the marked parts. Description and picture(s) of any marked or added labels. Identify parts/labels. Begin to ship certified stock. Notify customer of breakpoints.
CERTIFIED STOCK SHIPMENTS
(Example)
Arrival Date Time Carrier Tracking number Quantity
Carrier
Tracking number
Quantity
Date
Ship Time
Flint 880
Toluca
Pontiac
Mishawaka
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
59
Work through problem solving process. Continue Fast Response* & Close Issue Implement Verification Station* and Layered Process Audit*
Continue to follow customers notification process requirements. The organizations nonconformance alert notification and containment process includes communication and actions for all stakeholders: Customer(s) Tier-2s, etc. Internal stakeholders
The process should include closing the loop with permanent resolution and issue closure. Problem Solving* Lessons Learned*
60
A nonconformance alert and containment procedure shall establish the timeline, tasks and communications necessary to meet customer requirements.
Quality issue notification Concern with certification or was suspect stock shipped?
(Example) (GP 5)
N
Begin shipping certified stock.
Y
Contact external customer.
Develop & implement external containment and certification plans. Continue Fast Response* & Close Issue.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
61
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
62
63
Do not
a Defect!
64
VERIFICATION STATIONS
Definition: The system of building quality in station through prevention, detection, and containment of abnormalities.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
65
66
67
Prevents the flow of quality discrepancies beyond the VS by detecting and resolving issues immediately
Discrepancies identified for correction Data Drives Teams in Problem Solving Process with Leadership Support Management Process Verification, Review of Practical Problem Solving VS is calibrated by downstream data
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
68
69
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
70
(Example)
Defects Entering VS Inspection of product Prioritizing of defects Alarm Escalation Process Immediate Responses Leadership facilitates a meeting every shift Meeting Assignments Pareto Analysis Problem Solving Driving fixes into station - BIQ Weekly problem solving mtgs. Select new problems based on pareto analysis All attendees must sign in on the board
Defects Leaving VS Station Customer PR&R Status Customer nightly LIAISON letter status Dock Audit/Containment/Field Rep-Liaison Issues FTQ & SCRAP Trend Charts (over time)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
71
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
72
ALARM LIMITS
Alarm limits are set based on type and number of defect found. Alarm limits can be divided into two groups PR&R type defect, and High frequency low severity type defects.
1
Variable based on: Need, process, situation
SCOPE OF CHANGING ALARM LIMITS Alarm limits are changed when there is: An intentional, permanent change in the actual process. A special cause variation, where despite our best efforts to discover the cause we are unable to make the correction and problem solving efforts have been escalated.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
73
records the number of each type of problem by the hour. addresses special cause variation. alerts operator when alarm limit is reached. is located at or near the point of inspection.
1st Hour 2nd Hour 3rd Hour 4th Hour 9:00-10:00 7:00-8:00 5th Hour 8:00-9:00 6th Hour 7th Hour 1:00-2:00
(Example)
8th Hour 2:00-3:00 1:00-2:00
#
1 2 3 4
VS Alarm 6:00-7:00 Trigger 7:00-8:00 8:00-9:00 an Alarm! Trigger # 4:00-5:00 5:00-6:00 6:00-7:00 Scratches 6 ll l ll Bolt Reject 1 l l Lash Reject 4 ll l Crank Torque 5 ll lll l
Defects
10:00-11:00 12:00-1:00
Total 5 4 3 6
11:00-12:00 12:00-1:00
Trigger an Alarm
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
74
Re sp
ca la t ion
se on
If problems continue, the problem solving process will be initiated to determine root cause and apply effective countermeasures.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
Es
75
(Example )
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
76
The alarm process directs the support functions to: Go and See the problem Apply containment to prevent further flow of defects Initiate problem solving
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
77
The Break Point is the point at which all subsequent parts are known to be good due to containment and/or corrective action having taken place. Both time and location should be recorded. First good part must be identified so the Verification Station knows when the Break Point passes.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
78
Definition: The communication of quality expectations and results between customers and suppliers through standardized communication pathways. Purpose: To ensure that information on quality reaches those who need it.
Process A (Suppliers)
Process B you
Process C (Customer)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
79
How do we Know that the Verification Station is doing its job and driving Quality into Station??????
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
80
Issues that escaped to the Customer and are caught by the Supplier contact
(Example Issues that escaped to ) Any issues the customer and are escaped the caught by the to customer Customer
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
81
(Example ) Any issues escaped and caught by the GP-12 / CS-1 / CS-2
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
82
3/8/2005
Signature
John Smith Mary Jones Anne Miller Marty Morris Ray Roberts
(Example )
Management Walk Through/Meeting shall be done daily at selected Verification Stations. Sign in sheet indicates presence at Management Walk - Through/Daily Meetings.
Yes
What were the problem(s)?
No
Are there any resources that need to be re-assigned?
No
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
83
(Example )
As issues come up at the daily VS or weekly PPSR meeting, any assignments given are captured here and reviewed at next meeting
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
84
(Example )
At the Weekly Problem Solving Review Meeting, Assigned Practical Problem Solving Issues are captured and tracked here.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
85
C.A.R.E.
CUSTOMER ACCEPTANCE REVIEW & EVALUATION
Protects your customer from non-conforming product, discrepancies and labeling errors. Verifies that process controls are effective. Applies to customer satisfaction items that are part related. Pass Through Characteristics Labeling Past Formal Customer Issues The Plant Manager & Quality Manager should facilitate activities. The Alarm Limit is Always ONE! Report Non-Conforming Data to the Fast Response Meeting. Add the Root Cause/Corrective Action to the Layered Process Audit.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
86
GP-12
A process of documenting the organizations efforts to verify control of its processes during start-up, acceleration, and process/part changes.
Assures any quality issues that may arise are quickly identified, contained and corrected at the organizations location and not at the customers receiving location.
Identifies high risk operations providing opportunities for continual improvement. A Verification Station with an alarm limit of 1. Note: Use GP-12 data and other information to determine placement of other Verification Stations.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
87
PROCESS DIAGRAM
(Example)
OP 10
OP 20
VS
OP 50 CARE
OP 40 GP-12
OP 30
88
Implement at least one Verification Station. Note: GMPT suppliers shall implement C.A.R.E.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
89
Do not
a Defect!
90
STANDARDIZED OPERATIONS
WORKPLACE ORGANIZATION-5S
A clean, well-organized work environment.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
91
ELIMINATION OF WASTE
It is everyone's responsibility to promote and participate in a continuous improvement culture within their daily activities. Continuous Improvement is an ongoing process it has no end as we can always improve. Even when a process is stable, and Business Plan requirements have been met, we should look for further ways to improve.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
92
ELIMINATION OF WASTE
Traditional Thinking
Obvious Waste
Hidden Waste
FR&PS NCM VS LPA EPV WPO SWI (SOS)
Reactive Improvement
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
93
ELIMINATION OF WASTE
QSB Thinking
Obvious Waste
Hidden Waste
FR&PS NCM VS LPA EPV WPO SWI (SOS)
Continuous improvement
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
94
Elimination of Waste
Enemy #1: Waste
Before we can understand the concept of waste, we need to be able to differentiate between non-value added and value added work.
is any step that is unnecessary in carrying out the job. It includes things like waiting, rearranging materials, looking for things, and unnecessary walking.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
95
WASTE - OVERBURDEN
Enemy #2: Overburden
Overburden occurs when Team Members, machines, or equipment are pushed beyond the natural limit of their capacity. When machines are overburdened: We run the risk of causing safety hazards, equipment breakdowns and manufacturing defects. When team members are overburdened: The safety of the team or team member can be endangered.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
96
WASTE UNEVENNESS
Enemy #3: Unevenness
Time
Overburden!! Unevenness can occur in: Takt Time 430 5 production Balanced Wait Time! parts flow 4 Balanced! equipment usage 3 work done by team members Cycle Time Cycle Time Cycle Time 520 245 425 information flow 2 Team Member Team Member Team Member A B C material delivery, causing shortages 1 or overstock
Unevenness between work loads must be eliminated. To balance the line effectively team members cycles time must match the takt time. One team members cycle time should be close or equal to the other team members cycle time -- in other words, the cycle times are even. If the jobs in a team take different times to complete, then everyone has to wait until the longest jobs are finished. In this case, unevenness in cycle time causes the waste of waiting.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
97
ELIMINATION OF WASTE
COMMWIP
Processing Correction
Overproduction
Waiting
Material Movement
Motion
There are three enemies that exist which prevent us from reaching our goals! Our main objective through Continuous Improvement is to eliminate these three enemies.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
98
CORRECTION
Definition: Doing something over which requires additional motion, additional processing, additional inventory and/or waiting. All repair activities are opportunities to eliminate waste.
