EXECUTIVE SUMMARY
Introduction of company. Pestle & SOWT Analysis. Research Main process Manufacturing in plant, Designing, Boiler, Bridge making processes are discussed. Prioritize process Analyze. Suggestion & Conclusion
INTRODUCTION OF COMPANY
Private Limited group One of the top EPC Engineering, LPG Marketing and Trade services provider of Pakistan Rich experience in Design, Detail Engineering, Manufacturing, Site Erection Head office is in M8 Johar Town Lahore Sunder Estate plant. 3 sites Lahore Ferozpur road, Rawalpindi, BRTS Workforce: Overall 300 labour is working.
DEPARTMENTS
Admin department. Accounts department. Design department. Production planning department. Quality control department. Management department. Procurement department. Business development department. Store and Workshop.
PRODUCTS:
Storage tank
PRODUCTS:
Boiler
PRODUCTS
Pressure vessels
PRODUCTS
Sugar plant
PRODUCTS
Steel structure
PRODUCTS
SWOT ANALYSIS
Strength: Design and engineering is done under one roof. They hire professionals of uncanny capabilities. They have highly qualified consultants whose opinion is valued in their field. They provide manufacturing, erection and installation services to their valued customers in order to retain them. They get feedback of customers to draw in and maintain their services for existence and identity in todays dynamic market. They integrate safety into the development and execution of all FABCON processes.
After an enormous discussion with them, we have come to know that following are the customers, suppliers & competitors of them. Customers C&W Department. NLC (National Logistics Cell) Habib construction. GD Sugar mills.
RESEARCH
Suppliers
New Shalimar Street. Ishtiaq steel mill. NI Traders. Bashir Pipes. Modern Pipes. Pakistan Steel Mill.
RESEARCH
Competitors:
Fast tube mill. DDFC (Design Development Fabrication Company), PDL (Premier development league)
PROCESS
Admin department
Read the tender in newspaper and apply. If approved then send to
Business development
PROCESS
Design department
Production planning department
Workshop
Store
PROCESS
Procurement department
Purchased raw material is send to store and then again to workshop. Raw material is boiled, send material to grinding machine, cut and then paint the material with wet oxoid, weld, bend then send to material handling equipment.
PROCESS
Supervisor of Quality assurance department checks the quality of product Material dispatched
Installation site
Assembling, quality will be again checked Products are assembled to make structure
DESIGNING PROCESS:
Method 1:
Design given by customer
Checked and verified by company
Work start
Method 2:
Design offered by company (10-12) Customer verifies the design Approval of design Project start
Plant (Manufacturing
process)
F a n
Header
beams
Raw material
Mud drum
Fire
F a n
Steam drum
Fire
Gas Cutter
Welding
Roller
BOILER
Large cylindrical vessel called the Drum Hold large quantity of water required for steam generation. Drums weigh anywhere 100 to 250 tons with very high thickness. Manufacturing drums need special machines and process.
STAGES
Plate quality check by ultrasonic test. Review ultrasonic test report and steel supplier test report Move plate to heating furnace and heat to 850 - 870 deg C. Use incremental pressing in a 6000 or 8000 ton hydraulicbeam press and work it to get the shell shape based on the shell inside diameter
STAGES
Cold press the plate to the final specified shape when plate is below 130 deg C, but not below room temperature The shell is moved to a special weld bevel machine for beveling the ends
STAGES
using
the
automatic
STAGES
The shell is welded 20 % on each side alternatively to control distortions of the shell Grind the longitudinal weld flush both inside & outside and do magnetic particle test
STAGES
If necessary repair using a low hydrogen electrode at 150 deg C preheat Re-radiograph after repair till test results are satisfactory
STAGES
All nozzles and nipples are drilled in the drum shell Weld the nozzles and nipples 150 deg C pre heat Join the first two shells. Radioagraphy & magnetic particle test. Finally paint the outer surface and the drum is ready for shipping to the site.
BOILER READY
Stage 1
Stage 2
Stage 3
Stage 1:
Piling Bore Iron casing
Through Rig/wench machine
Concrete 1:1:2
STAGE 2:
Making of guarders:
Shuttering Concrete 1 day to get ready Watering for 28 days
Concrete
STAGE 3:
Installation of guarders Installation of roof slabs Railing Gaints injected
Shuttering
Space of 1 inch
Concrete 1 : 1.5 : 3
Unshuttering
SUGGESTIONS:
ERP software. Increase/ install more plants. Increase skilled staff, skilled labour, transport, inputs, services, safety etc. Maximum flexibility in the layout of product and process in order to modify it according to environment.
CONCLUSION:
Overall, Fabcon is among the best design and engineering companies. It has occupied great importance through its dedicated services, effective communication with customers, long lasting relations with the suppliers, strong distribution network, highly skilled and expert staff and using the latest technology to tackle the arising problems.