You are on page 1of 29

Avenues Phase 2

March 2013

MEP STRATEGY

Avenues Phase 2

March 2013

MECHANICAL INSTALLATIONS

Avenues Phase 2

March 2013

MECHANICAL INSTALLATIONS
List of Mechanical Standards HEAT LOAD CLACULATIONS MECHANICAL REQUIREMENTS (Architectural Space Allocation) MECHANICAL SERVICES LOCATIONS

Avenues Phase 2

March 2013

List of Mechanical Standards


Services Ashrae Handbook Fundamentals Ashrae Handbook - HVAC Application Ashrae Handbook - HVAC systems & Equipment Ashrae Handbook - Refrigeration Ashrae Std 62 - Ventilation For Acceptable Indoor Air Quality Air Conditioning Title Edition 2009 2011 2012 2010 2010

NFPA 101- Safety life From Fire in building and Structures NFPA 90A Installation of Air Conditioning and Ventilating Systems.
NFPA 70 National Electric Code. NFPA 92 Smoke Control Systems.

2012 2012
2011 2012

DW144 Specification for Sheet Metal Ductworks.


SMACNA Standards for Ductworks. International Building Code BSEN 12056-1-2000 Gravity Drainage System Inside Buildings, Part 1 : General and Performance Requirements. BSEN 12056-2-2000 Gravity Drainage System Inside Buildings, Part 2 : Sanitary Pipe work Layout and Calculation. BSEN 12056-2-2000 Gravity Drainage System Inside Buildings, Part 3 : Roof Drainage, Layout and Calculation. BSEN 752, 2008 Drainage & Sewer Systems Outside Buildings. Plumbing Engineering Services Design Guide ASPE: American Society of plumbing Engineer volume 1, 2, 3 & 4 International Plumbing Code. Local Codes and Ordinances in Dubai UAE. Local Civil Defense Regulations and Requirements.

1998
2005 2012 2000 2000 2000 2008 2002 2001 2012 2011 -

Drainage

Avenues Phase 2

March 2013

List of Mechanical Standards


Services Title British Standards BS 6700-Design, installation, testing and maintenance of services supplying water for domestic use within buildings and their Cartilages Plumbing Engineering Services Design Guide. Water Supply International Plumbing Code. ASPE: American Society of plumbing Engineer volume 1, 2, 3 & 4 Local Codes and Ordinances in Dubai UAE. Local Civil Defense Regulations and Requirements. NFPA 10 Standard for the Installation of Portable Fire Extinguishers NFPA 13 Standard for the Installation of Sprinkler Systems NFPA 14 Standard for the Installation of Standpipe and Hose Systems NFPA 20 Standard for the Installation of Stationary Pumps Fire Fighting Edition 2006 2002 2012 2001 2011 2013 2013 2013 2013

NFPA 101 Safety to Life from Fire in Building and Structures


NFPA 90A Installation of Air Conditioning and Ventilating Systems NFPA 70 National Electric Code NFPA 92 Smoke Control Systems UAE Fire Code Local Civil Defence Regulations and Requirements IMC- Ineternational Mechanical Code IFGC - International Fuel Gas Code

2012
2012 2011 2012 2011 2012 2012 2012 2011 2012

LPG - Gas Distribution

NFPA 54 - National Fuel Gas Code NFPA 58 - Liquefied Petroleum Gas Code NFPA 59

Avenues Phase 2

March 2013

HEAT LOAD CALCULATIONS


Number AREA Building # DESCRIPTION Floors of (SQ.FT) / FL floors
Building 01 Building 02 Building 03 Building 04 Building 05 Building 06 Building 07 Building 08 Building 09 Building 10 Building 11 Building 12 Building 13 Anchor STORE Retail Retail Retail Retail Retail Retail Retail F&B / RESTAURANT F&B / RESTAURANT F&B / RESTAURANT F&B / RESTAURANT Anchor F&B / RESTAURANT F&B / RESTAURANT Building 14 F&B / RESTAURANT F&B / RESTAURANT SPA Building 15 Building 16 TOTAL Anchor ( Leisure) cinema cinema TOTAL GF + 1 GF GF GF GF GF GF Gf GF Gf GF GF GF GF GF GF GF MEZZ GF+1 GF MEZZ 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 40,239.84 12,669.50 12,287.69 17,978.08 16,622.90 19,505.71 36,872.97 21,037.96 3,621.55 3,621.55 3,621.55 3,622.14 24,228.32 3,954.95 4,592.48 4,642.31 4,402.93 29,367.78 23,321.83 131,175.84 11,012.94 428,400.80