P I W M
C O M
TYPES OF WASTE
Characteristics: Additional resources required to repair, reactive organization. Main Causes: Poor training, inadequate tools, large inventory.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
99
OVERPRODUCTION
P
I W M
Characteristics: Large inventory within the process, busy areas, large movement of parts and people, increased staffing and energy costs. Main Causes: Unbalanced operations, lack of communication, high equipment downtime.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
C O
TYPES OF WASTE
Definition: Generating excess parts, information, etc., too soon or too fast in a process. The waste of overproduction often causes other forms of waste.
100
MOTION
P
C
O M
I
W
TYPES OF WASTE
Definition: Unnecessary work movements by a team member or machine which is not necessary in adding value to the product.
Characteristics: Extra walking, excessive use of force, excess handling. Main Causes: Worksite poorly laid out or standardized work sequence not properly planned or followed.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
101
MATERIAL MOVEMENT
P I W M C O M
Definition: Unnecessary transporting, storing or rearranging of items, parts, equipment, etc. which is not required for production.
TYPES OF WASTE
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
102
WAITING
P I W M C O M
Definition: To remain in one place while doing something other than what is related to the task at hand. It is an unproductive use of time as it adds no value to the process.
TYPES OF WASTE
Characteristics: Worker waiting for a machine or another worker. Waiting for people, information or meetings to start on time is waste. Main Causes: Operations not balanced, broken equipment.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
103
INVENTORY
P I C
TYPES OF WASTE
O
M
W
M
Definition: Too much of anything which may take up space, lead to obsolescence, impact safety, cause waste of motion or waste of material movement.
Characteristics: Large receiving docks, extra bins, racks and fork trucks. Main Causes: Unlevel scheduling, no pull system, too many material storage areas.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
104
PROCESSING
P I W M C O M
Definition: Doing something the customer does not perceive as adding value to the product.
TYPES OF WASTE
Characteristics: Clicking a torque wrench twice when one is sufficient by the quality standards, polishing the underside of a hood, mixed pallets. Main Causes: Lack of standards, no existing or inefficient procedures.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
105
Concrete Thinking
Processing Correction
Inventory
WASTE
+ Overburden Unevenness
OverProduction
Motion
Waste Is "Tangible" Identify Many Small Opportunities Leads To Large Overall Change Continuous Improvement Note: The memory aid for the 7 Types of Waste is COMMWIP.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
106
FIRST IMPRESSIONS
You never get a second chance to create a first impression.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
107
108
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
109
WORKPLACE ORGANIZATION
Workplace Organization encompasses a systematic approach to ensure:
work areas are organized for safety, quality, ergonomics and optimal use. only required and regularly used equipment, tools and materials are present in the work area. work areas are controlled using visual management. product and information flow is easily understood. housekeeping is defined by work area instructions. regular management reviews (Layered Process Audits*) are performed. waste elimination and continual improvement. a clean, bright workplace. Good Workplace Organization establishes a standard that leads to the Identification & Elimination of Waste.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
110
5 S WORKPLACE ORGANIZATION
STEP ORIGINAL 5S OTHER 5 S TERMINOLOGY QSB DEFINITION
Determine the purpose of the area and remove all unnecessary items from the workplace.
PURPOSE
To prepare the workplace for the next 4 steps and to eliminate items that could cause injury, excessive cost, or any of the forms of wastes. To eliminate many of the forms of waste (such as correction & motion) and make items readily available to the user. To eliminate unsafe conditions, improve quality of our products, enhance the workplace environment, identify and correct equipment problems (cleaning is checking), and initiate corrective action to prevent future accumulation of unwanted materials. To allow for quick, easy, and effective maintenance of the workplace organization process.
Seiri
Organization
Sift
Tidiness
Clear
Sort
Seiton
Neatness
Sort
Orderliness
Organize
Straighten
Identify the best location for all required items in the workplace.
Seiso
Cleaning
Sweep
Cleanliness
Clean
Shine
To become aware of and eliminate all unwanted dirt, dust, grime, paint, labels, tape, etc
Seiketsu
Standardization
Sustain
Standardization Standardize
The standardization required to Standardize maintain the steps of work place organization.
Shitsuke
Discipline
Self-Discipline
Discipline
Continuous Improvement
Sustain
The system designed to sustain and support continuous To assure continuous improvement of workplace growth of this process. organization.
Workplace Organization is applicable to all types of environments (i.e. offices, conference rooms, tool cribs, operator workstations, team/group rooms, etc.).
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
111
Before
- Equipment
- Tools - Inventory/Storage - Personal items
Sort and Tag: - Place a green tag on any item in regular use. - Place a red tag on any item which isnt used or is not in working condition. - Place a yellow tag on any item that use or condition isnt known for sure.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
112
After
113
S-3: SHINE - Eliminate the source of dirt and leaks (oil, air, water, etc).
Clean machines, tools, floors, cabinets. Develop instructions for cleaning methods and frequency. Organize for cleaning (correct materials, rags, brooms, etc.). Find ways to reduce the time required for cleaning.
(Examples)
Before
After
114
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
115
S-4: STANDARDIZE
(CONTINUED)
Determine cleaning schedule and methods. Standardize cabinet organization. Define a simple method to identify problems using visual controls.
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
116
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
117
A well organized workplace is the best place to visualize your Standardized Work work flow, operator movement, time, etc.
FLOOR LAYOUT
Before
Insp
(Example)
FIRE EXT.
LATHE
Back up CNC Back up Broach
Dept. 816
LATHE
After
R000987654 F1234567890
RAW
Insp
FIN
BROACH
SCRAP
4 3
BROACH
CNC
CNC
Dept. 816
FIRE EXT.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
118
(Example)
Item Notes for Next Score Level of (0-5) Improvement
Item No.
1 2 3 4 5
Description
Removing Unnecessary Items Storage of cleaning
All items not necessary to performing work are removed from the workplace; only tools & products are present at work All cleaning equipment is stored in a neat matter ; handy & easily available when needed. All floors are clean and free of debris, oil & dirt. Cleaning of Floor cleaning floors is done routinely - - daily at a minimum. No outdated, torn or soiled announcements are displayed. All Bulletin boards bulletins are arranged ina straight and neat manner. Fire hoses and emergency equipment are unobstructed & Emergency Access stored in a prominent easy-to-locatemanner. Stop switches & breakers are marked or color-coded for easy visibility. Work-in-process, tools & any other material are not left to sit directly on the floor. Large items such as tote bins are Items on floor positioned on the glance; lines are straight and at right angles with no chipped or soiled paint. Aisles & walkways are clearly delineated and can be Aislewys - marking identified at a glance; lines are staight and at right angles with no chipped or soiled paint. Aisles are always free of material & obstructions: nothing is Aislewys ever placed on the lines & objects are always placed at right maintenance angles to the aisle lines. Storage of boxed, containers & material is always neat at Storage & right angles. When items are stacked, they are never crooked arrangement or in danger of toppling over.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
119
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
120
WE NEED A HOME.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
121
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
122
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
123
STANDARDIZED WORK
Definition: The document of work functions performed in a repeatable sequence, which are agreed to, developed, followed, and maintained by the functional organization.
Purpose: To establish a repeatable, predictable baseline for continuous improvement and to involve the operator in both the initial and ongoing improvements to achieve the highest levels of safety, quality and productivity.
SOT(JIT) Risk Reduct Contam SCM
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
124
STANDARDIZED WORK
Standardized work is used when there is a definable, repeatable process.
Production
Repair Work
Materials
Different Suppliers May refer to Standardized work as: Job Instructions, Work Instructions, Method Sheets, Operator Instructions, LBS & Pad sheets
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
125
ORGANIZATIONAL FOCUS
Team Member
Team Member
Roles in Standardized Work
Team Leader
Group Leader
Participate in developing Standardized Work (SW) & contribute ideas Suggest improvements to SW Provide feedback to Team Leader on SW Use SW as the basis for problem solving & training Follow Standardized Work
The function of everyone, including the Support Staffs, is to support production Team Members.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
126
STANDARDIZED WORK
STANDARDIZED WORK PROVIDES A FOUNDATION FOR: Ensuring operators are consistently performing the same tasks and procedures. An efficient production sequence. Reduced variation within a process. Waste reduction, problem solving and quality control. Identifying value added tasks. Continual improvement. A lean organization. Auditing operator conformance to work instructions (Layered Process Audit*).
