Professional Documents
Culture Documents
DCN No.: PE/DAE-T/00774 To: Daelim Industrial Co., Ltd 17-5, Yoido-Dong, Youngdungpo-GU Seoul 150-010 Korea Pyry Energy AG Zurich, Switzerland Attn:
Pyry Energy Ltd. Hardturmstrasse 161 P.O. Box CH-8037, Zrich Switzerland Tel. +41 44 355 55 54 Fax +41 44 355 55 56 http://www.poyry.com shoaibaproject@poyry.com
Date: 29-Jun-2012 Mr.Sang Kyu Kim Project Manager Email : skyukim@daelim.co.kr Fax: 02-2096-6332 Mr. Andy Bachofen Engineering Manager Email : andy.bachofen@poyry.com Fax : 01 464 7627/004144-55-5556 Mr. Engr.Yousef A.Shubaili Project Manager Email : GEP-WSPM3@se.com.sa Fax: +966-2-6538112
Cc:
Attn:
Saudi Electricity Company Generation Project Dept. Western and Southern Operating Area P.O. Box 9299 Jeddah 21413, Kingdom of Saudi Arabia PROJECT
Attn:
CONSULTANCY SERVICES FOR SHOAIBA II SIMPLE CYCLE & COMBINED CYCLE POWER PLANT Incoming Ref. No.: DH-PH-T-0621, Daelim
With reference to contractors transmittal of above reference enclosing drawings / documents associated with Shoaiba II Simple Cycle & Combined Cycle Power Plant following are the comments / approvals on the drawings / documents.
SL. No. 1 2 3 4 5 6 7 8
Rev.
Title
Code of Approval / Comments [B] [B] [B] [B] [B] [B] [B] [B]
1 1 1 1 1 1 1 1
Schematic Diagram for Tank External Connection Drawing for Tank External Layout Drawing for Tank External (Fuel Oil Tank, 1OF4) Layout Drawing for Tank External (Fuel Oil Tank, 2OF4) Layout Drawing for Tank External (Fuel Oil Tank, 3OF4) Layout Drawing for Tank External (Fuel Oil Tank, 4OF4) Layout Drawing for Tank External (Demi . Water Tank, 1OF2) Layout Drawing for Tank External (Demi
A. Reviewed and Approved. B. Reviewed and Approved as Noted. C. Not Approved. Returned for Correction D. For Information Only
Note: The comments and / or approvals in no way relieves the contractor from his obligations in the contract to ensure conformance to the specifications as well as any modifications found necessary by the during installation for satisfactory commissioning and operation of equipment / works on contract. Any deviation from the specifications found subsequent to approval are to be corrected by the contractor to the satisfaction of Consultant/SEC/Employer.
Page1 of 2
Pyry Energy Ltd. Hardturmstrasse 161 P.O. Box CH-8037, Zrich Switzerland Tel. +41 44 355 55 54 Fax +41 44 355 55 56 http://www.poyry.com shoaibaproject@poyry.com
Title
. Water Tank, 2OF2) 9 10 11 12 13 14 15 16 17 18 19 VP-4600-319-001-ALL-109 VP-4600-319-001-ALL-110 VP-4600-319-002-ALL-101 VP-4600-319-002-ALL-102 VP-4600-319-002-ALL-103 VP-4600-319-002-ALL-104 VP-4600-319-002-ALL-105 VP-4600-319-002-ALL-106 VP-4600-319-002-ALL-107 VP-4600-319-002-ALL-108 VP-4600-319-002-ALL-109 1 1 1 1 1 1 1 1 1 1 1 Layout Drawing for Tank External (Pota ble Water Storage Tank, 1OF2) Layout Drawing for Tank External (Pota ble Water Storage Tank, 2OF2) Schematic Diagram for Tank External Connection Drawing for Tank External Layout Drawing for Tank External (Desa linated Water Tank, 1OF2) Layout Drawing for Tank External (Desa linated Water Tank, 2OF2) Layout Drawing for Tank External (Fire Water Tank, 1OF2) Layout Drawing for Tank External (Fire Water Tank, 1OF2) Layout Drawing for Tank External (Filt ered Water Tank) Layout Drawing for Tank External (Dist illate Oil Tank, 1OF2) Layout Drawing for Tank External (Dist illate Oil Tank, 2OF2) [B] [B] [B] [B] [B] [B] [B] [B] [B] [B] [B]
A. Reviewed and Approved. B. Reviewed and Approved as Noted. C. Not Approved. Returned for Correction D. For Information Only
Note: The comments and / or approvals in no way relieves the contractor from his obligations in the contract to ensure conformance to the specifications as well as any modifications found necessary by the during installation for satisfactory commissioning and operation of equipment / works on contract. Any deviation from the specifications found subsequent to approval are to be corrected by the contractor to the satisfaction of Consultant/SEC/Employer.
Page2 of 2