Types of footing
Following are the different types of footing used for concrete structure Isolated footing Combined footings
Strap footing
Mat or raft foundation Pile foundation
Isolated footings
Isolated footings are provided under each column and may
Combined footings
PROPERTY LINE
COMBINED FOOTING
COMBINED FOOTING
Combined footings
Combined footings are provided to support two or more column loads. These may be continuous with rectangular or trapezoidal in plan as shown. Combined footings become necessary under the following circumstances:
provided.
Strap footing
Strap footing is one of the types of combined types of combined. It consists of an isolated footing of two columns connected by a beam called strap beam. The strap beam does not remain in contact with the soil and thus does not transfer any load to the soil. This is provided when one of the columns is on the property line.
PROPERTY LINE
Mat foundation The is provided when the soil is having very low bearing capacity and or when columns loads are heavy, the required footing area becomes very large and uneconomical.
MAT FOUNDATION
Detailing
Size of footing Depth at footing Depth of footing edge Nominal and effective cover d/2 BM2 BM1
OWS
Development length
Minimum and maximum steel Spacing of bars and stirrups TWS d
PLAN
bd
PROBLEM
An isolated footing is to be provided for a column of section 400 mm x 400 mm. The following details re given: Height of the column =3m Main reinforcement in column = 4 Nos. 16 mm diameter. Transverse reinforcement = 6 mm at 220 mm c/c Plan size of footing = 2.7 m x 2.7 m Depth of footing at column face = 500 mm Depth of footing at edge = 150 mm
Solution:
Development length in tension = 47 = 47 x 16= 752 mm Depth at junction = 500 mm
Leg length available for column bars = Ldt 500 = 252 mm < 300 mm.
Provide 300 mm minimum. Development length of 20 mm bars in footing = 47 x 20 = 940 mm This is provided by the horizontal projection of bars. Bars need not be bent at ends in to the depth of footing.
Number of bars in footing = 11 Numbers at 200 mm c/c with a side cover of 100 mm. Width of footing= 10 x 250 + 100 x 2 =2700 mm Follow all specification of SP 34 and prepare the drawing
Square footing
400
CROSS SECTION 400 4- #16
3000 mm
27 00
#20@250
27 00
Rectangular footing
400
300
CROSS SECTION
#16@200
Ldt L dc
75 75 Ldt 75
SECTIONAL ELEVATION
PLAN
Rectangular footing
300
GROUND LEVEL DEPTH OF FOUNDATION 500 mm Ldt 75 75 Ldt 75 SECTIONAL ELEVATION L dc 6- #20 #8@200 #16@200
220 0
75
> 75
> 75
> 75
> 75
tr
48tr
75
2Df 2:1
Df
LAP
Ldt
75 75 75
L dc
300 min.
Ldt
SECTIONAL ELEVATION
LEVELLING COURSE
Member Mark
No. of bars
Diameter in mm
Total length in m
#20
Bar details
Remarks
Footing
A B
11 11
20 20
2.55 2.55
#20@250 #20@250