AREA (SQ.MTR)/FL
3,738.40 1,177.03 1,141.56 1,670.22 1,544.32 1,812.14 3,425.61 1,954.49 336.45 336.45 336.45 336.51 2,250.88 367.43 426.66 431.28 409.05 2,728.36 2,166.67 12,186.63 1,023.14 39,799.72

Total BUA ( SQ.MTR)


7,476.80 1,177.03 1,141.56 1,670.22 1,544.32 1,812.14 3,425.61 1,954.49 336.45 336.45 336.45 336.51 2,250.88 367.43 426.66 431.28 409.05 2,728.36 4,333.34 12,186.63 1,023.14 45,704.79

Occ. Laod as per Ashrea 62.1


15 15 15 15 15 15 15 15 70 70 70 70 15 70 70 70 70 25 100 50 50

Est .TCL (W)


1,495,360.71 235,406.87 228,312.69 334,043.53 308,863.36 362,427.70 685,121.85 390,897.85 84,113.12 84,113.12 84,113.12 84,126.87 450,176.78 91,856.61 106,663.86 107,821.11 102,261.35 682,088.79 866,667.19 3,046,657.24 255,783.88 10,086,877.61

Public alleys
The Courtyards Stone Axis Fine Dinning Courtyards TOTAL

DESCRIPTION
Internal Walk B01-B13 Pedestal Main Walk Internal Walk B14 TOTAL

Floor s
GF GF GF

Height
1 3 1

AREA AREA (SQ.FT) / FL (SQ.MTR)/FL


95,477.12 45,067.09 10,542.94 151,087.15 8,870.11 4,186.87 979.47 14,036.45

Total BUA ( SQ.MTR)


8,870.11 4,186.87 979.47 14,036.45

Occ. Laod
40 40 40

Est .TCL (W)


1,596,620.00 1,256,060.40 176,304.75 3,028,985.15

Avenues Phase 2

March 2013

OVERALL COOLING LOAD


COOLED AREA (SQ.MTR) 45,704.79 14,036.45 Total preliminary Estimated cooling load TOTAL COOLING (KW) 10,090.00 3,030.00 13,120.00

Avenues Phase 2

March 2013

Mechanical Requirements - Architectural space Allocation


Services Ref. Code 1 Item Water Tank Location Basement level Basement level / option 1 Volume QTY Capacity (m3) 1 740.00 Shaft Dimension (m x m) Area (m2) 200 Room Dimension Notes H= 3900mm (water level )

Fire Fighting

Pump Room

Parking Area / option 2

Parking Area /option 3

1000x1000 ( access for civil defence - 180 20000 x 9000 Direct from GF) 1000x1000 ( access for civil defense - 126 14000 x 9000 Direct from GF) 1000x1000 ( access for civil defence - 153 17000 x 9000 Direct from GF) 2 nos - 1000 x 800 200 (side access opening ) Pit dim ( 1500 x 1500 ) Pit dim ( 1500 x 1500 ) 81 12 15

refer to sketch #1

refer to sketch #2

refer to sketch #3

Water Distribution

Raw Water Tank

Basement level

750.00

6 Irrigation System 7 8 9

Booster Pump Room Irrigation tank Irrigation Pump Room Black water Pit & Sub Pump Room Parking gray Water Pit & Sub Pump Room

Drainage System

10

Basement level Basement level Basement level Basement level Basement level

1 1 1 4

45 -

9000 x 9000 4000 x 3000 5000 x 3000 4000 x 3000

H= 3900 mm ( water level ) location refer to sketch #4 (reference Dubai Water req- attached ) 4 set of pump to deliver for 4 project zone Approximate irrigated Area of 1400 m2 Depth 2000 mm

