You are on page 1of 37

..

MTU ONSITE ENERGY




DIESEL

MTU Onsite Energy GmbH


All rights reserved

..

1978


: , ,
, ..
01. Our
Strategy
& Core
Messages

,
02. Our Roots
,
, ,
,
.
03. The Tognum
Group

MTU ONSITE ENERGY

04. The Best Solution


05. The Key Technologies
06. An Excellent Product Portfolio

80
07. MTU ValueCare

service
08. Sales
and Service
Network

09. Tognums
Global Presence

MTU Onsite Energy GmbH


All rights reserved

MTU

1909

Gottlieb Daimler

Wilhelm Maybach

Karl Maybach

Graf Ferdinand von Zeppelin

1918

On-HighwayMotoren

Off-HighwayMotoren

1966

1966

Rudolf Diesel

1969

1969

2006
1985

2002

2006

today
2011

MTU & MTU Onsite Energy

Business Units

Engines

Onsite Energy

Components

Brands

Products

Complete Drive and Propulsion Systems

Page 4 / Ariexpo Presentation/

Gas Systems

Diesel Systems Diesel Gendrive

Injection Systems

TOGNUM GROUP

Business Unit Onsite Energy & Components


Diesel Gendrive
& Systems

Gas Systems

Injection
Systems

Emergency Power Continuous Power Highspeed


Engines
Prime Power

Medium Speed
Continuous Power
Engines

Ariexpo presentation

Business Unit Engines


Marine
Yachts
Commercial
Naval

Industrial
Rail C&I
Agric. Mining

Defense

Oil & Gas

Light and
Onshore
Medium Vehicles Offshore
Heavy Vehicles

Diesel /

Diesel
,


Diesel

Engine portfolio

Series 400 / S4000

- Series 1600
- Series 2000
- Series 4000

Page 6 /Ariexpo presentation

-
-
-

Diesel & Gas Systems


Diesel
()

Utilization of
MTU engines
and third parties
engines

Series 4000

Series 2000
Series 1600

/ Diesel

Third
Party

50

100

750

300

1,000

2,000

6,000

3,000

Utilization of
MTU engines
and third parties
gas turbines

kW el

LM2500 / LM6000 (third party)

Gas Systems

Series 4000

S 400
50

Page 7 Ariexpo presentation

100

450

750

1,000

2,000

20,000

45,000

kW el

GAS POWER SYSTEMS

Page 8 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved

MTU Onsite Energy




100 KW
2 MW
1977, 30



2500

4000

1500
MTU Onsite Energy
container
service .

Page 9 Ariexpo presentation

MTU Onsite Energy


-


2000 2006
500 ( 400)

Page 10 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved

MTU Onsite Energy


R&D

ISO 9001

ISO-standards

4.200 kVA

Page 11 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved

MTU Series 4000


50 Hz, , .,
L 62
L 63
8V:
772
849 kWel
12V:
1.166
1.285 kWel
16V:
1.562
1.711 kWel
20V:
1.948
2.145 kWel

Page 12 Ariexpo presentation

MTU Series 400


50/60 Hz,
6L:
12V:

119 - 205 kWel


227 - 420 kWel


MTU


,
,


, ,



()

Page 13 / Ariexpo presentation


MTU

MTU OE


,

Low


NOx < 0,6
gr/bhphr

Page 14 /Ariexpo presentation

400 -
MTU GAS ENGINES
SERIES 400

119 420 kW

, ,
..

1500 / 50 Hz, 1800 / 60 Hz

90C / 70C, 100C / 80C

( / )

40C, 50C, 70C, 80C

1-, 2-

NOx E

250 mg/m, 500 mg/m

36.1% - 40.3%

55.7% - 51.8%

91.8% - 90.6%

Page 15 / Ariexpo presentation

PRODUCT OVERVIEW
MTU GAS ENGINE - SERIES 4000
Actual technical features:

Page 16 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved

MEP:

18,5 bar

1500 rpm

800 2200 kW

43,6%

NOX emission:

< 250 mg/mN

Gaseous fuels:

4000 -
MTU GAS ENGINES
SERIES 4000

772 2145 kW

, ..

