PILING WORKS

DEFINISI
Cerucuk merupakan struktur binaan bawah tanah yang menerima, menanggung dan menyebar beban bangunan dengan selamat kepada tanah bawah

Kategori
Di antara bahan yang biasa digunakan untuk pembuatan cerucuk galas beban adalah sepeti berikut:
Cerucuk Cerucuk

konkrit pra tuang ( precast concrete pile)

konkrit tuang di situ ( insitu precast concrete pile)


Cerucuk

kayu ( timber pile) bakau

Cerucuk Cerucuk

keluli ( steel pile)

Istilah-istilah kerja cerucuk(piling works terminology)


Point bilangan point tiang-tiang cerucuk pada suatu tetopi cerucuk ( pile cap)
Tetopi

cerucuk ( pile cap) papak konkrit yang dibina di atas tiang cerucuk

Istilah-istilah kerja cerucuk(piling works terminology) (contd)


Singly

/ cluster bilangan point pada tetopi cerucuk

permulaan ( initial piles) tiang cerucuk yang mula-mula sekali dibenamkan ke dalam tanah
Cerucuk

Cerucuk

sambungan ( extension piles) tiang cerucuk yang dibenamkan selepas cerucuk permulaan. Cerucuk sambungan akan disambungkan kepada cerucuk permulaan

Butiran kerja/ taking off list


1.
2. 3. 4. 5. 6.

T.O.L Mobilisation of piling plant Supply of initial piles Driven of piles Jointing Cut off pile caps Testing

unit item nos m nos nos item

Descriptions
Mobilisation of piling plant Allow for the provision of all necessary piling equipment, plants, tools and ancillary equipment to site. Handling, assembling, erecting, dismantling and removal off the sites after the completion of the operation - Item

Descriptions ( contd)
Supply of initial piles Supply, deliver and unload on site . mm X .. mm X m long initial piles nos Supply of extension piles Ditto extension piles not exceeding.exceeding.. - nos

Descriptions ( contd)
Driven of piles Drive only vertical ..mm X mm precast / timber pile - m

Driven of piles activity

Descriptions ( contd)
Jointing of piles Supply and fixed pile extension joint, 16mm thk M.S plate 300mm X 300mm overall with splayed conners with 100mm X 100mm M.S plate around perimeter of plate anf fillet welded all round - nos

Descriptions ( contd)
Cut off pile caps Cut off ..mm X mm precast conc. / tanalised kempas timber piles at required level including all appliances. - nos

Descriptions ( contd)
Testing Provide all equipment hydraulic jack, deflection gauges, kentledges, temporary staging and test on piles size .mm X .mm to a vertical loads .tonnes including all extra cost. - item