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
127
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
128
129
Impacted and new employees shall be trained in the use of Standardized Work (Standard Operator Training*).
Multi-disciplinary team(s) shall continuously develop and improve Standardized Work.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
130
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
131
(Example)
CUSTOMER CYCLE TIME:________________ OPERATOR CYCLE TIME:_______________
WORK ELEMENT
HAND WORK
MACHINE
PROCESS STOCK
QUALITY CHECK
Standardized Operation Sheet Includes: - Work Elements - Element Times - Work Flow - Sequence - Standard in-process stock - Operation Cycle Time - Takt Time Customer and Actual
TOTAL
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
132
ELEMENT DEFINITION
A work element is a logical grouping of actions that advances work to its successful completion
Elements are the basic building blocks of SW. They are used during training to teach the job in manageable chunks.
Work Sequence Agreed upon order in which work is done to maximize safety, quality, and efficiency.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
133
WORK ELEMENTS
(Example)
Any Job can be broken down into job elements. . .
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
134
Time required to complete the element Walking is not an element, and usually not included in element sheets. The first element in any job can be, read manifest and get parts. Dont automatically use the groupings as described in your current engineering Standardized Work. Use common sense to break the job down the way you think of it every day.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
135
TAKT TIME
Total available Production Time per shift/day: MINUS Breaks and Lunches
Definition: The maximum time available to produce a product or service based on customer demand.
Formula:
TT =
GM Assembly Plant DEMAND in pieces per shift/day Production Time Available Per Period Customer Demand Per Period
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
136
WORK ELEMENT
Customer Takt Time is 60 Seconds Torque down the Four Screws Get and hand Start Four screws Get & Place Speaker Grill on Door
20 Seconds
(Example)
20 Seconds
20 Seconds
20 Seconds
20 Seconds
20 Seconds
Third Person
Contam SCM
137
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
138
ELEMENT TIME
Time Required to Complete the Element: A rough guideline could be to set element size to about 10% of the job (ATT) .
(Example)
60 6 11 6 10 12 6 6
5 4 3 2 1
Options
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
139
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
140
CYCLE TIME
Time
60
50
40 30
Cycle Time 52
Definition: The actual time it takes a team member to complete his or her work sequence.
0
Team Member A
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
141
WORK FLOW
Add team member work path to the layout
FR&PS
NCM
VS
LPA
EPV
WPO
142
WORK FLOW
Pierce
Roller
Washer Vaner
3
A
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
143
CLASS EXERCISE
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
144
STANDARDIZED WORK
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
145
STANDARDIZED WORK
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
146
(Example)
PROCESS NAME:
TC Cover Line
ELEMENT TIME
WORK ELEMENTS
Load Coil (Time to load each coil)
HAND
MACHINE
WALK
DIAGRAM
QUALITY CHECK
SAFETY
ERGO
IN PROCESS STOCK
NO.
OPERATOR
1 3
2.0
Manual index press to set travel Adjust travel Run first piece Quality checks per operator instructions Run press in manual mode Check first 5 pieces per operator instructions Set press to auto Run press Gage 2pieces/press/hour from hold bin Place finished product from hold station into gondola Tag full gondola with internal move tag Notify fork lift driver to move full gondola to shipping dept. Move empty gondola into position (remove all tags/labels) Repeat all steps in set-up, gage, inspect and run on all 3 presses
6.0 2.0 16.0 6.0 3.0 3.0 12.0 2.0 40.0 2.0 2.0 6.0 5.0 2.0 22.0 15.0 2.0 4.0 2.0
6
5 6 4
50 pc Hold
2
`1
A
5
2 1
50 pc Hold
16.0
6
5 3 4 2
26.4 18
50 pc Hold
OTHER ACTIVITIES CONTROL BLOCK J.E.S. LOCATION: Posted on press control panel (Each press)
SAFETY AUDIT
Verify light curtains at beginning of shift Perform gaging as stated in the control plan. Perform audit at beginning of shift Notify fork lift operator when gondola is full (400/container) Tag material with OK to move tag. Record downtime, post performance data to team board at end of shift, record scrap data.
QUALITY AUDIT
W.P.O.
MATERIAL HANDLING
2ND SHIFT
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
147
STANDARDIZED WORK
Best People Practices Chart Address: AA-007
Operation Name:
Head ABCDE/RUNNER/ABCDE Line: 1 Shift: ALL Area: L6 Head Assembly
(Example)
Contact your coach or coordinator with any changes, questions, or quality concerns.
Elements Unload 'ABCDE/Runner/ABCDE' Place cluster on rack Tape runner with blue tape and masking tape Transfer 'ABCDE/Runner' to 'ABCDE/Runner/ABCDE' fixture on assembly machine Load 'Runner' onto assembly machine Start machine cycle for 'ABCDE/Runner' and 'Runner' Get 'ABCDE' from WIP table Load 'ABCDE' onto assembly machine Get 'ABCDE' from WIP table Load 'ABCDE' onto assembly machine Start machine cycle for 'ABCDE/Runner/ABCDE' and 'ABCDE/Runner' Get 'Runner' from cart
11 12
10
6 7 9
TOTAL MANUAL TIME: 45.78 sec Standard Daily Routine ( Minutes per Shift) Shift Second 389 5 9
2 Rack
3 Tape
Item A B C
Elements Load/Unload machine AA-007 Record production downtime/scrap Cart handling for 'Runners'
First 389 5 9
Note: Operator will be relieved during two 23-minute breaks and one 30-minute lunch. Effective Date:________________________________ Manufacturing General Supervisor Approval:________________________________
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
148
(Example)
ERGO IN PROCESS STOCK NO. OPERATOR
PROCESS NAME:
ELEMENT TIME
SAFETY
WORK ELEMENTS
HANDWORK MACHINE WALKING
DIAGRAM
24
1 LOAD VANES 2 SET VANES 3 SET INNER RING AND LOAD TAB ROLLER 4 LOAD / UNLOAD WASHER 5 SET PUMP TO SHIPPING RACK
2.8 7.1
WASHER VANER
5
A
41 Sec. 34 Sec.
22.9 34.0
12.7 4.9
J.E.S. LOCATION:
POSTED AT OPERATOR WORK STATION SAFETY AUDIT QUALITY AUDIT W.P.O. MATERIAL HANDLING DATA
OTHER ACTIVITIES
VERIFY LIGHT CURTAINS AT BEGINNING OF SHIFT PERFORM GAGING AS STATED IN THE CONTROL PLAN PERFORM AUDIT AT BEGINNING OF SHIFT PUSH FINISHED PRODUCT TO NEXT OPERATION EVERY 64 PARTS
CONTROL BLOCK
ASSIGNED OPERATORS 1ST SHIFT 2ND SHIFT ROBERT ADAMS SAM BATES TRAINING DATE 1/12/04
SAFETY REQUIREMENTS
SAFETY GLASSES
SUPPLEMENTAL EMPLOYEES 1ST SHIFT 2ND SHIFT Tom Smith Patricia Knoles
RECORDING
RECORD DOWNTIME, POST PERFORMANCE DATA TO TEAMBOARD AT END OF SHIFT, RECORD SCRAP DATA
OTHER
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
149
(Example)
ERGO IN PROCESS STOCK NO. OPERATOR
PROCESS NAME:
ELEMENT TIME
SAFETY
WORK ELEMENTS
HANDWORK MACHINE WALKING
DIAGRAM
24
1 LOAD VANES 2 SET VANES 3 SET INNER RING AND LOAD TAB ROLLER 4 LOAD / UNLOAD WASHER 5 SET PUMP TO SHIPPING RACK
2.8 7.1
WASHER
4
A
3 1 2
PIERCE
VANER
41 Sec. 34 Sec.
CONTROL BLOCK
ASSIGNED OPERATORS 1ST SHIFT 2ND SHIFT ROBERT ADAMS SAM BATES TRAINING DATE 1/12/04 1/12/04
SAFETY REQUIREMENTS
SAFETY GLASSES
RECORD DOWNTIME, POST PERFORMANCE DATA TO TEAMBOARD AT END OF SHIFT, RECORD SCRAP DATA
SUPPLEMENTAL EMPLOYEES 1ST SHIFT 2ND SHIFT Tom Smith Patricia Knoles
OTHER
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
150
Training is simplified and consistent. Reminds operator of correct sequence. Alerts operator to safety concerns. Assures operator is following approved process (Layered Process Audits)*.
