Name Total Experience

: :

Walid Salama Mohamed Abdel Salam http://eg.linkedin.com/pub/walid-salama/38/862/478 +14 Years in EPC Projects with multinational companies for Petrochemical, Chemical, Oil & gas, Refinery, Power station, Fertilizer. + 7 Years as Project Control Engineer (Estimation, Planning, QS, Technical office Engineer) CCC, Hitachi, Techint, EPP + 5 Years as Project Field Engineer Bechtel, KBR, JGC, Uhde + 1 Year as Construction Coordinator VSA Veolia, Saipem S.A and Al Jaber +1 Year as (PMC) Project Management Consultant Engineer Bechtel 1991 1997 Bachelor degree in Mechanical Engineering at Benha Faculty of engineering English - Arabic June 4, 1974 Married (1 children) 14 sedeq shipop sidi bisher bahry Alexandria, Egypt 00 2 0111 0296968 (mobile) w.salamam@gmail.com i_walidnew@yahoo.com Piping and Mechanical Engineering Project Planning and control Microsoft office (Word, Excel, Access, Power point). Primavera P3/P6, Auto-cad AVEVA (VANTAGE) PLANT DESIGN MANAGEMENT SYSTEM 11.4.SP2/11.6.SP2 as a Key user Taliso (CCC spooling software), Talisman (CCC Material, MTO and Progress database) and VBC (CCC document control) SAP PM Consultant (Training Course Stage)

Qualifications

Languages Date of Birth Status Home address Telephone Email address

: : : : : :

Studies

Computer experiences:

General: Project Management of EPC Projects in the Petrochemical, Chemical, Oil & gas, Refinery, Power station, Fertilizer. Provide leadership to planning engineers, schedulers and cost engineers to plan, monitor, and control the execution of the project within the time and budgetary parameters, optimizing resource utilization. Contract administration Issue and review procedures and method of statement as per project specification Analysis of the Project Documentation Material control management IT Automation (Material, piping spools, ITP, Progress, Piping Test package and mechanical completion systems tracking) Estimation, preparation of quotations, technical interactions Piping Engineering &technical office, Piping fabrication, Piping erection, Piping Hydro test, Pre-commissioning & Commissioning, Piping painting and insulation, Materials take off, Isometric bill of material, As built DWG, Piping field engineer, Piping Inspection (Pre-test Punch list & Reinstatements) LNG Tank, API 650Tank

Page 1 of 4

Work experience 1) Dec 2010 -Present EGYPTIAN PROPYLENE & POLYPROPYLENE CO__CAIRO -EGYPT Sr. Project Control Engineer (Estimation, QS, Cost Control and Planning) Prepares material, labor, and construction equipment cost estimates Performs Cost Estimation and Unit Rate Analysis of Piping, Insulation, Equipment Erection, Fireproofing, Instrument, Electrical, Civil, Steel Structure, and Painting proposed by Bidders based on Inquiry Documents. Prepares Database for all Quotations/Priced BOQs submitted by Subcontractors for work rate & unit rate comparison; Prepares clarification with Bidders in regard to their Tender Proposal. Provide Integrated Project and Operations Plans with 90 day look heads. Provide technical support in the area of planning for input into field development, plant or facility upgrades or changes, and relating to every phase of the Opportunity Realization Process, in terms of screening studies, resourcing and man-hours estimates including contingencies and commitment control. Interface with Project teams, Asset/Area Engineering teams, and major contractors, ensure that established processes and procedures for obtaining Engineering/Project schedule inputs and services are implemented in the project deliveries. Prepare the progress measurement system and review progress S curves at periodic intervals. Assist QS Manager. Quantity take off for design drawings & design updates / variations Review Method of Measurement Jan 2010 Dec 2010 VSA CONSORTIUM_______ RAS LAFFAN - QATAR (Veolia, Saipem S.A and Al Jaber Transport & General Contracting LLC) GTL PROJECT - Effluent Treatment Plant Construction Coordinator for Effluent Recovery Unit (ERU) Co-ordinate daily meeting with the discipline Construction Engineers leading up to the Multi-discipline Punch-out Agree the categorization of identified punch list by printing a master copy of the punch list & submitting to all parties for approval & signature. Monitor the ongoing closure of punch lists. When all category 'A' punch list items are clear, agree with Commissioning an acceptable amount of outstanding category 'B' punch list items & issue the Handover Dossier as detailed in the CP Handover Procedure. Bechtel Power Corporation of the USA joint venture with the Ministry of Electricity and Energy of Egypt. (PGESCO) Construction/Startup Management for EL TEBBIN THERMAL POWER PLANT (PMC) Project Management Consultant Engineer Provide and coordinate responses to contractor(s) Requests for Information. Provide technical guidance to contractors. Prepare field design changes such as field change requests and notices. Verify Contractor(s) installed quantities. Provide input to the project critical action item list as required. Perform Contractor coordination as required including administration of back charges Ensure the latest design documents and shop drawings are being used to accomplish the work. Participate in weekly project safety walks and meetings Page 2 of 4

