Professional Documents
Culture Documents
http://www.studygalaxy.com/
24 December 2012 PMI Revision 00 1
24 December 2012
PMI Revision 00
24 December 2012
PMI Revision 00
24 December 2012
PMI Revision 00
IS 1593 / 1971 Grades LV-MV-HV Flash point: 660C (minimum) Viscosity (Max.): 80-120-370 CST at 500C Gross heating value: 10270 Kcal/kg Total Sulphur (Max.): 3.5-4-4.5%by weight
24 December 2012
PMI Revision 00
Presentation Outline
FO unloading system FO storage FO pressuring pump house Safety procedure in FO handling
24 December 2012
PMI Revision 00
FO unloading system
Heavy oil is received at the site in railway tankers of 20 tonne capacity each An unloading header with number of receiving points for number of wagons unloading is provided. The connections between loading header and tankers are through rubber flexible hosepipes. Railway tankers are equipped with steam heating coils.
24 December 2012 PMI Revision 00 7
Strainers
Transfer P/P
24 December 2012 PMI Revision 00 8
FILLING HDR
Suction HDR
Return Hdr
I/L
HEATER
Steam
24 December 2012
O/L
R/C
PMI Revision 00
OIL TANK
OIL TANK
Recirculation P/P
Suction Header
24 December 2012 PMI Revision 00
Return Header
10
Steam to Atmosphere
Flash Tank
Sump Pump
24 December 2012 PMI Revision 00 11
DRAIN HDR
Drain Tank
24 December 2012
PMI Revision 00
12
CV
HORV
24 December 2012
PMI Revision 00
13
THANK YOU
24 December 2012
PMI Revision 00
14