Assures leadership operation is running as approved. Operator knows if equipment is showing signs of wear. Machine and operator hand work and walk time separated. Time allocated for quality checks are included.
151
OPERATOR INSTRUCTIONS
JOB ELEMENT SHEET
(JES)
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
152
ELEMENT Sequence..
STANDARD OPERATION SHEET (A) STANDARD OPERATION SHEET (B) STANDARD OPERATION SHEET (C) STANDARD OPERATION SHEET (D)
J.E.S. - 1 J.E.S. - 1 J.E.S. - 2 J.E.S. - 2 J.E.S. - 3 J.E.S. - 3 J.E.S. - 4 J.E.S. - 4 J.E.S. - 5 J.E.S. 5 J.E.S. - 6 Job Element J.E.S. 7 Sheet
Job Element Sheet
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
153
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
154
OPERATOR INSTRUCTIONS
Where to use operator instructions? Operator instructions are commonly available for: manufacturing and assembly inspection and data collection pack out laboratory
offline rework and containment set-up and change-over events prototype and engineering activities process labeling points material handling shipping and receiving maintenance/repair office
VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
155
Boundary Sample
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
156
Element
When Writing Major Steps You Should: Be brief Describe a single action Avoid use of abbreviations, acronyms and jargon
Examples: Place part in fixture. Rotate jog switch to the Run position. Press Start Cycle button
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
157
Points in a job operation which could result in team member injury Operational points on which the success or failure of a particular job depends Points which make the job performance easier Points that describe quality requirements for an operation
LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
158
REASONS WHY
What happens if the key point is ignored? Why is it done this way? What is the reason? Every Key Point must have a reason.
Why has my trainer told me I MUST do this?
Final Customer has found this defect Spark can cause an explosion
159
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
160
Page:
1of 1
1 2 3
SEQ 1
SYM
- KEY POINT (How) 1A USE BLUE VINYL GLOVES 1B REMOVE ALL TAGS, STICKERS AND DEBRIS 1C SET ASIDE DAMAGED OR DIRTY DUNNAGE
REF
- REASON (Why) 1A CUSTOMER DEMAND 1B PROPERLY IDENTIFIED ASSEMBLIES TO CUSTOMER 1C REDUCE SEDIMENT LEVELS 2A PROPERLY IDENTIFIED ASSEMBLIES TO CUSTOMER NUMBERS 3 THROUGH 9 ARE THE ONLY ONES ACCEPTED BY OUR CUSTOMER. OTHERS ARE TO BE PUT INTO REJECT BUGGY 3A OBTAINS "PARK" STATUS IN AUTOMOBILE 4A ALLOWS FINAL DRIVE ASSEMBLY TO BE INSTALLED INTO TRANSMISSION CASE AT ASSEMBLY PLANTS 5A REDUCES BODY STRAIN
VISUALLY INSPECT ASSEMBLY AND WRITE CORRESPONDING STACK HEIGHT NUMBER ON INTERNAL GEAR. ONLY #'s 3 THROUGH 9 ARE TO BE USED
2A ENSURE CORRESPONDING INKJET INFORMATION IS CORRECT WITH STACK HEIGHT NUMBERS WRITTEN IN WHITE ON HEAVY DUTY, PINK ON VOLVO AND A YELLOW DOT ON VOLVO INTERNAL 3A ACKNOWLEDGE SPRING TENSION AND WINDOW CLEARANCE
3 4
DEPRESS PARK LOCK PAWL INTO PARKING GEAR INSERT SHORT END OF SHIPPING PIN INTO INTERNAL GEAR PIN HOLE, LONG END LOCKING PARK LOCK PAWL IN POSITION
4A TURN INTERNAL GEAR WHILE DEPRESSING PARK LOCK PAWL UNTIL PARK LOCK PAWL ADVANCES INTO FULL DEPTH 5A INSERT UNLOAD ASSIST DEVICE INTO THE SUN GEAR SHAFT AND LIFT FINAL DRIVE ASSEMBLY INTO THE BASKET USING THE "UP" AND "DOWN" CONTROL LEVERS 5B LOWER ASSEMBLY CAREFULLY INTO DUNNAGE,
Safety
Ergonomics
Quality
K Knack
C Critical
File/Ref:ES-705-FAHDVU
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
161
TECHNICAL MEMORY
On back of JES
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
162
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
163
164
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
165
Operator Instructions: promotes safety and quality consciousness. minimizes missed steps in the process. - operations - omitted or incorrect components - quality checks - labeling increases the operator's level of understanding. standardizes operator training process.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
166
post Standardized Work Instructions at all operations. utilize a systematic approach to develop Operator Instructions for all
work.
167
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
168
necessary to assure Standardized Work Instructions are being followed. Trainers shall instruct operators using the standard operation training record. The trainer shall notify downstream operations of potential defects.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
169
How We Learn
How Much We Tend to Remember
10% of what we READ 20 % of what we HEAR 30% of what we SEE 50% of what we both HEAR and SEE 70% of what we SAY 90% of what we both SAY and DO
READING HEARING WORDS LOOKING AT PICTURES WATCHING A MOVIE WATCHING A DEMONSTRATION
Visual receiving
PASSIVE
Doing
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
170
TRAINING
DOs: Always show an interest for the students well being. Have an interest in the topic matter. Know the topic matter thoroughly.
PRINCIPLES OF LEARNING
1) Meaningful Learning 2) Active Learning 3) Multi-Sense Learning 4) Repeated Practice 5) Feedback 6) Reward / Recognition 7) Primacy and Recency
Be prepared.
Trust the student and allow them to grow. DONTs: Never laugh at the student for a stupid question. Never assume that you know everything, and that you cant learn. Do not just lecture, but ask questions to check understanding.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
171
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
172
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
173
Job Element____________
Sketch:
2 3 4
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
174
Step 3 - Try Out Performance Team Member to Perform the Operation Select 1st set of elements (based on job competency) Have Team Member do the job with Team Leader Reading the Major Steps Have Team Member Explain Each Element and Major Steps While They Perform the Job Have Team Member Explain Each Major Step and Key Points As they Perform the Job Again Have Team Member Explain Each Major Step, Key Points and Reasons Why As They Perform the Job Again Add More Elements and Repeat Job for Understanding & Correct Performance Continue Performing Job Until You Know The Team Member Knows the Job Completely
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
175
Step 4 Follow-Up Verify team member job competency (meeting quality stds. in takt time) Have team member demonstrate understanding & capability of: Safety Requirements Standardized Work Quality Requirements Trainer completes quality checks Minimum of 15 units/job or as appropriate Leave team member to work on his/her own Designate to whom the team member goes to for help (such as Supervisor, Problem Solver, Process Control Manager, Quality Network Reps, Specs, etc.) Check Frequently Encourage Questions Give Any Necessary Extra Training Needed
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
176
Remember, Good Training Is the Key to Our Success! Take Time to Prepare and Train Right the First Time!
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
177
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
178
(Example) Complete
Application: The following shall be completed with any new operator (for any given operation).
