Energy Efficiency Bulletin

Case Study Bulletins from CII-Sohrabji Godrej Green Business Centre


Bulletin No. 5

Interconnection of ACW & VAHP Sumps & Discharge Lines so as to Switch Off ACW System During Favourable Winter Conditions

September 2007

Company details Arvind Mills Limited, established in the year of 1930, is the world's largest producer of Denim. Arvind Mills Limited also has Asia's largest effluent RO (Reverse Osmosis) system and the first denim mill in the World to receive Eco-Tex Certification from Germany.
GTG

New inter connecting line


CWP Pump ACW Pump CT Fan VAHP

Inter connection of cooling water users

Schematic layout of cooling water system Process flow sheet


Cotton Spinning Knitting Gray Knit Dyeing Mercerizing Weaving Singeing Desizing Finishing Dyeing if Req Finishing inspection Scouring
Mercerizing

Cost benefit analysis


l Annual savings Rs 0.77 million

(0.0195 million USD)


l Investment

Bleaching

Rs 0.01 million (0.00025 million USD) Less than one month

l Payback

Project details The cooling water system has two pumps connected to a common header. Two pumps namely ACW (Auxiliary Cooling Water) pump and CW (Cooling Water) pump supply cooling water to all the end-users. One of the major users of the cooling water was the air compressors. In the winter season, it was observed that the cooling water flow through compressors is more than the required quantity. The temperature difference (rT) across the end users were measured and were found to be between 1oC and 2oC. Typically, all the end users are designed for rT of 8-9oC. The low rT value across the cooling tower indicated excess flow of cooling water to the users.

Based on all measured and calculated values, plant carried out a trial by stopping one of the pumps (ACW pump). In winter CW pump alone caters to the entire demand & ACW pump is switched off. Features ACW & VAHP (Vapour Absorption Heat Pump) sumps & discharge lines have been interconnected. This has resulted in following benefits 1) In winter CW system alone caters to the demand & ACW pump is switched off. 2) 3) Greater flexibility for operation. Savings in pumping power to the extent of 2.4 lakh units per annum.

Issues faced during implementation No major issues were faced during the implementation of the project.The project could be implemented on line. Comments by the plant team The project was Implemented by Arvind Mills limited, Santej Unit in the year 2005 The project was identified during an internal audit exercise and has given excellent benefits. Financing of the project The plant has invested about Rs 0.01million for implementation of the project.The investment has been taken up fully with internal funds. Results of the project The annual energy savings potential is Rs 0.77 million (0.0195 million USD). The investment required is Rs 0.01million (0.00025 million USD) with a simple payback period of less than 1 month.

About CII & CII-Godrej GBC CII is a non-government, not-for-profit, industry led and industry managed organisation, playing a proactive role in India's development process. Founded over 112 years ago, it is India's premier business association, with a direct membership of over 6500 organisations from the private as well as public sectors, including SMEs and MNCs, and an indirect membership of over 90,000 companies from around 350 national and regional sectoral associations. Cll-Godrej GBC is a Centre of Excellence in Energy Efficiency, Green Buildings, Renewable Energy, Water, Environment & Recycling and Climate Change activities in India. About 3 Country Energy Efficiency The Project "Developing Financial Intermediation Mechanisms for Energy Efficiency Projects in Brazil, China and India" aimed to substantially increase investments in energy efficiency by the domestic financial sectors in Brazil, China and India. The project was a partnership between the World Bank, the United Nations Environment Programme (UNEP) through the UNEP Risoe Centre on Energy, Climate and Sustainable Development (URC), and institutions in Brazil, China and India.

Benefits of the project


l Greater flexibility in operation l Reduction in pumping power

Additional information is available at www.3countryee.org This Energy Efficiency Bulletin comprises of a series of case studies on successful energy efficiency projects implemented by Indian industry. The bulletin is supported under the "3 Country EE" initiative and by USAID.

consumption

For further details contact


Mr Dinesh Yadav V.P (Engineering) The Arvind Mills Limited Naroda Road, Ahmedabad - 380 025 Tel: 079 22203030 Fax: 079 22204314 Email : dinesh.yadav@arvindmills.com