1500 / 50 Hz

90C / 70C

(outlet / inlet)

40C, 50C

NOx E

250 mg/m, 500 mg/m

40,4% - 43.5%

48,4% - 45,9%

88,8% - 88,6%

Page 17 / Ariexpo presentation

AUGSBURG
:

,
( , ,
)
Augsburg 2 :
1 400 1 4000
- : ,
,
- :
, 2 400 1
4000, Main Monitoring Control ..


/

Page 18 /Ariexpo presentation

PRODUCT OVERVIEW
MMC MTU OG MODULE CONTROLS

MTU OG Plant Control


for all Gensets and Modules
series 400 and 4000

:

touch screen
O



Page 19 / Ariexpo presentation

MMC MTU OG Module Controls

Tobit-Server
Phone

Fax

PC
Internet

ISDN or
DSL via VPN

Phone line

Network
Firewall
Terminals

Page 20 / Ariexpo Presentation

Page 21 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved


&




(, )


CO2
, , ..



Page 22 / Ariexpo presentation

100%
Prime Energy

Losses from Transmission and Conversion

Usable Energy

Efficiency Ratio

32%
-68%
Main Power Plant

-25%

75%

District Cogeneration Plant

-4%

+
up to

Local Cogeneration Plant

Page 23 / Ariexpo Presentation

96%

Traditional Power Generation compared to Distributed CHP

167,1

114,5

Combined cycle
power plant
coal fired
=38 %

43,5 el. energy

71 losses

grid
transmission
= 90 %

41,3

electrical
energy

P = 59,2 %

2,2 losses

Primary
energy
Boiler
Fuel oil

52,6

47,3

usable
thermal
energy

41,3

electrical
energy

= 90 %
5,3 losses

76,3
losses

100
Primary energy
natural gas

Distr.
Cogeneration
gas engine
= 41,3 %
= 47,3 %

47,3

11,4
losses

Page 24 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved

usable
thermal
energy

Page 25 / Ariexpo presentation

Page 26 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved

T
&

Page 27 / Ariexpo presetnation

TRIGENERATION
PRINCIPAL DIAGRAM OF TRIGENERATION

Page 28 / Ariexpo presentation


E
heat/cold/electricity
( )

Page 29 / Ariexpo presentation

Page 30 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved

First 20V4000L62 Combined Heat and Power Plant


in Belarus, 2 MW container CHP plant

Plug-and-play solution for harsh


ambient conditions
Page 31 / MTU Onsite Energy / 30.03.2013
MTU Onsite Energy GmbH / All rights reserved

Meets the Belarussian emission limits


of 250 mg/mn NOx under all conditions
Reduced investment cost compared to
installation in a plant building
Complete system is manufacturer-tested
before shipment

Customized container designed


by MTU Onsite Energy

Greenhouse Application in the Netherlands


Customized Container Design
CHP units cover all the typical needs for greenhouses:
Electricity for artificial lighting
Heating for ideal conditions for wintertime plant growth
CO2 fertilization with engine exhaust gas

Page 32 / MTU Onsite Energy / 30.03.2013


MTU Onsite Energy GmbH / All rights reserved


HLFELD
Biogas Installation hlfeld
Customer requirements:

Operation 8000 h/a, 24 h/day


Availability > 90%
Selling electricity

1 x AE3042L1 Genset

Electrical Energy: 330 kWel

Biogas derived from fermented corn and grain

Scope of supply:
- CHP plant and auxiliaries
- Engineering of CHP plant incl. electrical appliances
- Planning of Biogas plant in cooperation with partner
- Maintenance contract
Page 33 / Ariexpo presentation

Swimming Center Albstadt

4 x ME 3042 D3 Module
Electrical Energy: 928 kWel

Page 34 / Ariexpo presentation

Heat Rate: 1107 kWth

APPLICATION EXAMPLE

Industrial AT & S Project in China

Page 35 / Ariexpo presentation

First gas engine application of series 4000 in


China
12 cylinder gas engine assure independent
power and heat supply of the printed circuit
board company
Turnkey supply of a complete MTU Onsite
Energy system

Swimming Center Albstadt

4 x ME 3042 D3 Module
Electrical Energy: 928 kWel

Page 36 / Ariexpo presentation

Heat Rate: 1107 kWth


Page 37 / MTU Onsite Energy Company Presentation/ 3/30/2013
MTU Onsite Energy GmbH / All rights reserved

You might also like