179
(Example)
Mold / Station # Associate Name:
Associate Initials
Trainer Initials
Comments
QUALITY
Gate trimming Technique Visual Defects Scrap Procedure
PAPERWORK
Production reporting Scrap Reporting Bar Code Scanning / Label Verification
OPERATIONS
Operator 1 Work Instructions - Min. 16 Hrs. Operator 3 Work Instructions - Min. 16 Hrs. Packaging Requirements (Regular / Service)
WORKCELL ORGANIZATION
5S Responsibilities Supply Cabinet Location / Contents Work Cell Board Review
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
180
REQUIREMENTS (continued): The trainer shall verify quality at a frequency determined necessary to assure all standards are met. At a minimum the trainer shall return within the shift and again within approximately one day. Operator training shall be tracked on Trained Operator Tracking Sheets. Operator Tracking Sheets shall be posted at each operation and verified through Layered Process Audits. Scheduling of refresher training for assigned operators is at local site discretion. Supplemental/Temporary employees shall not perform the job unless they have been trained within the last three months.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
181
(Example)
LATEST Job Instructions Rev. Date
1/02/04 J.M. 9/23/04 K.T. 10/14/04 J.M 1/02/04 J.M. 9/23/04 K.T. 1/02/04 J.M. 9/23/04 K.T. 10/14/04 J.M 1/02/04 J.M. 9/23/04 K.T. 10/14/04 J.M
SUPPLEMENTAL EMPLOYEE Brown, L 1/02/04 J.M. 9/23/04 K.T. Troy, P. 1/02/04 J.M. 9/23/04 K.T. 10/14/04 J.M
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
182
(Example)
FLEXIBILITY CHART
OUTPUTS
Helps Analyze Job Requirements
(Illustrates the number of trained team members per job)
Generates Workforce Capability Picture Identifies Potential Workforce Problems / Weaknesses Helps Plan Job Instruction Training Supports Continuous Improvement
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
183
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
184
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
185
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
186
DEFINITIONS:
Error Proofing Device (CAN NOT MAKE) - Devices which prevent the manufacture or assembly of nonconforming product. Error Detection Device (CAN NOT PASS or CAN NOT ACCEPT) Devices which prevent the transfer of nonconforming product (e.g. 100% in-line inspection equipment).
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
187
Master Document of Error Proofing devices, with identification number and location Verification frequency Identify masters (Good/Bad) and defect being checked
REACTION PLANS SHALL BE DEVELOPED TO FOLLOW WHEN THE ERROR PROOFING DEVICES FAIL VERIFICATION
Clearly defined reaction plan if device fails to detect When/if shut down when device fails to detect bad part? Containment plan? (100% Inspection, etc.) Are suspect parts rerun thru Error Proofing device? How/when is Error Proofing device repaired? Lot size of parts run between Error Proofing verification History of process to determine verification frequency How robust is the process? How easy is it to contain suspect product?
Develop Log of Error Proof Verification failures with reaction plan to nonconformities Develop form to notify of nonconformities and escalate reaction to nonconformities Document as Lessons Learned Method for getting information to management Determine how information is to be displayed
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
188
(Example)
SHIFT:
DATE:
YES NO PROBLEM
Code
4 5 6 7 8 9 10 11 182 15 12 13 14 YES NO
10 DID REJECTED PART STAY IN STATION? (SMALL SNAP RING) 11 DID ANDON ALARM SOUND ? (SMALL SNAP RING)? 12 DOES PART STILL STAY IN STATION WHEN HAND VERIFICATION TOOL DISPLAYS A RED REJECT LIGHT? 13 IS SMALL SNAP RING VISUAL IN PLACE ? 14 IF SMALL SNAP RING TOOL IS DOWN, IS THE BACK-UP GAGE USED? 15 DOES BACK-UP GAGE REJECT PART IF NO SNAP RING IS PRESENT? 16 DOES THE LIGHT TURN RED? (SMALL SNAP RING BACK-UP)?
SUPERVISOR: ______________________________
ANY ITEM SHADED NOT WORKING PROPERLY, THE SUPERVISOR MUST BE NOTIFIED IMMEDIATELY. ANY ITEM OUT OF COMPLIANCE SHOULD BE REVIEWED WITH SUPERVISOR OR A COPY OF THE AUDIT GIVEN TO SUPERVISOR.
Completion of the verification should be documented and visually displayed in the workstation. The devices verification status should be obvious to everyone in the area.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
189
(Example)
DEPT.____________
100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
JAN % IN COMPLIANCE: # OF ITEMS ON CHECKLIST: # OF VERIFICATIONS TOTAL # OF ITEMS VERIFIED: # OF ITEMS IN COMPLIANCE:
FEB
MAR
APR
MAY
JUNE
JUL
AUG
SEP
OCT
NOV
DEC
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
190
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
191
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
192
193
194
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
195
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
196
Frequent assessments by all layers of the organization (Team Leader Plant Manager) are performed using the Layered Process Audit checklist. The Layered Process Audit system includes: - Evaluation against established standards.
Quality Focused checks are specific to operations and developed by plant, based on quality feedback, process knowledge, and problem solving
Production System base list of checks, applicable to all work stations
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
197
The Intent is to have a single page Layered Process Audit FORM, with TWO COMMON sections and one, (Section #2), that is customized to a specific Product Line or Area of the Plant.
The Layered Process Audit is entirely a manual format. The back side of the form is available to write down the non-compliance comments. It is recommended that you start this way so the users get an in-depth knowledge of the content and functionality of how the Layered Process Audits process supports QSB.
Users then transfer the written issues that were not corrected immediately, directly to a blank countermeasure report for assignment and corrective action. This progress review shall be conducted at least once per week.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
198
Section #1: COMMON WORKSTATION QUESTIONS 1. Tailor fit the questions in this section which are common across all work stations. Changes should be minimal here and should only require modification to descriptions of documents or procedures.
- Grey boxes denote questions to be asked of the Team Member working in the station or operation being audited.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
199
200
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
201
202
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
203
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
204
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
205
SYSTEMS QUESTIONS
3. Tailor fit the questions in this section which are common across all work areas. As in Section #1, changes should be minimal here and should only require modification to descriptions of documents or procedures.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
206
Plant Staff and Shift Leaders/Managers review the same items at a workstation level, and in addition review a Group Leaders area using the Layered Process Audit for: Completion of safety talks & tours Compliance to Process Control Plans Conformance to Workplace Organization standards Proper use of the Andon System Effective Problem solving & countermeasure implementation Effective use of Layered Process Audits process for control and follow up
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
207
HEADER: Enter the System Name Product line or an area of the Plant 1. Molding 2. Paint/Coating 3. Assembly 4. Warehouse/Shipping
Create a master Layered Process Audit form for each Unique Processing Area
In this Example the Manufacturer would have (4) four unique one page audit forms/files, to cover all processes.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
208
GMS Layered PROCESS Audits - Process LAYERED AUDITS Choose the Workstation
Pick the station that has not been recently audited.
describe things as they are follow your usual routine, let auditors catch the actual, current status of your workstation if you deviate from the standard, provide actual reasons why, as you understand them help implement actions to remove deviations.
Follow standardized checklist, always study the standard and compare to the standard.
Immediately inform all TMs concerned about the audit results. Record all deviations on standardized problem tracking sheet. Implement suggested countermeasures as soon as possible.
to be informed about the findings of the audit in your team to see / be involved in actions on any deviations found to be informed / able to follow progress of the process on the tracking sheets
Follow-up
FR&PS NCM VS
Follow-up on open items, make sure to close in one week. Elevate problem to higher level after target date.
LPA EPV WPO SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
209
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
210
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
211
- Leadership shall conduct Process Layered Process Auditss assessments periodically (monthly/quarterly).
Operator M Supervisor
212
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
213
CHECKLIST EVALUATION
There are three results that can come out of each check: Y No Deviations are Found N Deviation Found NC Corrected during audit Drive this behavior N/A Not Applicable (established at Plant/Shift Leader level) All Deviations shall be recorded on the Layered Process Audit Checklist and described in the results sheet, details section. Any Deviations that can be corrected immediately will have a letter C next to it. Any Deviations that cannot be immediately corrected must have additional detail written and transferred to a countermeasure. Reasons for non-compliance should be understood.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
214
Y NC
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
215
1-8 Boundary samples referenced in the JES not available in station to the team member. Quality Engineer was notified.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
216
After you complete the audit, review the results with the areas manager or supervisor and have them sign and date the audit.