4000 x 3000

Depth 2000 mm

Avenues Phase 2

March 2013

MECHANICAL SERVICES LOCATIONS

F W T
FPR

BSP

GSP BSP GSP

BPR D W T

BSP

GSP

BSP

S/S - 3

GSP

S/S - 4 S/S-1
BPR D W T

Avenues Phase 2

March 2013

ELECTRICAL INSTALLATIONS

Avenues Phase 2

March 2013

ELECTRICAL INSTALLATIONS
POWER DELIVERY METHODOLOGY LOAD ASSUMPTIONS LOAD CLACULATIONS AREA ALLOCATION PER S/S RMU LOCATIONS S/S LOCATIONS IN BASEMENT ROOM SIZES FOR S/S (3 OPTIONS) ELECTRICAL REQUIREMENTS (Architectural Space Allocation)

Avenues Phase 2

March 2013

POWER DELIVERY METHODOLOGY

DEWA NETWORK

RMU ROOM

TRANSFORMERS

DIFFERENT LOADS (LIGHT & POWER)

DISTRIBUTION PANELS SMDBS & DBS

MAIN LV PANELS

Avenues Phase 2

March 2013

LOAD ASSUMPTIONS
AREA RATIO 60% 40% TOTAL Front of Shop Kitchen AREA 100 m2 60 m2 24 m2 Load KW W / m2 W / m2 LIGHT 2.28 30 20 POWER 49.20 20 2000 COOLING 8.40 40 250 TOTAL 59.88 KW 598.8 Watts / SQR.MTR F&B RESTURANT F&B LIGHT

60% 40% AREA RATIO Kitchen TOTAL Front of Shop 180 m2 72 m2 AREA 300 m2 W / m2 W / m2 Load KW 20 20 LIGHT 5.04 20 800 POWER 61.20 40 250 COOLING 25.20 KW TOTAL 91.44 Watts / SQR.MTR 304.8

Avenues Phase 2

March 2013

LOAD ASSUMPTIONS
TYPE UNIT LIGHT POWER COOLING TOTAL ANCHOR / RETAIL ENTERTAINMENT ANCHOR W / m2 50 60 40 150 W / m2 30 100 40
170
SPA

W / m2 10 300 40
350

Avenues Phase 2

March 2013

LOAD CALCULATIONS
BASED ON DESIGN BRIEF

Avenues Phase 2

March 2013

LOAD ASSUMPTIONS

+40 W/M2

Avenues Phase 2

March 2013

LOAD CALCULATIONS
BASED ON DESIGN BRIEF

Avenues Phase 2

March 2013

LOAD CALCULATIONS
BASED ON DIFFERENT COOLING OPTIONS
CHILLERS OPTION 21,647.06

Chillers only 7 Transformers


DX OPTION 22,584.20

7 Nos. @ 950KW + 13 Nos. @ 1200KW

19 Nos. @ 1200KW

Avenues Phase 2

March 2013

WHICH WAY TO GO ?

CHILLER
Maintenance by Client Electricity cost by client vs. billing tenants (BTU Meters) Available cooling load is limited by Chiller Capacity

Direct-Expansion (DX)
Machines are maintained by tenants Electricity Cost is passed to tenants Cooling load can increase as much of spare electricity is available.

Avenues Phase 2

March 2013

LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD EXAMPLE 1
GLA (sq.m.) 47 47 110 30 91 38 35 53 53 F&B Designation QS Fast QS Fresh Casual QS Fast QS Fast Coffee QS Fast Coffee Coffee QS Fast QS Fast QS Fast Brand 1 KFC Taco Bell Nordsee BKK Pizza Hut Express Costa Wild Peeta Armani Fauchon Shawarmerize It Hattam India Electrical 220.00 220.00 220.00 50.00 150.00 60.00 50.00 70.00 70.00 W/m2 4,677.87 4,651.16 1,993.66 1,648.53 1,645.10 1,560.87 1,412.03 1,330.55 1,330.55

TOTAL AREA

18 Units
AVERAGE W/M2

46
48 50 62 65 57 57 26 73

50.00
50.00 50.00 60.00 60.00 50.00 50.00 22.00 60.00

1,089.56
1,048.22 1,006.44 974.34 917.99 881.68 875.35 840.34 817.44

Impulse Coffee
QS Fast QS Fast Impulse Coffee

Bateel Caribou
Subway Al Safar Dunkin Donuts Starbucks

Avenues Phase 2

March 2013

LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD EXAMPLE 2
GLA (sq.m.) 57 26 73 63 28 136 83 100 72 104 77 79 111 F&B Designation QS Fast Impulse Coffee QS Fast Impulse Casual Coffee QS Fast Brand 1 Al Safar Dunkin Donuts Starbucks Fat Burger 40 Fruits Nandos Coffee House Pad Thai Electrical 50.00 22.00 60.00 50.00 22.00 100.00 60.00 70.00 50.00 70.00 50.00 50.00 70.00 W/m2 875.35 840.34 817.44 797.58 787.12 735.29 720.55 697.42 690.70 672.43 646.50 635.73 633.08