Jan 2009 Jan 2010

Nov 2006 Jan 2009

Consolidated Contractor Company WLL (CCC) SAUDI ARABIA Contract Administrator EPC Project (AL Khafji Field Development Plant, Phase I, Onshore Facilities Project (KFDP) Collecting data about potential subcontractor quality and capability Preparing bid Packages. Recommending if a contractor assessment audit should take place Carrying out contractor assessments if required Preparing contract agreements Cost analysis of bids and preparation of price comparison sheets for further management approval Reporting problems and subcontracted work performance to the project manager in consultation with Construction, procurements and QA/QC mangers Participate in tender committee meetings Arranges the Kick of meetings with subcontractors Mechanical Completion (MC) Handover Engineer JUBAIL CHEVRON PHILLIPS PROJECT (JCP) Ensure Contractors MC activities are performed in accordance with the Mechanical Completion Manual. Ensure contractor completes the correct Mechanical Completion Check Records (MCCR's) as detailed in the Responsibility Matrix appended to the MC Specification ensuring the inspection, witness, hold & approval points are adhered to. Monitor the completion progress of each pre-defined MC Package & issue the Status Index to Contractor, Construction & Commissioning when all MCCR's are complete. Mechanical and Piping Engineering Office Section Head. IWSPP (250MW POWER & RO DESALINATION PLANT) Monitoring and controlling the engineering activities for each unit Special coordination among engineering disciplines (normal coordination is a function of the discipline lead engineer) Planning and supervising activities Review of technical and procedural documents Review of Contractors and vendors' concession report (CR) and, technical review/comment of vendors' non-conformance report (NCR) Providing technical support to procurement and construction Preparation of engineering section of monthly progress report Review of Project Schedules from engineering point of view Ensuring engineering activities complete according to schedule Ensuring engineering deliverables meet project quality requirements Control of engineering correspondence including preparation of minutes of meetings Assists Lead Engineer on piping related problems to obtain vendor information; substitutions and other design related piping problems Determined the scope of any piping areas not shown on the normal piping drawings, such as package unit interconnection piping and lubrication systems on equipment Provided technical assistance to the Mechanical Superintendent, Piping Superintendent, General Superintendent and Lead Engineer and keeps them informed on matters relating to QC. Established with the commissioning group and client personnel, parameters on testing, installation and turnover of systems Determined area priorities for piping installation through consultation with Supervision Established communications with the Piping Design Group to resolve design problems

Page 3 of 4

Oct 2005 Nov 2006

Uhde (A company ThyssenKrupp Technologies) (German company) Sr. Piping Field Engineer HELWAN AMMONIA / UREA PROJECT PDMS PIPING DESIGNER Established communications with the Piping Design Group to resolve design problems JGC CORPORATION (Japanese company) Sr. Piping Field Engineer DOLPHIN ENERGY LIMITED (Ras laffan Qatar) Performed inspection of all piping work in progress on a continuing basis Witnessed Assisted the Piping Superintendent and Lead Engineer in solving piping problems BECHTEL OVERSEAS CORPORATION (American company). Sr. Piping Field Engineer EGYPTIAN LNG PROJECT Performed inspection of all piping work in progress on a continuing basis Witnessed Assisted the Piping Superintendent and Lead Engineer in solving piping problems Assisted the Piping Superintendent and Lead Engineer in solving piping problems Issued job wide inspection criteria that may be over and above the normal piping inspection Reviewed subcontractor invoices and verifies installed quantities of it. (KBR) Kellog Brown & Root DSD FERROMETALCO. (German company) Sr. Project Engineer (LNG Tanks) Damietta LNG Project, SPANISH EGYPTIAN GAS COMPANY (UNION FENOSA SEAGAS) Act as deputy to the Project Manager to coordinate and control the construction tasks relative to the project Techint Cimimontubi. (Italian company) Technical office Engineer Maximization of gas oil project (AMOC) Fincimec Impianti Industrial (Italian company) Technical Office (Piping and Mechanical Engineer) Lube Oil Expansion Project (AMOC) Hitachi Plant Company. (Japanese company) Technical Office - Piping engineer EZZ Hot Strip Mill AinSukhna Project

Jan 2005 Oct 2005

Oct 2003 Dec 2005

Jan 2002 Sep 2003

Feb 2000 Dec 2001

Dec 1999 Feb 2000

Jan 1998 Nov 1999

CAREER SYNOPSIS Walid Salama being involved in all areas of project management from conceptual design through construction to commissioning and hand-over Walid Salama studied mechanical engineering; he matured into the area of project management consultancy from periods spent in accountancy, engineering and system development where he has provided services directly to major companies in and throughout Gulf and Egypt Walid Salama is married with one child, resides in Egypt and communicates native language Arabic and is fluently in English.