All questions answered N on the Audit Check Sheet that cannot be resolved immediately will be entered on the Countermeasure sheet as an open item.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
217
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
218
(Example)
Initials Complete Date 7/8/03
RS RS
7/7/03
005R
TL1
7/8/03
7/8/03
Open discrepancies, those issues not immediately corrected during the audit, are tracked to closure using a Countermeasure process. The countermeasure sheet is updated and signed as issues are resolved. At the users discretion, they may also choose to track total # of discrepancies found over time. This can be done at an aggregate or line item level of detail as required to meet their needs. Support groups should be invited to participate in the audit process. All levels of the organization should be involved when leadership audits their area to support proper Coaching / Positive reinforcement
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
219
Review Process Shift Leader is Process Owner Regularly scheduled review meeting (recommend weekly) Review compliance & completion performance Elevate past due countermeasures to next level Review audit questions for Continuous Improvement (add, delete, revise as needed) Visualize Results In Work Area Post audit results AND Countermeasure Chart Post Compliance and Completion Performance When appropriate, the Layered Process Audit nonconformance shall be added to the Fast Response* system and/or the C.A.R.E.* checklist. Layered Process Audit results shall be added to the Lessons Learned* database when appropriate. Audit results shall be summarized and reviewed by the manufacturing site leadership.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
220
(Example)
4 Action
Do
2
Check
Plan
Audit (Blanks)
Completed Audits
COUNTERMEASURES
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
221
47 43 43
45 40 35
27 23 16 16 24 19 22
30 25 20 15 10 5 0
JAN 88% 20 20 400 353 47 FEB 68% 15 9 135 92 43 MAR 95% 20 28 560 533 27 APR 96% 30 15 450 434 16 MAY 97% 20 20 400 386 14 JUNE 84% 10 10 100 84 16 JUL 95% 20 20 400 380 20 AUG 95% 25 20 500 477 23 SEP 94% 20 20 400 376 24 OCT 95% 20 20 400 381 19 NOV 95% 20 20 400 378 22 DEC 89% 20 20 400 357 43
14
% IN COMPLIANCE: # OF ITEMS ON ASSESSMENT: # OF ASSESSMENTS TOTAL # OF ITEMS ASSESSED: # OF ITEMS IN COMPLIANCE: NON CONFORMANCES NON CONFORMANCES Safety Missed Audits 5S Related Product Voice of Customer Systemic Gage Calibration Poke Yoke
10 10 2 10 6 9
8 8 7 4 4 7 5
5 3 7 3 2 1 6
2 2 3 2 2 2 3
1 1 2 1 2 2 2 8
1 1 3 1 2 2 2 10
1 10 2 10 10 2 2 6
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
222
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
223
REACTIVE
ERROR PROOFING PAST QUALITY FAILURES
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
224
225
SEVERITY RANKINGS
Effect Hazardous without warning Hazardous with warning Very High Criteria: Severity of Effect This ranking results when a potential failure mode results in a final customer and/or a manufacturing/assembly plant defect. The final customer should always be considered first. If both occur, use the higher of the two severities. (Customer Effect) Very high severity ranking when a potential failure mode affects safe vehicle operation and/or involves noncompliance with government regulation without warning. Very high severity ranking when a potential failure mode affects safe vehicle operation and/or involves noncompliance with government regulation with warning. Vehicle/item inoperable (loss of primary function). Criteria: Severity of Effect This ranking results when a potential failure mode results in a final customer and/or a manufacturing/assembly plant defect. The final customer should always be considered first. If both occur, use the higher of the two severities. (Manufacturing/Assembly Effect) Or may endanger operator (machine or assembly) without warning. Or may endanger operator (machine or assembly) with warning. Or 100% of product may have to be scrapped, or vehicle/item repaired in repair department with a repair time greater than one hour. Or product may have to be sorted and a portion (less than 100%) scrapped, or vehicle/item repaired in repair department with a repair time between a halfhour and an hour. Or a portion (less than 100%) of the product may have to be scrapped with no sorting, or a vehicle/item repaired in repair department with a repair time less than a half-hour. Or 100% of product may have to be reworked, or vehicle/item repaired off-line but does not go to repair department. Or the product may have to be sorted, with no scrap, and a portion (less than 100%) reworked. Or a portion (less than 100%) of the product may have to be reworked, with no scrap, on-line but out-ofstation. Or a portion (less than 100%) of the product may have to be reworked with no scrap, on-line but in-station. Or slight inconvenience to operation or operator, or no effect. Ranking 10
High
Moderate
item(s)
Low
Vehicle/Item operable but Comfort/Convenience item(s) operable but at a reduced level of performance. Fit and Finish/Squeak and Rattle item does not conform. Defect noticed by most customers (greater than 75%). Fit and Finish/Squeak and Rattle item does not conform. Defect noticed by 50% of customers. Fit and Finish/Squeak and Rattle item does not conform. Defect noticed by discriminating customers (less than 25%. No discernible effect.
4 3
2 1
226
OCCURRENCE RANKING
Probability Likely Failure Rates PpK Ranking
< 0.55 > 0.55 > 0.78 > 0.86 > 0.94 > 1.00 > 1.10 > 1.20 > 1.30 > 1.67 10 9 8 7 6 5 4 3 2 1
Very High: Persistent Failures > 100 per Thousand Pieces 50 per Thousand Pieces High: Frequent Failures 20 per Thousand Pieces 10 per Thousand Pieces Moderate: Occasional Failures 5 per Thousand Pieces 2 per Thousand Pieces 1 per Thousand Pieces Low: Relatively Few Failures 0.5 per Thousand Pieces 0.1 per Thousand Pieces < 0.01 per Thousand Pieces Remote: Failure is Unlikely
(AIAG PFMEA Third Edition)
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT)
Risk Reduct
Contam
SCM
227
Detection
Criteria
Manual Inspection
Error Proofed
Gauged
Rating
DETECTION RANKINGS
X X X X X X
10
Absolute certainty of non-detection. Controls will probably not detect. Controls have poor chance of detection. Controls have poor chance of detection. Controls may detect. Controls may detect. X
Cannot detect or is not checked. Control achieved with Indirect or random checks only. Control is achieved with visual inspection only. Control is achieved with double visual inspection only. Control is achieved with charting methods, such as SPC. Control is based on variable gauging after parts have left the station, or go/no-go gauging performed on 100% of the parts after parts have left the station. Error detection in subsequent operations, OR gauging performed on set-up and first piece check (for set-up causes only). Error detection in station, OR error detection in subsequent operations by multiple layers of acceptance: Supply, select, install, verify. Cannot accept discrepant part. Error detection in-station (automatic gauging with automatic stop feature). Cannot pass discrepant part. Discrepant parts cannot be made because item has been error proofed by process/product design.
Controls have a Moderately 4 good chance to High detect. Controls have a 3 High good chance to detect. 2 1 Very High Certain Controls almost certain to detect. Controls certain to detect.
X X X
228
PO T E POTENTIAL N T IAL F AILURE FAILURE M O DE MODE AN D AND E F FEFFECTS E CT S ANANALYSIS ALYSIS (PRO (PROCESS CE SS F M E FMEA) A)
REV'D DATE : FMEA DATE : FMEA CONDUCTED BY :
PROCESS FUNCTION
S E V
O C C
CURRENT CONTROLS
PREVENTION
DETECTION
D E T
R P N
ACTION RESULTS RESPONSIBILI RECOMMENDED TY & TARGET S O D ACTION(S) COMPLETION ACTIONS E C E DATE TAKEN V C T
R P N
10
7 No
20
How often does this cause happen? (AIAG PFMEA Third Edition)
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT)
229
230
PFMEA REVIEW
Multi-disciplinary teams shall perform periodic PFMEA Reviews. The frequency and/or number of PFMEA reviews shall be determined by supplier leadership based on: customer expectations (PR/Rs, DDW, Launch activities, etc)
231
PFMEA Review shall include the following at a minimum: verification that all operations/processes are included and accurate (paint, heat treat, material handling, labeling, etc). all process controls are included. Detection ratings are accurate. Occurrence ratings are analyzed using data (SPC, FTQ, Quality Gate, C.A.R.E.*, Scrap, Layered Process Audits* results, etc). verification that the PFMEA meets customer requirements and expectations (AIAG, PPAP, Launch, DDW, etc). Upon completion of the review, a list of the highest (RPN) Risk Reduction opportunities is established or revised based on the new data.
An action plan or equivalent shall be utilized by the multi-disciplinary team to track progress in reducing the RPN ratings.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
232
(Example)
Completion Revised Date RPN
10
490
B. SHAD
12/1/2004
112
20
126
N. ADAMS
12/31/2004
42
50
HOLE MISSING
168
42
60
INCORRECT LABEL
112
V. WAGNER
IMPLEMENT SCANNER
1/30/2005
21
The number of RPN reduction opportunities on the list is dependent on complexity of parts and process, size of plant, customer feedback, etc
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
233
(Example: GM form1927-21)
234
Team(s) identify true PFMEA Severity, Occurrence and Detection rating for each RPN using AIAG guidelines.