TOTAL AREA

13 Units
AVERAGE W/M2

Ethnic Casual Ottolenghi

Ethnic Casual Nova QS Fresh QS Fast India Palace Panda Chinese

Ethnic Casual Yo Sushi

Avenues Phase 2

March 2013

LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD EXAMPLE 1
F&B 9,476.00 SQ.MTR

@ 700 W/M2

569 KW / UNIT

114 KW / UNIT

57 KW / UNIT

SIZE / QTY

USE

LOAD

Avenues Phase 2

March 2013

AREA ALLOCATION PER S/S


`

S/S-1
RMU-1

B10

S/S-3
B09

RMU-3

B08

B03 B01 B05 B07

B02 B04 B06


RMU-4

S/S-2

RMU-2

S/S-4

Avenues Phase 2

March 2013

S/S LOCATIONS IN BASEMENT

S/S - 2

S/S - 3

S/S - 4 S/S-1

S/S - 1

Avenues Phase 2

March 2013

ROOM SIZES IN BASEMENT - OPTION 1


36 Mtr. (9x4)

4.5 Mtr.

TRANSFORMER ROOM 162 m2

4 Nos.

9 Mtr.

LV ROOM 126 m2

8 Mtr.

GENERATOR ROOM 24 m2

Avenues Phase 2

March 2013

ROOM SIZES IN BASEMENT - OPTION 2


18 Mtr. (9x2)

9 Mtr.

TRANSFORMER ROOM 162 m2

4 Nos.
18 Mtr.

LV ROOM 135 m2

9 Mtr.

GENERATOR ROOM 27 m2

Avenues Phase 2

March 2013

ROOM SIZES IN BASEMENT - OPTION

18 Mtr. (9x2)

<4 Nos.

TRANSFORMER ROOM 81 m2
9 Mtr.

LV ROOM 81 m2

GENERATOR ROOM 40.5 m2


4.5 Mtr.

Avenues Phase 2

March 2013

ELECTRICAL REQUIREMENTS - Architectural Space Allocation

Services

Item

Location

QTY

Minimum Shaft Min. Volume Dimension (m x Area Minimum Height (m) Capacity (m3) m) (m2)

Notes

RMU ROOM-1 HV Rooms RMU ROOM-2 RMU ROOM-3 RMU ROOM-4 TRANSFORMER ROOM-1 Transformer Rooms TRANSFORMER ROOM-2 TRANSFORMER ROOM-3 TRANSFORMER ROOM-4 BASEMENT LEVEL GROUND LEVEL

1 1 1 1 1 1 1 1

N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A

38 38 38 38 148 148 148 148

3.1 3.1 SUBJECT TO DEWA APPROVAL 3.1 3.1 3.1 3.1 SUBJECT TO DEWA APPROVAL 3.1 3.1

Avenues Phase 2

March 2013

ELECTRICAL Requirements - Architectural Space Allocation


Minimum Qty Volume Capacity (m3) Shaft Dimension (m x m) Minimum Area (m2)

Services

Item

Location

Minimum Height (m)

Notes

LOW VOLTAGE PANELS ROOM-1

N/A

N/A

125

3.5

LV Rooms

LOW VOLTAGE PANELS ROOM-2

1 ADJACENT TO TRANSFORMER ROOM 1

N/A

N/A

125

3.5

SUBJECT TO DEWA APPROVAL


N/A N/A 125 3.5

LOW VOLTAGE PANELS ROOM-3

LOW VOLTAGE PANELS ROOM-4

N/A

N/A

125

3.5

ADJACENT TO TRANSFORMER GENERATOR ROOM-1 1 ROOM-2 Generator Rooms ADJACENT TO TRANSFORMER GENERATOR ROOM-2 1 ROOM-3 ADJACENT TO GENERATOR ROOM-3 TRANSFORMER 1 ROOM-4

N/A

N/A

24

3.5

N/A

N/A

24

3.5

Room includes Diesel Tank Good for 8 hours

N/A

N/A

24

3.5

You might also like