Team(s) shall develop an action plan to Error Proof the failures. Recommended Actions are improvements that will prevent or reduce the Failure Mode. When Error Proofing is not feasible, a plan to improve detection shall be established.
A team member shall be assigned responsibility for implementing the recommended action.
Reasonable target completion dates shall be established.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
235
QUALITY FAILURES
# of Issue # Proplem Discription Occurances ICA-04-01 WRONG FITTINGS INSTALLED 21 CA-04-12 NUT LOOSE / UNDER TORQUED 10 CA-04-04 O'RING SEAL CUT/DAMAGED 8 ICA-04-09 SPRING OMITTED 8 ICA-04-15 ASSEMBLY DAMAGED BY IMPROPER HANDLING 5 CA-04-02 SEAL MISLOCATED, OMITTED OR EXTRA 5 CA-04-05 SENSOR DAMAGED / BROKEN 4 CA (EXTERNAL) ICA (INTERNAL) Last Cost Per Occurance Occurance 9/23/2004 $940 11/4/2004 $950 11/11/2004 $1,165 10/30/2004 $457 12/31/2004 $1,500 12/4/2004 $864 11/11/2004 $453
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
236
Error proofing shall be verified per the Error Proofing Verification* process.
When corrective actions have been implemented, teams shall
validate the new Occurrence and Detection rankings and resultant RPN.
Teams shall update PFMEAs with all corrective action measures.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
237
RISK REDUCTION
SITE LEADERSHIP:
should review the need for PFMEA training at least once per year. shall support RPN reduction activities and provide necessary resources. shall review the RPN reduction tracking charts. shall ensure that formal multi-disciplinary teams are utilized in the preparation and ongoing review of PFMEAs.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
238
Risk Reduction
BENEFITS:
Supports continual improvement as expected by TS16949. Allows leadership to allocate limited resources to critical areas. Provides a basis for effective error-proofing and problem solving. Core tool for APQP and PPAP requirements. Provides a Lessons Learned archive. Promotes cross-functional teamwork. Meets customer expectations for living documents.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
239
240
CONTAMINATION CONTROL
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
241
CONTAMINATION CONTROL
Contamination Control establishes minimum requirements to avoid product failure. Throughout this section, Contamination shall be defined as: Dirt, foreign materials or sediment (Note: Castings define Contamination as retained material.) Extra parts (i.e. extra fasteners Coating Contamination Suppliers shall have procedures and work instructions for Contamination Control where appropriate. Work instructions may require: Process monitoring SPC or data collection Routine maintenance Preventative or predictive maintenance
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
242
CONTAMINATION CONTROL
Each manufacturing site shall define procedures for the method and frequency of checks required to ensure proper functionality of processes and equipment such as:
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
243
244
CONTAMINATION CONTROL
Contamination related customer complaints shall require corrective actions. Non-compliance addressed through Fast Response* and Layered Process Audit* systems. A best practice for contamination control, problem solving and continuous improvement is to use a multidisciplinary team approach. The four main areas of focus for the Contamination Control Team are: People Process Facilities Material
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
245
CONTAMINATION CONTROL
Some Key issues in the People area:
Dirt Awareness Self inspection/clean up on all operations Clean area for paint and electronics manufacturing
Communicate expectations
approved attire only understand and follow personal product restrictions no Food/Drink/Smoking no fibrous materials in paint and coatings areas i.e., newspapers, paper towels, cardboard, etc.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
246
CONTAMINATION CONTROL
Some Key issues in the Process area:
Process Monitoring
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
247
CONTAMINATION CONTROL
Some Key issues in the Facilities area:
Facility maintenance relating to contamination sources in all process and equipment: Cleaning Filter changes Balance requirements General Housekeeping requirements. Clean Rooms for Coatings, Paint, and Electronic Areas closed and sealed. Proper ventilation.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
248
CONTAMINATION CONTROL
Some Key issues in the Material area: Dunnage maintenance and cleaning (ex.: cardboards, papers, old labels) Purchased and in-process parts cleanliness (ex.: rust, coatings, mixed parts) Storage locations conditions (ex.: dust, temperature and humidity control) Proper material rotation
249
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
250
LEVEL 1: BASIC
(Example)
Components where cleanliness is not an overriding concern. Applies to all parts and components. A note will appear on part drawing as:
LEVEL 1: PARTS AS DELIVERED TO ASSEMBLY SHALL BE CLEAN AND FREE OF DEBRIS, RESIDUAL ABRASIVE MATERIAL, AND CORROSION PRODUCTS ADVERSELY AFFECTING FUNCTION OR APPEARANCE.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
251
establish an acceptable initial level of part/process cleanliness establish appropriate processes and controls to measure part cleanliness at a specified frequency require recording/plotting of these measures require control limits be utilized to trigger reaction plans require corrective action to prevent nonconforming products
NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
252
(Example)
Critical or high debris sensitive components where additional specific weight/size limits or residual debris are specified. Examples include: Cylinder cases / Cylinder heads A note will appear on part drawing as:
LEVEL 3: (Includes the Level 1 & 2 note) IN NO CASE SHALL DEBRIS EXCEED (X) MILLIGRAMS [AND/OR (Y) DIAMETER] WHEN MEASURED PER TEST GMN METHOD GMN6752.
Monitoring of the process shall be included in Layered Process Audits* and corrective actions addressed during Fast Response.* These process monitoring points may be Verification Stations.*
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
253
EMPLOYEE AWARENESS
Customer concerns due to contamination should be communicated to all employees using plant communications such as: Fast Response* Tracking Board, Quality Q Quality Alerts, Corrective Action documents (PPSR) newsletters, closed-circuit television Lessons Learned* Data Base Areas sensitive to contamination shall be identified for: Employees Visitors Vendors (Suppliers) Post maintenance checklist after maintenance is done to designate area is fit for manufacturing
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
254
CONTAMINATION CONTROL
Organizations shall
Suppliers shall have procedures and work instructions for Contamination Control where appropriate. Site leadership shall review contamination data to determine the necessary corrective actions. Contamination related customer complaints shall require corrective actions.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
255
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
256
Tier 2 Supplier
Tier 1 Supplier
Dealer
Customer
The supply chain shall utilize systems and processes to control and develop their suppliers.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
257
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
258
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
259
(Example)
Plant Disruptions
Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06
Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06
No Change CYTD
PPM's 8,957
Stockouts
1 1 1 1 1 1 0 0 0 0 0
89
46 Aug06
Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06
No Change CYTD
1 1 1 1 1 1 0 0 0 0 0
GCA PR/R's
Downtimes
Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06
Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06
No Change CYTD
Report Name: Supplier Activity / Charts PRR Types = Quality | Warranty | Cust. Sat.
No Change CYTD
Data As Of Sep 16 2006
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
260
M
RANK SUPPLIER
(Example)
Data as of
19-Jun-03
Metallic
(Commodity)
QUALITY SERVICE TECHNOLOGY PRICE INFO
6 M o. M ay. 0 3
6 M o.
3 M o.
3 M o. D ec. 0 2
6 M o.
La unc h
M f g.
Wa rra nt y O pe n
A ll
G G G ABC
ONTARIO
GMNA
Y Y G DEF
MICHIGAN
GMNA
G GHI
INDIANA
GMNA
G R Y JKL
MEXICO
GMNA
XYZ
EUROPE
GME
Screw Machine Parts - GMNA Screw Machine Parts (36, 24) Screw Machine Parts - Screw Machine Parts (36, 24) Body Hardw are Body Hardw are (61.5, 41) Mechanical Control Systems Mechanical Control Systems (120, 80) Ride Controls Current Suppliers (75, 50) Steering Systems Current Suppliers (180, 120)
R Y G
R R R Y Y Y G G G
>1 1 0
>1 1 0
N W Y
Y N
3-5 0-2
4, 5 3 1, 2
R Y G
R Y G
If Price Rank is Red for Financial Stress must have approval If Technology Rank is Red, Sourcing requires Engineering approval If Service Rank is Red, Sourcing requires an approval action plan from SPO If Quality Rank is Red, Sourcing is prohibited unless contractual
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
261
Creativity Team Major Function (Mar. PPM Target, 2003 Year End Target)
Commercial Savings
Financial Stress
Lead Region
Mfg. Duns
SOE-SSR
Location
Quality
Name
NBH
SPDI
PPM
All suppliers to General Motors shall have a comprehensive, documented approach to managing their supply base
Ranking for key suppliers Ranking system for key metrics System to address supplier concerns PPAPs for all components Issuance of Corrective Action Requests Documented process for supplier improvement Control of Pass Through characteristics
Supplier chain management shall include updates on the following: - Supplier concerns and responses - Unacceptable supplier performance to expectations - Current supplier quality activities
The workshop team should discuss how to define a key supplier.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
262
(Example)
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
263
264
Supplier Phone: Plant Location & Country: Auditor Phone: GM Division: Part Name: EWO #: / ODM # Model Year: Commodity:
Partial Other
Yes Yes
No No
N/A N/A
Run at Rate (GP9 Attachement B) Mgmt. Request CSL-1 Critical Fastner (D02) Line /Cell
Part / Assembly
Operation / Machine
Not Approved
TECHNICAL INFORMATION AVAILABILITY 1. Are actual drawings availabe at production facilty with the latest change level? 2. Does the supplier have the final customer approved drawing? 3. Is the print complete (Tolerances, GD&T, Correct Datums, KPCs, etc.)? 4. Are all technical regulations/CTS/SSTS available? 5. If supplier is design responsible, has DFMEA been used to develop the PFMEA? QUALITY SYSTEM DOCUMENTATION 6. Is a Process Flow Diagram available? 7. Does the Process Flow Diagram include receiving? 8. Does the Process Flow Diagram include rework? 9. Does the Process Flow Diagram include scrap? 10. Does the Process Flow Diagram include gauging/inspection? 11. Does the Process Flow Diagram include shipping? 12. Does the Process Flow Diagram include labeling and Part ID at receiving, WHIP, finished good and shipping areas? 13. Is there a PFMEA available? 14. Is the PFMEA acceptable (RPNs, numbers match Process flow and include KPCs/PQCs/KCCs)? 15. Is there any evidence that it is kept up to date? 16. Is there a Process Control Plan (PCP) available? 17. Is the Process Control Plan (PCP) acceptable (numbers match PFMEA and Process Flow, including KPCs/PQCs/KCCs, GP-12 if applicable and latest EWO/ODM included)? 18. Are all "Current Controls" listed on the PFMEA detailed on the Control Plan? 19. Are process controls in place in the PCP to address the high PFMEA Risk Priority Numbers? 20. Is there a procedure/process for Continuous Improvement for Risk Reduction? 21. Are KPCs/PQCs/KCCs called out on the PCP? 22. Are sample sizes and check frequency for each operation reasonable?
Yes
No
N/A
Comments
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
265
Management
(Example)
0 5
Formal process is identified to protect pipeline supply chain (MRP, KAN BAN, etc.) and provide safety inventory. Supplier demonstrates understanding of Process Validation.
0 - Supplier has demonstrated Supply Chain Protection system. 3 - Supplier has supply chain protection system, but needs minor enhancements. 5 - Supplier has supply chain protection system, but needs major enhancements. 10 - Supplier has no supply chain protection plan in place. 0 - Supplier has demonstrated understanding of Process Validation. 10 - Supplier has some Process Validation skills, but needs major enhancementsments. 20 - Supplier has no Process Validation tasks in place.
10
10
Supplier has Material Identification Traceability System supported with current data.
0 - Supplier has demonstrated Material Identification/Traceability System. 3 - Supplier has generic Material Identification/Traceability System; needs minor enhancements. 5 - Supplier has generic Material Identification/Traceability System; needs major enhancements. 10 - Supplier has no Material Identification/Traceability System.
Tier 1 Supplier has plan on how Tier 2-3-4 suppliers will be managed.
0 - Supplier has strong Tier 2-3-4 management system and documentation. 10 - Supplier has generic Tier 2-3-4 management system, but needs enhancements. 15 - Supplier has generic Tier 2-3-4 management system, but needs major enhancements. 20 - Supplier has no Tier 2-3-4 management system or experience.
20
15
Supplier has capability on Change Management enforcement for entire supply chain.
0 - Supplier has demonstrated capability on Change Management enforcement. 5 - Supplier has capability on Change Management enforcement, but needs improvement. 10 - Supplier has minimal capability on Change Management enforcement. 15 - Supplier has no capability on Change Management enforcement,
15
10
Quality
0 -Documented formal audits conducted by management with immediate corrective actions 3 - Documented formal audits conducted and reviewed with management - needs minor improvement
5 - Documented formal audits - not properly supported or conducted frequently enough - improvements required 10 - No evidence a process exists or is not supported properly
0 - Documented formal audits conducted by "supplier quality", reviewed with their management with immediate 15 corrective actions. 5 - Documented formal audits conducted and reviewed with management - needs minor improvement 10 - Documented formal audits - not properly supported or conducted frequently enough - improvements required 15 - No evidence a process exists or is not supported properly
10
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
266
A proactive approach!
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
267
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
268
5 Why Matrix
Revision Date: Name and Title: Supplier Team Lead: Provide a complete member list with contact information on Contact List Worksheet GM SQE: Supplier Duns: Supplier Name and Location: Supplier is Tier 1 to GM Issue Category: PRR PRTS Other , Specify : CDP Issue Number: Phone: RPN Severity Occurance Detection Original Final
(Example)
Failure Mode: Effects of Failure Mode: Cause of Failure Mode: Point of Manufacture Tier 1
Drill Deep Why did the Manufacturing System not prevent this Failure Mode M2
**************** **************** ** **************** **************** ** Manufacturing System Error Proofing & **************** Standardized Work **************** **
Corrective Action
Verification
Owner
Due Date
M1
M3
Prevent
M4
M5
Quality Assurance
Why did the Quality System not Protect GM from this Failure Mode
M-RC
Q1
Q2
**************** **************** ** **************** **************** Quality System ** Error Detection & **************** Containment **************** **
Protect
Q3
Q4
Q5
Quality Control
Why did the Planning System not Predict this Failure Mode
Q-RC
P1
P2
**************** **************** ** **************** **************** Planning System ** informational content **************** in all documentation **************** **
Predict
P3
P4
P5
Quality Planning
What are the key findings based on this quality issue?
P-RC
B
**************** **************** **
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
269
(Example)
SYMBOL & STATUS KEY:
Original location Location with similar process Completed & 3rd Party/GM verified Completed & Supplier verified only Not Completed Pass Through Tiered Supplier NA Not Applicable
A.P.Q.P.
Duns / Location
Duns/Sub-tier classification
Duns 1
Duns 2
Duns 3
Duns 4
Duns 5
Duns 6
Tier 2
Tier 3
GM Plant
FAILURE MODE
N/C or CPV
CS Status
Champion
Symbols
GM Plant
FAILURE MODE
N/C or CPV
CS Status
Corrective Action
Champion
Symbols
GM Plant
FAILURE MODE
N/C or CPV
CS Status
Corrective Action
Champion
Symbols
Drill Wide - analysis of opportunities of system deficiencies and corrective actions that encompass all GM parts, manufacturing processes, and other plant locations.
FR&PS NCM VS LPA EPV WPO SWI (SOS) OI (JES) SOT(JIT) Risk Reduct Contam SCM
270
Corrective Action
Tier 4
271
SUMMARY:
GM expects you, as a supplier, to use a system that manages your suppliers in a similar manner to that used by your customers to manage you.
Organizations Shall:
Manage their suppliers using a documented systematic approach. Use management tools such as: response to issues, performance metrics, audit of supplier activities, and problem solving tools. Implement a supplier measurement and validation system.
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
272
KEY STRATEGIES
1. Fast Response Communication Problem Solving Lessons Learned 2. Control of Non-Conforming Product 3. Verification Station 4. Standardized Operations Work Place Organization The 7 Wastes Standardized Work Instructions SOS Operator Instructions JES 5. Standardized Operator Training 6. Error Proofing Verification 7. Layered Process Audits 8. Risk Reduction 9. Contamination Control 10. Supply Chain Management
No Major Disruptions
No PRRS + 0 PPMS = World Class Quality
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
273
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
274
WORKSHOP
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
275
276
Supervisors, Operators, Training or Human Resources, Manufacturing Engineering, Quality Engineer Operations Manager, Quality Manager, Operators
OI (JES) SOT(JIT) Risk Reduct Contam SCM
277
FR&PS
NCM
VS
LPA
EPV
WPO
SWI (SOS)
OI (JES)
SOT(JIT)
Risk Reduct
Contam
SCM
278